Sandfire Resources Kalkaroo Site Visit Presentation November 2026

36 slides

Part of Investor presentation examples · Australian investor presentation examples

This is Sandfire Resources' Kalkaroo Copper-Gold Project financial community site visit presentation, dated 25 November 2026 and lodged with the ASX (ASX: SFR). It introduces the company's strategy and copper portfolio, then covers the Kalkaroo project in South Australia: reserve and resource base, the staged entry agreement with Havilah Resources, location and infrastructure, geology, heritage and approvals, the drilling program and pre-feasibility study (PFS) plan, and regional exploration. It closes with key messages and an appendix on Mineral Resource and Ore Reserve disclosures, with an agenda for the site visit day. Figures are in USD unless otherwise stated.

6 likes
0 downloads

Uses this deck’s cover as a style reference for slides made from your own content. Or pick any page below to use its layout as the reference.

Quick Navigation

Tags

Sandfire resources
Kalkaroo
Copper-gold project
Investor presentation
Site visit presentation

Share the slides

Description

Main Topic

This is Sandfire Resources' Kalkaroo Copper-Gold Project financial community site visit presentation, dated 25 November 2026 and lodged with the ASX (ASX: SFR). It introduces the company's strategy and copper portfolio, then covers the Kalkaroo project in South Australia: reserve and resource base, the staged entry agreement with Havilah Resources, location and infrastructure, geology, heritage and approvals, the drilling program and pre-feasibility study (PFS) plan, and regional exploration. It closes with key messages and an appendix on Mineral Resource and Ore Reserve disclosures, with an agenda for the site visit day. Figures are in USD unless otherwise stated.

Key Benefits

  • •Gives a complete 36-slide view of how Sandfire frames the Kalkaroo Copper-Gold Project ahead of a site visit
  • •Quotes project headline figures such as a 100Mt Ore Reserve and a 224Mt sulphide Mineral Resource
  • •Lays out the PFS workstreams, drilling program and permitting timeline in one place
  • •Includes maps, a drill-hole plan and cross-section, and drill-core imagery for the geology story
  • •Shows a clean, consistent corporate layout with red accent bars, KPI tiles and photo section dividers

Target Audience

  • •Equity analysts and fund managers following ASX-listed copper miners
  • •Investor relations and corporate communications teams building site-visit decks
  • •Mining and exploration professionals interested in the Curnamona Province
  • •Students and researchers studying mining project presentations

Use Cases

  • •Reference for how a miner presents an early-stage copper-gold project to the financial community
  • •Template for a site-visit presentation with agenda, project overview, geology and study timeline
  • •Source of layout ideas for KPI tiles, location maps, cross-sections and timeline tables
  • •Background reading on Sandfire, Havilah Resources and the Kalkaroo strategic alliance

Unique Value Propositions

  • •Official ASX-lodged presentation from Sandfire Resources for the 25 November 2026 Kalkaroo site visit
  • •Combines corporate financial context, project facts, technical geology and permitting path in one deck
  • •Pairs numeric KPI slides with regional maps, a drilling plan and a conceptual geological cross-section

Slide Pages (36)

Detailed view of each slide page, including layout, key content and visual elements.

Page 1
title slide

Kalkaroo Copper-Gold Project Financial Community Site Visit

Content

Title slide for Sandfire's Kalkaroo Copper-Gold Project financial community site visit, dated 25 November 2026, with the tagline We mine copper sustainably to energise the future.

Layout Structure

White slide with the Sandfire logo top left, a red and black title block on the left and a large fragmented red flame graphic on the right.

Key Visual Elements

  • •Sandfire logo
  • •red flame motif
  • •title and date
  • •tagline
  • •For personal use only watermark
Page 2
disclaimer

Important information and disclaimer

Content

Two columns of legal text covering the general disclaimer, forward-looking statements and statutory versus non-statutory measures. It states that all figures are in USD unless otherwise stated and that the presentation was authorised for release by CEO and Managing Director Brendan Harris.

Layout Structure

Dense two-column text page under a red title with a grey footer bar and page number.

Key Visual Elements

  • •two-column legal text
  • •bold subheadings
  • •bulleted list of Underlying Earnings adjustments
  • •footer bar
Page 3
section divider

Acknowledgement of Country

Content

Sandfire acknowledges the Traditional Custodians of the land on which Kalkaroo is located, the Ngadjuri, Adnyamathanha and Wilyakali peoples, and pays respects to Elders past, present and future.

Layout Structure

Full-bleed aerial photo of the Kalkaroo site with a translucent text panel at upper left and the Sandfire logo at upper right.

Key Visual Elements

  • •aerial photo of Kalkaroo
  • •drill rigs and access road
  • •text overlay panel
  • •photo caption
Page 4
key messages

Kalkaroo Copper-Gold Project - Key Messages

Content

Five key messages: low-cost entry to one of Australia's largest undeveloped copper-gold projects; an existing Resource and Reserve with growth potential; potential for a long-life, low-cost, scalable operation; another belt scale exploration opportunity; and a tangible growth option offering asymmetric upside.

Layout Structure

Five stacked horizontal grey bars, each led by a red square icon tile, under a red title.

Key Visual Elements

  • •five icon tiles
  • •grey message bars
  • •red title
Page 5
agenda

Site visit agenda

Content

Agenda for Wednesday, 25 November 2026: the site visit runs 9:30am to 2:00pm with six items from welcome and safety briefing to Q&A. A Getting home panel lists departure at 2:00pm, the drive to Broken Hill, a charter flight to Adelaide and arrival at 6:00pm.

Layout Structure

Three columns: numbered agenda list on the left, a dark Getting home timetable in the middle and a photo of the core processing facility on the right.

Key Visual Elements

  • •numbered 1-6 agenda tiles
  • •time-stamped travel schedule
  • •photo of core processing facility with visitors
Page 6
section divider

Company overview

Content

Section divider introducing the company overview section, captioned Photo: Motheo processing plant.

Layout Structure

Full-bleed photo of a large mill at the Motheo processing plant with workers on a stairway and a translucent title box at lower left.

Key Visual Elements

  • •industrial mill photo
  • •two workers in hi-vis
  • •title overlay box
Page 7
strategy framework

The Sandfire Way

Content

Sets out Sandfire's purpose, We mine copper sustainably to energise the future, five values (Honesty, Respect, Collaboration, Accountability, Performance) and four strategic pillars: deliver safe, consistent and predictable performance, reduce carbon intensity, increase reserves, and demonstrate capital discipline.

Layout Structure

Framed diagram with a values column on the left, a purpose banner, four pillar tiles and an operating-model strip across the bottom.

Key Visual Elements

  • •values column with icons
  • •four pillar tiles
  • •purpose banner
  • •operating model strip
Page 8
map

A low cost and globally significant copper portfolio

Content

World map of Sandfire's assets. For FY26 MATSA shows 4.5Mt ore processed, 94.5kt CuEq, implied C1 unit costs of US$0.88/lb and a 55% operating margin; Motheo shows 6.1Mt, 59.7kt, US$1.09/lb and 62%. A bar chart shows CuEq production growing +68% since FY23 to 155kt, and Kalkaroo is shown with a planned ~130km drilling program and PFS underway.

Layout Structure

Grey world map with callout boxes for each asset, a legend at lower left, a revenue donut and a CuEq bar chart at right, and footnotes at the bottom.

Key Visual Elements

  • •world map with asset callouts
  • •FY26 revenue by commodity donut
  • •CuEq production bar chart FY23-FY26
  • •legend of asset status
  • •footnotes
Page 9
KPI dashboard

A strong balance sheet with ~US$1B of available liquidity

Content

US$342M net cash and US$650M undrawn CRF at September 2026. Q1 FY27 revenue was US$480M and Underlying EBITDA US$272M, with net cash after a US$117M (A$164M) dividend and US$53M of tax payments; the chart notes +US$687M added to the balance sheet over two years.

Layout Structure

Grey text panel at left with three headed sections and a framed net cash/(debt) bar chart from Sep-24 to Sep-26 at right.

Key Visual Elements

  • •net cash/(debt) bar chart
  • •342 highlighted bar
  • •Q1 FY27 net cash movement callout
  • •red highlight figures
Page 10
table

Group FY27 guidance remains unchanged

Content

Table of FY27 guidance by MATSA, Motheo, Corporate and Group with FY26 actuals in brackets. Group guidance includes copper 99-111kt, copper equivalent 150-166kt (FY26 155.2kt), underlying operating cost US$688M and total capital expenditure US$299M, including US$51M of Kalkaroo PFS costs.

Layout Structure

Full-width red-headed table with shaded section rows for Production, Operating Costs and Capital Expenditure, and small-print notes underneath.

Key Visual Elements

  • •guidance table
  • •shaded section rows
  • •bold totals
  • •price assumption footnotes
Page 11
section divider

Kalkaroo Copper-Gold Project at a glance

Content

Section divider for the Kalkaroo Copper-Gold Project at a glance section, captioned Photo: Curnamona Province, South Australia.

Layout Structure

Full-bleed dusk aerial photo of an access road, camp and a floodlit drill rig with a translucent title box at lower left.

Key Visual Elements

  • •aerial landscape photo
  • •lit drill rig
  • •title overlay box
Page 12
KPI dashboard

Kalkaroo Copper-Gold Project at a glance

Content

Tile dashboard for the project: 100Mt Ore Reserve at 0.47% Cu and 0.44g/t Au, 224Mt sulphide Mineral Resource at 0.49% Cu and 0.36g/t Au, an exclusive right to acquire 80%, and ~US$70M PFS targeted for completion in H2 FY28. Other tiles cover ~130km of drilling with six rigs, an 80-person camp, 8,847km2 of regional tenure and an A$30M minimum spend.

Layout Structure

Left panel on the Havilah partnership with a drill rig photo and a grid of KPI tiles with large red numbers on the right.

Key Visual Elements

  • •large red KPI numbers
  • •partnership panel
  • •drill rig photo
  • •tile grid by theme
Page 13
investment thesis

Investment thesis

Content

Four themes: low-cost staged entry (A$105M upfront secured the exclusive right to acquire 80% for a further A$105M, with Havilah free-carried on 20% to FID), expansion upside from an open orebody (224Mt resource, 10-20Mt annual throughput alternatives), a preferred jurisdiction near infrastructure, and replicating the Kalahari Copper Belt playbook.

Layout Structure

Four stacked grey rows with red icon tiles on the left and a tall drilling photo on the right.

Key Visual Elements

  • •four icon rows
  • •bulleted proof points
  • •drilling photo
  • •footnotes
Page 14
section divider

The Kalkaroo Copper-Gold Project

Content

Section divider for The Kalkaroo Copper-Gold Project, captioned Photo: Infill and extension drilling at Kalkaroo.

Layout Structure

Full-bleed sunrise photo of a drill rig and support trucks with a translucent title box at lower left.

Key Visual Elements

  • •sunrise drilling photo
  • •title overlay box
Page 15
map

Regional location and logistics

Content

Kalkaroo is in north-eastern South Australia, ~500km north-east of Adelaide and ~90km west-north-west of Broken Hill. Barrier Highway, a railway line, Broken Hill Airport and links to Port Pirie, Whyalla and Port Adelaide are listed as regional infrastructure.

Layout Structure

Bulleted text panel on the left and a regional map with an Australia inset, legend and 200 km scale bar on the right.

Key Visual Elements

  • •regional map
  • •Australia inset
  • •highway, rail and HV powerline legend
  • •Strategic Alliance Agreement tenements outline
Page 16
geological map

Curnamona Province geology

Content

Describes the Proterozoic Curnamona Province and the Kalkaroo deposit: a 224Mt sulphide Mineral Resource at 0.49% Cu and 0.36g/t Au extending over 2.5km of strike, with Tertiary supergene enrichment and the orebody open in multiple directions. A coloured geology map with prospects such as Homestead, Brooks Dam and Eurinilla Dome accompanies the text.

Layout Structure

Left text panel with two headed sections and a large coloured geological map with legend and 40 km scale bar at right.

Key Visual Elements

  • •geology map with coordinates
  • •exploration prospect stars
  • •geology legend
  • •inset location map
Page 17
map

Site overview

Content

Site access, power, water and facilities: ~50km by existing road to the Barrier Highway, a proposed rail siding ~75km from site, and a ~100km 220kV transmission line required to connect into the Broken Hill substation (notional alignment only). Groundwater is being assessed in the PFS and the neighbouring Honeymoon mine is noted.

Layout Structure

Text panel with three headed sections at left and a zoomed site map showing roads, powerlines, Honeymoon and Cockburn at right.

Key Visual Elements

  • •site map with access roads
  • •HV powerline dashed lines
  • •Honeymoon mine marker
  • •legend and 20 km scale bar
Page 18
ESG and community

Protecting cultural heritage at Kalkaroo

Content

Kalkaroo sits on the traditional lands of the Ngadjuri, Adnyamathanha and Wilyakali peoples. A Native Title Mining Agreement with NAWNTAC is in place, and heritage monitors have been on site with monitoring in April, May/June, June/July, September, October and November.

Layout Structure

Three traditional-owner cards on top, two bulleted panels below and a tall photo of the heritage survey team at right.

Key Visual Elements

  • •three owner group cards
  • •two bullet panels
  • •heritage survey photo
Page 19
approvals and environment

A clear pathway to environmental approvals

Content

Covers the approvals pathway (State and Federal approvals under the EPBC Act, with a bilateral agreement), protected species (Plains Wanderer, Purple-wood Wattle) and surface water management for an ephemeral creek, with low annual rainfall of ~200mm. A Next steps box lists baseline studies and commencing environmental impact assessment.

Layout Structure

Three photo-topped columns with bullet text plus a separate Next steps panel at the right.

Key Visual Elements

  • •flower photo
  • •plant photo
  • •aerial creek photo
  • •next steps panel
Page 20
section divider

Progressing drilling and technical studies

Content

Section divider for progressing drilling and technical studies, captioned Photo: Kalkaroo - Core processing facility.

Layout Structure

Full-bleed interior photo of the arched core processing shed with workers and roller tables and a translucent title box at lower left.

Key Visual Elements

  • •core shed interior photo
  • •workers at core tables
  • •title overlay box
Page 21
organisation and workplan

How we will deliver the Kalkaroo PFS

Content

Names Jason Grace (Chief Operating Officer) and Ian Kerr (President Projects and Studies, Study Manager) and shows eight key PFS project areas from geology to logistics and port. A footer notes six drill rigs operating (four diamond, two RC), ~130km drilling, an 80-person camp and PFS completion targeted in H2 FY28.

Layout Structure

Org-chart style block at left with two portrait tiles, projects team and consultants boxes, and a 4x2 grid of project-area cards at right with a summary strip below.

Key Visual Elements

  • •two executive portrait tiles
  • •projects team box
  • •eight project area cards
  • •gearing up summary strip
Page 22
infrastructure overview

The core characteristics of a lower capital intensity project

Content

Under the subtitle Replicating the success of Motheo, four photo cards cover a flat topographical setting, direct highway access (~50km to the Barrier Highway), existing rail and port links (siding ~75km away) and proximity to the grid (~100km, 220kV line). A summary bar says less new build supports lower capital intensity, subject to approvals.

Layout Structure

Four equal photo-topped cards with bullets above a full-width summary bar and footnote.

Key Visual Elements

  • •four photo cards
  • •highway, train and pylon photos
  • •summary bar
Page 23
program overview

Current drilling program

Content

~130km infill and extension drilling program commenced in FY26 with six rigs (four diamond, two RC). It drilled 8.7km in Q1 FY27 plus 6.5km in October, US$51M is expected to be capitalised in FY27, and the new PFS is expected to complete in H2 FY28.

Layout Structure

Grey bullet panel at left and a large photo of a drill rig on the right.

Key Visual Elements

  • •drill rig photo
  • •nested bullet list
  • •drilling objectives
Page 24
geological cross-section

Drilling and studies underway

Content

A plan map of the drilling program beside a cross-section A to A' showing drill-hole traces (for example 26KKRCD0024 and 26KKRCD0011) over mineralisation styles. The note says interpreted zones are based on previously reported historical information and no new assay results are presented; assays are pending.

Layout Structure

Two framed panels side by side: a plan view with legend at left and a larger cross-section with legend and scale bar at right.

Key Visual Elements

  • •drill collar plan map
  • •cross-section with Assays Pending labels
  • •mineralisation style legend
  • •scale bars
Page 25
geological cross-section

Updated geology to underpin the PFS

Content

Describes an updated 3D lithostratigraphic and structural model and four principal Mineral Resource modelling domains: stockwork-breccia, vein, stratiform and supergene gold. A conceptual cross section looking NNE is paired with core photos.

Layout Structure

Text panel at left and a framed conceptual cross-section surrounded by three drill core photos at right.

Key Visual Elements

  • •conceptual cross-section
  • •drill core photos
  • •legend
  • •illustrative-only note
Page 26
geological cross-section

Regolith and geomet models to underpin the PFS

Content

Maps the weathering profile across three interpreted domains: oxyhydroxide-native copper, chalcocite-goethite and chalcopyrite-pyrite, illustrated with drill core photographs. A bar notes it is a key input into most facets of the mining value chain.

Layout Structure

Wide cross-section with legend on the left, three stacked core photos in the middle, a text panel at right and a summary bar below.

Key Visual Elements

  • •regolith cross-section with domain bands
  • •three core photos
  • •why it matters bar
Page 27
timeline table

Study summary

Content

Workstream table headed PEPR and EPBC approvals are the critical path to FID. Drilling completion is expected in H1 FY28, studies and engineering are scheduled for H2 FY28, baseline surveys need a minimum of two years, and PEPR and EPBC approvals are marked the likely project critical path.

Layout Structure

Three-column table (Workstream, Key Activities, Schedule Considerations) with grouped rows for Project and Permitting and a highlighted final row.

Key Visual Elements

  • •red header row
  • •grouped sections
  • •highlighted critical path row
Page 28
section divider

Regional exploration opportunities

Content

Section divider for regional exploration opportunities, captioned Photo: Kalkaroo - Core processing facility.

Layout Structure

Full-bleed sunset photo inside the arched core processing shed with a translucent title box at lower left.

Key Visual Elements

  • •shed interior at sunset
  • •skid steer loader
  • •title overlay box
Page 29
timeline

Havilah: a proud history in the Curnamona Province

Content

Profile of ASX-listed Havilah Resources (ASX: HAV), founded in 1996 and listed in March 2002. A milestone timeline runs from 1996 through Portia gold mine operations, the 2018 maiden 100Mt Ore Reserve for Kalkaroo, the 13 November 2025 agreement with Sandfire and Havilah leading regional exploration in 2026.

Layout Structure

Left panel with About Havilah bullets and a company image, and a right panel with a vertical six-point milestone timeline.

Key Visual Elements

  • •vertical timeline with red dots
  • •Havilah Resources logo image
  • •year labels
Page 30
map

A large and highly prospective package

Content

A$30M committed to 8,847km2 of tenure near Kalkaroo; Sandfire will invest A$30M over two years with A$15M already funded to support drilling to February 2027 and Havilah managing the program. Phase 1 drilling is complete at Brooks Dam, Jacks Dam and North Manning Dam/Croziers and current drilling is at Eurinilla Dome and Homestead.

Layout Structure

Bulleted text panel at left and a tall tenement map with prospect stars and a legend at right.

Key Visual Elements

  • •alliance tenement outlines
  • •prospect stars with labels
  • •legend
  • •40 km scale bar
Page 31
geophysical map

Geophysics guiding regional targeting

Content

Aeromagnetics trace the prospective horizon under cover, and Homestead directly west of Kalkaroo shares similar characteristics to the deposit. Planned work includes Gradient Array IP across Lignum Dam, seismic line review and detailed infill gravity.

Layout Structure

Text panel at left and a colourful aeromagnetic image map with legend and prospect labels at right.

Key Visual Elements

  • •aeromagnetic colour image
  • •magnetic response legend
  • •prospect stars
  • •10 km scale bar
Page 32
map

Sandfire's ambitions beyond the alliance

Content

Sandfire has been granted two tenements adjacent to the alliance tenure covering approximately 747km2 in the Curnamona Province. The initial two-year plan prioritises reprocessing geophysical data and completing new geophysical surveys.

Layout Structure

Text panel at left and a tenement map at right with Sandfire tenements outlined in bold red.

Key Visual Elements

  • •two highlighted Sandfire tenements
  • •alliance tenement outlines
  • •legend
  • •scale bar
Page 33
section divider

Summary and Appendices

Content

Section divider for the Summary and Appendices, captioned Photo: Kalkaroo camp.

Layout Structure

Full-bleed top-down aerial photo of the camp buildings with a translucent title box at lower left.

Key Visual Elements

  • •aerial camp photo
  • •title overlay box
Page 34
key messages

Kalkaroo Copper-Gold Project - Key Messages

Content

Repeats the five key messages from page 4: low-cost entry, an existing Resource and Reserve with growth potential, a long-life low-cost scalable operation, belt scale exploration and a tangible growth option.

Layout Structure

Five stacked grey bars with red icon tiles under a red title, identical to the earlier key messages slide.

Key Visual Elements

  • •five icon tiles
  • •grey message bars
Page 35
appendix

Appendix I

Content

Mineral Resource and Ore Reserve disclosures listing the ASX announcements the Kalkaroo estimates come from, plus footnotes on the Copper Equivalent calculation (FY27 prices Cu $13,280/t, Zn $3,456/t, Pb $1,927/t, Ag $58.9/oz), Implied C1 Unit Cost and net cash/(debt), and a glossary of abbreviations.

Layout Structure

Single page of dense small-print text with bullets, numbered footnotes and a long abbreviations paragraph.

Key Visual Elements

  • •bulleted announcement list
  • •numbered footnotes
  • •abbreviations paragraph
Page 36
closing slide

Thank you

Content

Closing slide with Sandfire contact details: phone +61 8 6430 3800, www.sandfire.com.au, corporate office at 10 Kings Park Road, West Perth WA, and a PO Box address.

Layout Structure

Solid red slide with Thank you at left, contact details with icons below and a large white Sandfire logo at right.

Key Visual Elements

  • •solid red background
  • •white Sandfire logo
  • •contact icons

Frequently Asked Questions

Common questions about this slide and the underlying presentation content.

What is this presentation about?

It is Sandfire Resources' Kalkaroo Copper-Gold Project financial community site visit presentation, dated 25 November 2026. It covers the site visit agenda, Sandfire's strategy and copper portfolio, the Kalkaroo project facts, geology, heritage and approvals, the drilling program and PFS plan, and regional exploration.

What key project figures does the deck quote for Kalkaroo?

It quotes a 100Mt Ore Reserve at 0.47% Cu and 0.44g/t Au and a 224Mt sulphide Mineral Resource at 0.49% Cu and 0.36g/t Au. It also gives an exclusive right to acquire 80%, ~130km of infill and extension drilling with six rigs, and a PFS targeted for completion in H2 FY28.

Where was the original presentation lodged?

The deck was lodged with the ASX by Sandfire Resources (ASX: SFR) for its 25 November 2026 site visit. The disclaimer says related announcements are available at www.asx.com.au and on Sandfire's website under ASX announcements.

What currency are the numbers in?

The disclaimer states all figures are in USD unless otherwise stated. Kalkaroo deal and exploration amounts such as the A$105M consideration and the A$30M alliance spend are shown in Australian dollars.

What does the deck say about the Havilah partnership?

Havilah Resources (ASX: HAV) brings about 30 years of local geology knowledge and Sandfire adds funding and technical capability. A$105M upfront secured an exclusive right to acquire 80% for a further A$105M, with Havilah free-carried on 20% to FID and a strategic alliance covering 8,847km2 of tenure.

What is the design and layout of the deck?

It uses a white background with Sandfire red accent bars, red bold titles and a grey footer with page numbers. Layouts include KPI tile grids, bullet panels beside maps, tables, photo-led section dividers, a milestone timeline and geological cross-sections.

Can I reuse it as a template for a mining project or site-visit deck?

The structure is a good model: agenda, key messages, company overview, project at a glance, location, geology, approvals, studies timeline, exploration and appendix. It is Sandfire-branded and marked For personal use only, so treat it as layout inspiration and replace the content and branding.

What is the project timeline in the deck?

Drilling completion is expected in H1 FY28 and PFS studies and engineering in H2 FY28, with the Feasibility Study timing set by PFS outcomes. Environmental baseline surveys need a minimum of two years, and PEPR and EPBC approvals are described as the likely project critical path to FID.

2slides

Create Your Own Slides

Turn your ideas into professional presentations in seconds with 2slides AI.

Create World-Class Slides in Seconds

Reference professional designs, choose your style, and generate slides with perfect text rendering. Powered by Nano Banana—start creating your presentation now.

2Slides logo

Your AI Agent for slides. Save time, shine faster with intelligent presentation creation.

Summarize with AI

ChatGPTClaudeGrokPerplexity
All services online

Products

Features

Gallery

Templates

Integrations

Resources

Comparison

© 2026 2slides. All rights reserved.