This is Sandfire Resources' Kalkaroo Copper-Gold Project financial community site visit presentation, dated 25 November 2026 and lodged with the ASX (ASX: SFR). It introduces the company's strategy and copper portfolio, then covers the Kalkaroo project in South Australia: reserve and resource base, the staged entry agreement with Havilah Resources, location and infrastructure, geology, heritage and approvals, the drilling program and pre-feasibility study (PFS) plan, and regional exploration. It closes with key messages and an appendix on Mineral Resource and Ore Reserve disclosures, with an agenda for the site visit day. Figures are in USD unless otherwise stated.
Uses this deck’s cover as a style reference for slides made from your own content. Or pick any page below to use its layout as the reference.
Quick Navigation
Tags
Share the slides
This is Sandfire Resources' Kalkaroo Copper-Gold Project financial community site visit presentation, dated 25 November 2026 and lodged with the ASX (ASX: SFR). It introduces the company's strategy and copper portfolio, then covers the Kalkaroo project in South Australia: reserve and resource base, the staged entry agreement with Havilah Resources, location and infrastructure, geology, heritage and approvals, the drilling program and pre-feasibility study (PFS) plan, and regional exploration. It closes with key messages and an appendix on Mineral Resource and Ore Reserve disclosures, with an agenda for the site visit day. Figures are in USD unless otherwise stated.
Detailed view of each slide page, including layout, key content and visual elements.
Title slide for Sandfire's Kalkaroo Copper-Gold Project financial community site visit, dated 25 November 2026, with the tagline We mine copper sustainably to energise the future.
White slide with the Sandfire logo top left, a red and black title block on the left and a large fragmented red flame graphic on the right.
Two columns of legal text covering the general disclaimer, forward-looking statements and statutory versus non-statutory measures. It states that all figures are in USD unless otherwise stated and that the presentation was authorised for release by CEO and Managing Director Brendan Harris.
Dense two-column text page under a red title with a grey footer bar and page number.
Sandfire acknowledges the Traditional Custodians of the land on which Kalkaroo is located, the Ngadjuri, Adnyamathanha and Wilyakali peoples, and pays respects to Elders past, present and future.
Full-bleed aerial photo of the Kalkaroo site with a translucent text panel at upper left and the Sandfire logo at upper right.
Five key messages: low-cost entry to one of Australia's largest undeveloped copper-gold projects; an existing Resource and Reserve with growth potential; potential for a long-life, low-cost, scalable operation; another belt scale exploration opportunity; and a tangible growth option offering asymmetric upside.
Five stacked horizontal grey bars, each led by a red square icon tile, under a red title.
Agenda for Wednesday, 25 November 2026: the site visit runs 9:30am to 2:00pm with six items from welcome and safety briefing to Q&A. A Getting home panel lists departure at 2:00pm, the drive to Broken Hill, a charter flight to Adelaide and arrival at 6:00pm.
Three columns: numbered agenda list on the left, a dark Getting home timetable in the middle and a photo of the core processing facility on the right.
Section divider introducing the company overview section, captioned Photo: Motheo processing plant.
Full-bleed photo of a large mill at the Motheo processing plant with workers on a stairway and a translucent title box at lower left.
Sets out Sandfire's purpose, We mine copper sustainably to energise the future, five values (Honesty, Respect, Collaboration, Accountability, Performance) and four strategic pillars: deliver safe, consistent and predictable performance, reduce carbon intensity, increase reserves, and demonstrate capital discipline.
Framed diagram with a values column on the left, a purpose banner, four pillar tiles and an operating-model strip across the bottom.
World map of Sandfire's assets. For FY26 MATSA shows 4.5Mt ore processed, 94.5kt CuEq, implied C1 unit costs of US$0.88/lb and a 55% operating margin; Motheo shows 6.1Mt, 59.7kt, US$1.09/lb and 62%. A bar chart shows CuEq production growing +68% since FY23 to 155kt, and Kalkaroo is shown with a planned ~130km drilling program and PFS underway.
Grey world map with callout boxes for each asset, a legend at lower left, a revenue donut and a CuEq bar chart at right, and footnotes at the bottom.
US$342M net cash and US$650M undrawn CRF at September 2026. Q1 FY27 revenue was US$480M and Underlying EBITDA US$272M, with net cash after a US$117M (A$164M) dividend and US$53M of tax payments; the chart notes +US$687M added to the balance sheet over two years.
Grey text panel at left with three headed sections and a framed net cash/(debt) bar chart from Sep-24 to Sep-26 at right.
Table of FY27 guidance by MATSA, Motheo, Corporate and Group with FY26 actuals in brackets. Group guidance includes copper 99-111kt, copper equivalent 150-166kt (FY26 155.2kt), underlying operating cost US$688M and total capital expenditure US$299M, including US$51M of Kalkaroo PFS costs.
Full-width red-headed table with shaded section rows for Production, Operating Costs and Capital Expenditure, and small-print notes underneath.
Section divider for the Kalkaroo Copper-Gold Project at a glance section, captioned Photo: Curnamona Province, South Australia.
Full-bleed dusk aerial photo of an access road, camp and a floodlit drill rig with a translucent title box at lower left.
Tile dashboard for the project: 100Mt Ore Reserve at 0.47% Cu and 0.44g/t Au, 224Mt sulphide Mineral Resource at 0.49% Cu and 0.36g/t Au, an exclusive right to acquire 80%, and ~US$70M PFS targeted for completion in H2 FY28. Other tiles cover ~130km of drilling with six rigs, an 80-person camp, 8,847km2 of regional tenure and an A$30M minimum spend.
Left panel on the Havilah partnership with a drill rig photo and a grid of KPI tiles with large red numbers on the right.
Four themes: low-cost staged entry (A$105M upfront secured the exclusive right to acquire 80% for a further A$105M, with Havilah free-carried on 20% to FID), expansion upside from an open orebody (224Mt resource, 10-20Mt annual throughput alternatives), a preferred jurisdiction near infrastructure, and replicating the Kalahari Copper Belt playbook.
Four stacked grey rows with red icon tiles on the left and a tall drilling photo on the right.
Section divider for The Kalkaroo Copper-Gold Project, captioned Photo: Infill and extension drilling at Kalkaroo.
Full-bleed sunrise photo of a drill rig and support trucks with a translucent title box at lower left.
Kalkaroo is in north-eastern South Australia, ~500km north-east of Adelaide and ~90km west-north-west of Broken Hill. Barrier Highway, a railway line, Broken Hill Airport and links to Port Pirie, Whyalla and Port Adelaide are listed as regional infrastructure.
Bulleted text panel on the left and a regional map with an Australia inset, legend and 200 km scale bar on the right.
Describes the Proterozoic Curnamona Province and the Kalkaroo deposit: a 224Mt sulphide Mineral Resource at 0.49% Cu and 0.36g/t Au extending over 2.5km of strike, with Tertiary supergene enrichment and the orebody open in multiple directions. A coloured geology map with prospects such as Homestead, Brooks Dam and Eurinilla Dome accompanies the text.
Left text panel with two headed sections and a large coloured geological map with legend and 40 km scale bar at right.
Site access, power, water and facilities: ~50km by existing road to the Barrier Highway, a proposed rail siding ~75km from site, and a ~100km 220kV transmission line required to connect into the Broken Hill substation (notional alignment only). Groundwater is being assessed in the PFS and the neighbouring Honeymoon mine is noted.
Text panel with three headed sections at left and a zoomed site map showing roads, powerlines, Honeymoon and Cockburn at right.
Kalkaroo sits on the traditional lands of the Ngadjuri, Adnyamathanha and Wilyakali peoples. A Native Title Mining Agreement with NAWNTAC is in place, and heritage monitors have been on site with monitoring in April, May/June, June/July, September, October and November.
Three traditional-owner cards on top, two bulleted panels below and a tall photo of the heritage survey team at right.
Covers the approvals pathway (State and Federal approvals under the EPBC Act, with a bilateral agreement), protected species (Plains Wanderer, Purple-wood Wattle) and surface water management for an ephemeral creek, with low annual rainfall of ~200mm. A Next steps box lists baseline studies and commencing environmental impact assessment.
Three photo-topped columns with bullet text plus a separate Next steps panel at the right.
Section divider for progressing drilling and technical studies, captioned Photo: Kalkaroo - Core processing facility.
Full-bleed interior photo of the arched core processing shed with workers and roller tables and a translucent title box at lower left.
Names Jason Grace (Chief Operating Officer) and Ian Kerr (President Projects and Studies, Study Manager) and shows eight key PFS project areas from geology to logistics and port. A footer notes six drill rigs operating (four diamond, two RC), ~130km drilling, an 80-person camp and PFS completion targeted in H2 FY28.
Org-chart style block at left with two portrait tiles, projects team and consultants boxes, and a 4x2 grid of project-area cards at right with a summary strip below.
Under the subtitle Replicating the success of Motheo, four photo cards cover a flat topographical setting, direct highway access (~50km to the Barrier Highway), existing rail and port links (siding ~75km away) and proximity to the grid (~100km, 220kV line). A summary bar says less new build supports lower capital intensity, subject to approvals.
Four equal photo-topped cards with bullets above a full-width summary bar and footnote.
~130km infill and extension drilling program commenced in FY26 with six rigs (four diamond, two RC). It drilled 8.7km in Q1 FY27 plus 6.5km in October, US$51M is expected to be capitalised in FY27, and the new PFS is expected to complete in H2 FY28.
Grey bullet panel at left and a large photo of a drill rig on the right.
A plan map of the drilling program beside a cross-section A to A' showing drill-hole traces (for example 26KKRCD0024 and 26KKRCD0011) over mineralisation styles. The note says interpreted zones are based on previously reported historical information and no new assay results are presented; assays are pending.
Two framed panels side by side: a plan view with legend at left and a larger cross-section with legend and scale bar at right.
Describes an updated 3D lithostratigraphic and structural model and four principal Mineral Resource modelling domains: stockwork-breccia, vein, stratiform and supergene gold. A conceptual cross section looking NNE is paired with core photos.
Text panel at left and a framed conceptual cross-section surrounded by three drill core photos at right.
Maps the weathering profile across three interpreted domains: oxyhydroxide-native copper, chalcocite-goethite and chalcopyrite-pyrite, illustrated with drill core photographs. A bar notes it is a key input into most facets of the mining value chain.
Wide cross-section with legend on the left, three stacked core photos in the middle, a text panel at right and a summary bar below.
Workstream table headed PEPR and EPBC approvals are the critical path to FID. Drilling completion is expected in H1 FY28, studies and engineering are scheduled for H2 FY28, baseline surveys need a minimum of two years, and PEPR and EPBC approvals are marked the likely project critical path.
Three-column table (Workstream, Key Activities, Schedule Considerations) with grouped rows for Project and Permitting and a highlighted final row.
Section divider for regional exploration opportunities, captioned Photo: Kalkaroo - Core processing facility.
Full-bleed sunset photo inside the arched core processing shed with a translucent title box at lower left.
Profile of ASX-listed Havilah Resources (ASX: HAV), founded in 1996 and listed in March 2002. A milestone timeline runs from 1996 through Portia gold mine operations, the 2018 maiden 100Mt Ore Reserve for Kalkaroo, the 13 November 2025 agreement with Sandfire and Havilah leading regional exploration in 2026.
Left panel with About Havilah bullets and a company image, and a right panel with a vertical six-point milestone timeline.
A$30M committed to 8,847km2 of tenure near Kalkaroo; Sandfire will invest A$30M over two years with A$15M already funded to support drilling to February 2027 and Havilah managing the program. Phase 1 drilling is complete at Brooks Dam, Jacks Dam and North Manning Dam/Croziers and current drilling is at Eurinilla Dome and Homestead.
Bulleted text panel at left and a tall tenement map with prospect stars and a legend at right.
Aeromagnetics trace the prospective horizon under cover, and Homestead directly west of Kalkaroo shares similar characteristics to the deposit. Planned work includes Gradient Array IP across Lignum Dam, seismic line review and detailed infill gravity.
Text panel at left and a colourful aeromagnetic image map with legend and prospect labels at right.
Sandfire has been granted two tenements adjacent to the alliance tenure covering approximately 747km2 in the Curnamona Province. The initial two-year plan prioritises reprocessing geophysical data and completing new geophysical surveys.
Text panel at left and a tenement map at right with Sandfire tenements outlined in bold red.
Section divider for the Summary and Appendices, captioned Photo: Kalkaroo camp.
Full-bleed top-down aerial photo of the camp buildings with a translucent title box at lower left.
Repeats the five key messages from page 4: low-cost entry, an existing Resource and Reserve with growth potential, a long-life low-cost scalable operation, belt scale exploration and a tangible growth option.
Five stacked grey bars with red icon tiles under a red title, identical to the earlier key messages slide.
Mineral Resource and Ore Reserve disclosures listing the ASX announcements the Kalkaroo estimates come from, plus footnotes on the Copper Equivalent calculation (FY27 prices Cu $13,280/t, Zn $3,456/t, Pb $1,927/t, Ag $58.9/oz), Implied C1 Unit Cost and net cash/(debt), and a glossary of abbreviations.
Single page of dense small-print text with bullets, numbered footnotes and a long abbreviations paragraph.
Closing slide with Sandfire contact details: phone +61 8 6430 3800, www.sandfire.com.au, corporate office at 10 Kings Park Road, West Perth WA, and a PO Box address.
Solid red slide with Thank you at left, contact details with icons below and a large white Sandfire logo at right.
Common questions about this slide and the underlying presentation content.
It is Sandfire Resources' Kalkaroo Copper-Gold Project financial community site visit presentation, dated 25 November 2026. It covers the site visit agenda, Sandfire's strategy and copper portfolio, the Kalkaroo project facts, geology, heritage and approvals, the drilling program and PFS plan, and regional exploration.
It quotes a 100Mt Ore Reserve at 0.47% Cu and 0.44g/t Au and a 224Mt sulphide Mineral Resource at 0.49% Cu and 0.36g/t Au. It also gives an exclusive right to acquire 80%, ~130km of infill and extension drilling with six rigs, and a PFS targeted for completion in H2 FY28.
The deck was lodged with the ASX by Sandfire Resources (ASX: SFR) for its 25 November 2026 site visit. The disclaimer says related announcements are available at www.asx.com.au and on Sandfire's website under ASX announcements.
The disclaimer states all figures are in USD unless otherwise stated. Kalkaroo deal and exploration amounts such as the A$105M consideration and the A$30M alliance spend are shown in Australian dollars.
Havilah Resources (ASX: HAV) brings about 30 years of local geology knowledge and Sandfire adds funding and technical capability. A$105M upfront secured an exclusive right to acquire 80% for a further A$105M, with Havilah free-carried on 20% to FID and a strategic alliance covering 8,847km2 of tenure.
It uses a white background with Sandfire red accent bars, red bold titles and a grey footer with page numbers. Layouts include KPI tile grids, bullet panels beside maps, tables, photo-led section dividers, a milestone timeline and geological cross-sections.
The structure is a good model: agenda, key messages, company overview, project at a glance, location, geology, approvals, studies timeline, exploration and appendix. It is Sandfire-branded and marked For personal use only, so treat it as layout inspiration and replace the content and branding.
Drilling completion is expected in H1 FY28 and PFS studies and engineering in H2 FY28, with the Feasibility Study timing set by PFS outcomes. Environmental baseline surveys need a minimum of two years, and PEPR and EPBC approvals are described as the likely project critical path to FID.
Create Your Own Slides
Turn your ideas into professional presentations in seconds with 2slides AI.
Reference professional designs, choose your style, and generate slides with perfect text rendering. Powered by Nano Banana—start creating your presentation now.
Your AI Agent for slides. Save time, shine faster with intelligent presentation creation.
All services online© 2026 2slides. All rights reserved.