This is the Petrobras Business Plan 2027-2031 presentation, the five-year strategic and investment plan of Petróleo Brasileiro S.A. (NYSE: PBR), filed with the SEC as an exhibit to Form 6-K on 24 November 2026. The 184-slide deck sets out total capital expenditure of US$ 122 billion for 2027-2031 (Exploration and Production US$ 87 billion, Refining, Transportation and Marketing US$ 24 billion, Gas and Low Carbon US$ 8 billion, Corporate US$ 3 billion), of which US$ 113 billion is under implementation and US$ 9 billion under evaluation. It covers the market outlook, financial strategy and dividends, E&P and main assets, refining, gas and power, low carbon, climate and decarbonization, engineering and technology, plus supplemental ESG and corporate material. Amounts are in US dollars unless a slide states Brazilian reais (R$).
Uses this deck’s cover as a style reference for slides made from your own content. Or pick any page below to use its layout as the reference.
Quick Navigation
Tags
Share the slides
This is the Petrobras Business Plan 2027-2031 presentation, the five-year strategic and investment plan of Petróleo Brasileiro S.A. (NYSE: PBR), filed with the SEC as an exhibit to Form 6-K on 24 November 2026. The 184-slide deck sets out total capital expenditure of US$ 122 billion for 2027-2031 (Exploration and Production US$ 87 billion, Refining, Transportation and Marketing US$ 24 billion, Gas and Low Carbon US$ 8 billion, Corporate US$ 3 billion), of which US$ 113 billion is under implementation and US$ 9 billion under evaluation. It covers the market outlook, financial strategy and dividends, E&P and main assets, refining, gas and power, low carbon, climate and decarbonization, engineering and technology, plus supplemental ESG and corporate material. Amounts are in US dollars unless a slide states Brazilian reais (R$).
Detailed view of each slide page, including layout, key content and visual elements.
Cover slide of the Petrobras Business Plan 2027-2031, shown over a stylised green industrial illustration with two Petrobras workers in orange overalls reviewing a clipboard.
Full-bleed green background with large white title and yellow period tag on the left, photo of two workers on the right and the Petrobras logo top right.
Legal notice stating the materials are not investment advice, that non-IFRS measures are used, and that forward-looking statements carry risks and uncertainties. The cautionary statement says oil and gas resources and reserves data are not prepared under SEC Subpart 1200 guidelines and do not qualify as proved, probable or possible reserves under Rule 4-10(a) of Regulation S-X.
Dense left text column of legal paragraphs beside a right-hand green heading and highlighted cautionary statement, with a green swoosh at the left edge.
The presentation is organised in nine parts: Introduction, Market Outlook, Financial Strategy, Exploration and Production, Refining, Transportation and Marketing, Gas and Low Carbon Energies, Climate Change and Decarbonization, Engineering, Technology and Innovation, plus Supplemental Information (ESG and Corporate).
Photo of an FPSO and helicopter at sea on the left with a white angled panel on the right holding a numbered agenda list.
Section divider for the Introduction part, featuring a smiling Petrobras employee (credited as Wagner Felicio) in a blue suit.
Full-bleed portrait photo on dark blue background with the section title in large yellow italic type on a lighter blue diagonal panel.
Petrobras says it is charting a just energy transition, advancing gradually and responsibly while keeping its relevance in Brazil's energy mix and expanding renewables. Vision: best diversified and integrated energy company in value generation; values: care for people, integrity, sustainability, innovation, commitment to Petrobras and Brazil; purpose: provide energy that ensures prosperity in an ethical, fair, safe and competitive manner.
Concentric circles (Vision, Values, Purpose) on the left connected by lines to three grey text bars on the right.
Reaffirms five key choices: focus on oil and gas with economic and environmental resilience; replenishment of reserves and value creation; expansion of industrial facilities with more low carbon products; ambition of operational net zero emissions; and leadership in the just energy transition.
Left half is a large worker portrait; right half is a list of five icon-led statements on a light grey panel.
Brazil's energy supply is 14 exajoules in 2022, 16 in 2031 and 21 in 2050. Petrobras oil and gas share is 31% (4.3 EJ) in 2022, 27% (4.3 EJ) in 2031 and 22% (4.6 EJ) in 2050, with low carbon at 4% (0.7 EJ) in 2031 and 9% (1.9 EJ) in 2050; exports are 1.7 EJ, 2.6 EJ and 1.4 EJ respectively.
Three donut charts of growing size (2022, 2031, 2050) in a row, with exports icons above each and notes and source at the bottom.
Investments have the potential to generate and sustain 325 thousand direct and indirect jobs and represent 5% of total investments in Brazil in the period. Activities will generate tax payments to federal, state and municipal governments of around R$ 1.6 trillion.
Three icon-and-text statements on the left white area, with a large smiling-woman photo cropped in an angled shape on the right.
Section divider for the Market Outlook part, with two Petrobras employees (credited as Lucas Su and Patricia Silva) talking.
Light blue photo background with two standing figures and a dark blue diagonal panel carrying the yellow title.
Long-term oil demand reaches about 100 MMbpd, and by 2050 the 2026 projection is 70 MMbpd versus 64 in the 2024 projection, within a forecaster range of 33 to 114. Exploration spending was US$ 29 billion at its peak (2012-2014), 12 pre-pandemic, 8.7 in 2020-2023, 9.4 in 2024, 9.1 in 2025, 9.3 in 2026 and is projected at 9.9 in 2027-2030.
Left line chart of oil demand projections 2010-2050 with shaded forecaster range; right bar chart of exploration spending by period; small-print footnotes beneath.
CO2e emissions scenarios for 2050 from seven forecasters and Petrobras show wide dispersion across slow, moderate and accelerated transition. The current projection is 24 GtCO2 eq/year versus 16 in the 2024 projection; global emissions were 37 in 2022 and 38 GtCO2 eq/year in 2024.
Dot-plot chart with one column per forecaster (Petrobras highlighted in a green frame), dashed average lines, a right-hand box with 2050 values and a legend below.
Global energy investment (US$ billion, real terms, base year 2024) rose from 2,702 in 2015 to an estimated 3,302 in 2025, of which 2,154 is low carbon (65%) and 1,148 fossil (35%), compared with 45% and 55% in 2015. Investment in renewables has stayed above traditional sources since 2016.
Single stacked bar chart for 2015-2025 with green low-carbon and grey fossil segments, percentage labels on the left and right and a source note below.
Brazil's primary energy mix is 51% renewables in 2024 rising to 65% in 2050, versus 16% and 40% for the world. Oil products demand in Brazil: heavy-duty transport 1.7 EJ (2025), 2.3 (2040), 2.7 (2050); light-duty 2.3, 2.5 and 2.1 EJ, with biofuels rising to 43% of light-duty in 2050.
Two-panel layout: left stacked bars of energy mix for Brazil and the world (2024, 2050); right stacked bars of oil products demand profile for heavy-duty and light-duty transport; legends and sources at the bottom.
Brazil accounts for 2.2% of the world's primary energy supply but only 0.7% of global emissions from this sector. Energy is 68% of world greenhouse gas emissions versus 25% in Brazil, where agriculture and livestock is 38%, land use 25% and industrial process and waste 12%.
Headline text on the left and two side-by-side pie charts (world and Brazil) on the right, separated by a thin line.
Greenhouse gas emissions per barrel produced in 2025 (kg CO2e per barrel): Brazil 20 and the United States 20, versus Russia 37, Canada 39, India 57 and China 63; Guyana is 5 and Saudi Arabia 9. The weighted average is 32.
Ascending bar chart of many producing countries (CO2 in yellow, methane in teal) with flag call-outs for selected countries and a weighted-average badge on the right.
The Hormuz crisis caused an unprecedented shock to energy systems, with around 200 assets affected by the conflict. The chart of oil supply disruptions in history shows the 2026 closure of Hormuz at about 2.8 (billion barrels), well above earlier events such as the Iranian Revolution.
Left half is a Middle East map with red and yellow incident markers in an orange-framed box; right half is a green panel with a horizontal bar chart of historical disruptions.
Brent actuals were US$ 81/bbl in 2024, 69 in 2025 and 94 in 2026; the BP 2027-31 path is 74 in 2027 and 70 from 2028 to 2031. Petrobras maintains a long-term price view of US$ 70/bbl with a robust scenario at US$ 50/bbl and says it will execute investments without relaxing capital discipline.
Left white column with three icon-led bullets; right green panel with a Brent line chart comparing actual, BP 2027-31 and BP 2026-30.
Section divider for the Financial Strategy part, featuring an employee credited as Jaqueline Teixeira in a green blouse.
Green photo background with the employee on the left and a lime-green diagonal panel carrying the white title.
Compared with BP 2026-30: plus US$ 30 billion in operating cash flow and plus US$ 10 billion in dividends, with the dividend formula maintained at 45% x FCF. Debt: gross debt limit below US$ 75 billion, target US$ 65 billion, minimum cash US$ 6 billion and US$ 20-25 billion in cash to be allocated.
Three columns (Investments, Dividends, Debt) each with a key-figure card above a green chevron band and a slogan at the bottom.
Sources of US$ 230-250 billion in operating cash flow plus net borrowings of 0-5 and earn-outs of 0-5, against uses of 100-110 in cash flow from investments, 55-60 ordinary dividends, 20-25 to be allocated, 50-55 leasings and 5-10 financial expenses. Assumed Brent is US$ 74 in 2027 and 70 thereafter; operating cash flow is 44, 45, 47, 47 and 47 across 2027-2031, and a US$ 10 Brent change moves OCF by about US$ 6 billion per year.
Left stacked sources-and-uses bars; right three tables (assumptions, projections, sensitivities) with year columns 2027-2031.
Capex execution versus guidance was 81% in 2022, 79% in 2023, 90% in 2024, 110% in 2025 and 124% in 2026E, with 100% expected for 2027-31. Oil production is projected at 2.9 MMbpd every year from 2027 to 2031, with plus 430 MM barrels of oil between plans over 2027-2030.
Three numbered panels left to right: capex execution bars, an illustrative risk-model line chart, and an oil production line chart comparing BP plans.
Total portfolio of US$ 122 billion: E&P 87, RTM 24, Gas and Low Carbon 8, Corporate 3, with more than 70% concentrated in E&P. Under implementation is US$ 113 billion (83, 23, 4, 3) and under evaluation US$ 9 billion (3, 1, 4 for E&P, RTM and Gas and Low Carbon).
Left bar cluster for total by segment with a green badge; right two bar clusters for under implementation and under evaluation with badges.
Annual totals for 2027-2031 are US$ 29.5, 28.3, 23.8, 22.3 and 17.8 billion (total US$ 122 billion), split into capital, current and inorganic investments. Cash capex is 24, 24, 20, 18 and 15 and organic cash capex 23, 23, 19, 17 and 14.
Stacked bar chart by year with totals in green ovals, two horizontal rows of cash capex and organic cash capex beneath, and footnotes below.
Of the US$ 122 billion, 81% (US$ 99 billion) is base, 12% (US$ 14 billion) is target and 7% (US$ 9 billion) is under evaluation as opportunities. Main migrations from evaluation to implementation versus BP 2026-30 include Buzios 12, REVIT Barracuda and Caratinga, Mero Extension, Sirius, REPAR medium oil products HDT and MR2 vessels.
Left pyramid of three tiers with descriptions to the right, plus a right-hand list of main migrations; footnote on NPV approval criteria.
Total investment bridge from BP 2026-30 at US$ 109 billion to BP 2027-31 at US$ 122 billion: period adjustment 0.4, inflation 4, FX 3 to a normalized 117, then current investments 4, schedule and portfolio adjustments -12, new projects 4 and improved project execution 9.
Waterfall chart from left start bar to right end bar with step labels beneath and footnotes below.
Implementation investment bridge from US$ 91 billion in BP 2026-30 to US$ 113 billion in BP 2027-31, with steps including period adjustment -5, inflation 4, FX 2, current investments 4, schedule -2, new projects 3, projects migrated to implementation 13 and improved project execution 4.
Waterfall chart with blue end bars and teal/yellow steps, labelled categories below and footnotes at the bottom.
Implementation investment of US$ 113 billion is US$ 29.3, 27.4, 21.8, 19.6 and 15.1 billion across 2027-2031, with E&P at 21.2, 18.6, 16.4, 15.5 and 11.4 and more than 70% of the total. Cash capex is 24.2, 23.1, 18.0, 15.7 and 12.2, with sanctioned share of 88%, 79%, 64%, 51% and 46%.
Annual bar chart on top with a table of segment values beneath and two coloured rows for cash capex and sanctioned percentage.
Cash capex is US$ 24.2 billion in 2027 and US$ 23.1 billion in 2028. E&P covers FPSOs, wells and tie-ins (Buzios 8 to 12, Atapu 2, Sepia 2, Revit Albacora); RTM covers expansion and HEFA, with Boaventura, RNEST Train 2 and UFN-III start-up expected in 2029 and RPBC HEFA in 2030; for E&P plus 1 p.p. of efficiency is about plus 30 kbpd.
Left stacked teal and lime boxes with annual cash capex; right three grey rounded boxes (E&P, RTM, current investments).
2027 implementation capex bridge from US$ 21.0 billion in BP 2026-30 to US$ 29.3 billion in BP 2027-31: inflation 1.0, FX 0.8, current investments 0.2, schedule -0.5, new projects 2.5, projects migrated 0.1 and improved project execution 4.2.
Waterfall chart with blue end bars and teal/yellow steps and category labels beneath.
2028 implementation capex bridge from US$ 20.5 billion in BP 2026-30 to US$ 27.4 billion in BP 2027-31: inflation 1.1, FX 0.6, current investments 1.7, schedule -0.5, new projects 0.7, projects migrated 1.3 and improved project execution 2.0.
Waterfall chart with blue end bars, teal and yellow steps and category labels beneath.
Average nominal internal rate of return in US$ is 20% for Exploration and Production, 16% for Refining, Transportation and Marketing and above 12% for Gas and Low Carbon Energies. Rates are now disclosed in nominal terms with inflation of about 2% p.y.; for E&P only projects with first oil from 2027 onwards are considered.
Three equal icon cards across the slide, each with a blue header and a large percentage figure, with a note at the bottom.
Gross debt is US$ 70 billion in 2025 and 2026E, 69 in 2027, 68 in 2028 and 65 in 2029-2031, below the US$ 75 billion limit and converging to US$ 65 billion in 2029; net debt falls from 61 in 2025 to 29 in 2031. Brent breakeven is US$ 80/bbl in 2027 and a US$ 53/bbl average in 2028-31.
Stacked bars of leasings and financial debt with a net debt line overlay, a limit box on top, and two rows of leases-linked-to-FPSO percentages and Brent breakeven beneath.
Summary flow of the financial strategy: investments lead to operating cash generation, which leads to benefits for society as a whole. No numbers are shown on this slide.
Left three stacked rounded bars connected by chevrons, with a large aerial FPSO photo on the right.
Section divider for the Exploration and Production part, featuring two employees credited as Giselly Carvalho and Roberto Rufino in orange overalls.
Orange background with two workers on the left and a yellow diagonal panel carrying the white title.
Six pillars for E&P: fostering capital discipline and cost optimization; maximizing value with focus on profitable assets; delivering production safely with maximum asset longevity; replenishing reserves and exploring new frontiers in Brazil and abroad; contributing to increasing natural gas supply; and decarbonizing the portfolio.
Central E&P ring with six icon circles and rounded text boxes arranged symmetrically left and right.
Oil production (Petrobras work interest, variation of plus or minus 4%) rises about 26% between 2024 and 2026 and is projected at 2.9 million bpd each year from 2027 to 2031, versus 2.5 to 2.7 in BP 2026-30, an addition of 430 million barrels of oil between plans over 2027-2030. Actuals were 2.2 (2021), 2.1, 2.2, 2.2 and 2.4 (2025), with a 2026 outlook between 2.7 and 2.8.
Single large line chart on a rounded grey panel with call-out boxes for the 26% increase and the 430 million barrels, and a legend at the bottom.
Reservoir management lowers the potential decline from about -10% p.y. to -3% p.y.; production efficiency index rises plus 4.7 p.p. from 1H24 to 1H26, a gain of plus 130 kbpd, with maintenance OPEX plus 33% and current CAPEX plus 77% (2024 vs Outlook 2026). Platform capacity: authorization to temporarily expand nameplate capacity by up to plus 282 kbpd, 11 FPSOs adapted, and 6 more planned units with an ambition of up to 260 kbpd.
Three vertical rounded panels (reservoir management, production efficiency and integrity focus, platform capacity) with charts and big-number call-outs; small-print footnotes at the bottom.
EF100 is Petrobras' strategic E&P efficiency program integrating people, processes and technology, with 13 initiatives split into maintenance and reliability and operation. In 2025 the Production Efficiency Index increased 1.3 p.p., and Ativo360 and Subsea Integrity solutions were recognized at the ANP Technological Innovation Award.
Left column with program logo and stacked blue boxes; right column with highlighted 2025 result and award photos, all on a blue palette.
BP 2027-31 oil production guidance of 2.9 MMbpd is shown with a risk tunnel and upside arrows. Opportunities not included in the guidance are reduced pre-salt uncertainties (BSW and GOR), capacity increase on not-yet-producing platforms, especially 3 new Buzios units in 2027 each with 225 kbpd design capacity, and anticipation of platform and well start-ups.
Left area chart with a 2.9 MMbpd line and upward arrows; right rounded panel listing three opportunity bullets; abbreviation footnotes at the bottom.
Total oil and gas production is 3.5 million boed in 2027 and 3.7 in 2028-2031, oil and commercial gas 3.1 then 3.2, oil 2.9 each year, and operated production 5.1 then 5.2. The five-year average pre-salt share is 89% and the government share in operated production is 9%.
Stacked bars by year with line overlays for totals and operated production above, and two chevron KPI bars for pre-salt and government share below.
Production curve consistently above plan with a strengthened trajectory sustained for longer, resulting in plus 25% in total production volume by 2050 versus BP 2025-29. Total production (MM boed) shows 2025 actual of 3.0 and 2026 guidance of 3.3 to 3.4, with levers of reservoir management, new opportunities (complementary wells and Sepia 3) and advanced technologies.
Large area chart of declining production to 2050 with call-outs at the top, a highlighted plus 25% box at the right and a legend strip at the bottom.
Over the next 5 years US$ 3 billion will be invested to acquire 24k km2 of 4D seismic, with average net potential value of 250% versus the 4D seismic investment. The approach is see, decide, capture value, with data processed on in-house supercomputers (HPC).
Illustrated subsea scene with three icon steps on the left and a block of big numbers on the right, ending with a yellow key message line.
Total E&P portfolio is US$ 86.5 billion: implementation 83.1 and evaluation 3.4 in the inner ring; pre-salt 51.3, post-salt 20.5, exploration 10.0 and others 4.7 in the outer ring.
Centered double donut chart with total in the middle, a legend box beneath and decorative green panel on the right.
E&P capex under implementation moves from US$ 69.2 billion (BP 2026-30) to US$ 83.1 billion (BP 2027-31): inflation 2.7, FX 1.5, period adjustment -4.1, acquisition of new areas and exploratory wells 2.8, projects migrated to implementation 10.3, improved project execution 4.9 and project postponements -4.1. BP 2027-31 split shows pre-salt 50, post-salt 19, exploration 10 and others 5.
Waterfall chart with stacked start and end bars (by area) and floating step bars, category labels and a legend below.
Investments are approved only with positive NPV in 3 scenarios; the optimistic scenario delivers approximately 2x the value of the robust scenario. Brent breakeven of major E&P projects is US$ 39/bbl and average IRR of major E&P projects is 20%.
Left three-bar NPV chart (robust, base, optimistic) with a 2x value tag; right two stacked blue KPI cards.
Complementary projects expand, sustain or recover production from systems already in operation: about 100 offshore wells in BP 2027-31, about US$ 14 billion in capex, about 10% of average total production in 2027-2031 and about 28% average nominal IRR.
Left blue panel with scope description and bullets; right grey panel with four icon-led KPI rows.
Lifting cost is about US$ 6 per boe from 2025 to 2031, and the total cost of produced oil (TCPO) averages US$ 31 per boe in 2027-31. A scatter plot against peers (ExxonMobil, Chevron, Shell, TotalEnergies, Equinor, BP) shows Petrobras with higher production change and lower cost-per-barrel change for 2024-2026.
Left column with lifting cost and TCPO stacked bar boxes; right scatter plot with Petrobras and peers dots.
E&P greenhouse gas emissions intensity is 19.9 kg CO2e/boe in 2015, 14.8 in 2024 and 14.7 in 2025, with targets of 15.0 in 2030 and 2035 (a 25% reduction against 2015). Commitments include zero routine flaring by 2030, methane intensity of 0.20 tCH4 per thousand tHC by 2030, and Gold Standard OGMP 2.0.
Left blue panel with the 15 kg CO2e/boe headline and bullets; right grey panel with a five-bar chart.
Petrobras shows the lowest finding and development cost and highest 5-year organic reserve replacement among peers, with proven reserves of 12.1 billion boe in 2025 (SEC criteria), the highest in 10 years. Reserves/production is 12.5 years and reserves replacement ratio is 175%.
Left scatter plot of cost versus organic replacement by peer group; right two stacked bar panels for R/P and RRR versus majors.
Exploration investment is US$ 10 billion (3.4 South and Southeast margins, 3.3 Equatorial Margin, 3.3 others), with 50 new wells between 2027-2031: 15 in the Equatorial Margin, 16 in the South and Southeast margins and 19 others. A map of South America and West Africa marks the basins involved.
Left donut chart with well-count bullets; right dark-blue map of South America and West Africa with coloured basin markers.
Morpho (block FZA-M-59, WI PB 100%) expanded knowledge with the discovery of 3 hydrocarbon-bearing intervals and is the first well of a commitment to drill 8 wells in Amapa Deep Water. Mae de Ouro (block POT-M-762) in the Potiguar Basin is scheduled to start right after Morpho; 15 wells will be drilled in the Equatorial Margin.
Map of the equatorial coast with two circled block insets and text boxes, and a white call-out at top right for the 15 wells.
Six wells in Santos Basin, six in Campos Basin and one in ES Basin. Petrobras will evaluate the exploratory potential of Citrino, Jaspe, Sudoeste de Sagitario, 12 new 6th OPC blocks, Azurita and Itaimbezinha, and the commerciality of discoveries including Norte de Brava, Agua Marinha, Alto de Cabo Frio Central, Aram and Jupiter/Cruzeiro do Sul.
Map of Santos and Campos basin blocks labelled by name with a white diagonal panel carrying two bullet paragraphs.
The Minimum Exploratory Program for blocks acquired in the 4th and 5th OPC will be fully met through new 3D seismic acquisition (completed in the southern area and ongoing in the northern area). In Jun/25 Petrobras started the regional Environmental Licensing process for well drilling covering the entire area of the 32 blocks.
Left map of the North and South areas with numbered blocks outlined in yellow and cyan, and a white text panel at lower right.
Petrobras will evaluate exploratory opportunities in San Telmo North Block, Bolivian Sub-Andean and Rio Neuquen Block (Neuquen Basin, Argentina), and exploratory upsides in production assets and blocks adjacent to installed infrastructure in Brazilian basins such as Sergipe-Alagoas, Camamu-Almada, Espirito Santo, Campos and Santos.
South America map with lime basin markers and two text blocks on the left and right.
Petrobras holds 14 blocks in 4 countries: operator in 8 blocks in Cote d'Ivoire, participation in 4 blocks in Sao Tome and Principe (operator in Block 3), 1 block in Namibia (2613) and 1 block in South Africa (DWOB), the latter two as non-operator.
Left headline and 4 COUNTRIES / 14 BLOCKS stat with a globe icon; right a West Africa map with country labels and text lines.
Exploratory area grew 292% and total exploratory blocks 159% from 2023 to 2026. Blocks include 10 in FOZ and 7 in CE (Equatorial Margin), 16 in Campos, 32 in Pelotas, interest in the Cruzeiro do Sul block in Santos, 8 in Cote d'Ivoire, 4 in Sao Tome and Principe, block 2613 in Namibia and the DWOB block in South Africa.
Atlantic-wide satellite map with circular zoom insets per region, colour-coded by acquisition year, and two KPI percentages at lower left.
Mature assets gain longevity by extending productive life through revitalization, complementary projects, exploratory upsides and recovery factor initiatives, then a destination strategy of reuse or decommission. Value generation levers are listed, with post-shutdown safety, shorter removal time and innovations for the destination phase.
Blue central production decline chart with original versus extended shutdown markers, a destination panel on the right and a lever strip at the bottom.
Strategies that turn assets into new opportunities: P-31 life extended to 2030 in the mature Albacora field; P-35, berthed in Guanabara Bay after Marlim, is being evaluated for reuse; reuse of equipment (such as an LM2500+ turbine) from decommissioned units reduces cost and schedule.
Three equal cards with coloured headers (blue, teal, green), each with a photo and a short caption.
Section divider titled Main Exploration & Production Assets, introducing the asset-by-asset slides that follow.
Blue gradient background with white title text on the left and yellow angled shapes at the corners.
Total operated production is 4.46 MMboed and own production 2.96 MMboed in 3Q26, with 35 platforms (30 fully dedicated to pre-salt), plus 200 wells through 2031 and US$ 51.5 billion in investments for 2027-2031. Lifting cost is US$ 4.48 in 3Q26 and the Santos Basin pre-salt GHG index is about 10 kgCO2e/boe in 2026.
Left map outline of the Santos and Campos basins; right white panel with six circular icons and KPI labels.
2026 records: oil production 1,291 kbpd (11/05/2026), gas export 14.1 MMm3/d (08/15/2026) and water injection 984 kbpd (10/22/2026). GHG index is 9.7 kgCO2e/boe (Jan-Sep/2026) and there are 75 wells in operation (36 producers, 39 injectors).
Left 3D field block diagram on blue; right white panel with a vertical list of six icon-led KPIs.
Five FPSOs operating up to 141 kbpd above nameplate capacity, progress to 1 million barrels of water injected per day, efficiency increase of plus 5.2 p.p. (9M2026 vs 2024) and 4.3 million m3/d of gains from replacing gas treatment membranes. FPSO P-75 is back at 169 kbpd three years after its peak, after a dip to 120 kbpd.
Top row of four icon KPI cards, followed by a P-75 example with an FPSO icon and a production curve chart on a wave graphic.
Timeline from 2018-19 to 2032+: P-74 to P-77 (Buzios 1-4), FPBAR (2023), FPTAM and P-78 (2025), P-79 (May/26), P-80, P-82 and P-83 (Buzios 9, 10, 11 in 2027) and Buzios 12 in 2032+. There are 83 wells in 2027-31 (43 producers and 40 injectors), 18 of which are complementary wells including 4 RWI wells.
Left 3D field block with FPSO icons by status; right table of units by year and a green banner of well counts at the bottom.
2026 operational records include about 770 kbpd in Sep/26 (Brazil's 3rd largest production, with FPSO Pioneiro de Libra in scheduled stoppage) and a daily production record of 799 kbpd on 08/11/2026. GHG index is about 8.0 kgCO2e/boe with an associated gas utilization index of 99.8%; 47 wells are in operation (23 producers, 24 injectors).
Left 3D field block diagram; right column of icon-led records and a well count at the bottom.
Mero highlights for 2027-31: peak production in 2027, 19 additional wells opened through 2031 (11 producers and 8 injectors), and the Mero Extension Project (FEL 2 under approval) supporting the development plan revision and the request to extend the Production Sharing Contract in 2027. Technology items are HISEP in the Mero 3 area and PRM Seismic.
Left 3D field block; right two groups of icon-led bullets (highlights, pioneering and technological evolution) divided by vertical lines.
Current operated production is 1,122 kboed, with GHG index of 10.2 kgCO2e/boe and production efficiency in the industry's first quartile. For 2027-31, capex is US$ 6.7 billion, targeting a return to the 1 million bpd operated level in early 2026, an annual average of 1 million commercial boed by 2027, and an ambition of a 35% recovery factor.
Left 3D field blocks; right list of icon KPIs split into current performance and 2027-31 highlights.
Atapu 2 (P-84) in 2029 reaches 375 kbpd total field capacity (about 159 kboed, 7.8 kgCO2e/boe); Sepia 2 (P-85) in 2030 reaches 405 kbpd (about 180 kboed, 9.5 kgCO2e/boe); Itapu has operated since Dec/2022 (about 165 kboed, 6.1 kgCO2e/boe). A record of 2 million barrels of water injected per day was reached in Santos Basin in Oct/2026.
Three equal columns for Atapu, Sepia and Itapu with field blocks and metric footers, plus a fourth record column with a medal icon.
Four gas discoveries announced (Sirius-1, Sirius-2, Copuazu-1 and Sandia-1) with a subsea-to-shore concept needing no offshore processing platform. The first phase has 4 producer wells and a 117 km pipeline to shore, with about 5.8 Tcf of gas in place.
Left subsea concept illustration with three icon stats beneath; right text bullets and a Colombia map highlight.
19 units in operation, with production 34% higher than 2024 and 10% higher than 2025, an 11% reduction in lifting cost (2Q26 vs 2025), 19% of Brazil's oil production in 1H26 and a 10 p.p. increase in operational efficiency (2026 vs 2024). There are 22 exploratory blocks, 13 of which were acquired in 2026.
Left map of Campos Basin fields and blocks; right white column with six icon-led metrics.
2 new units in 2027-31 with more than 10% production growth by the end of the period, and 4 new units under study; capex 2027-31 is US$ 16 billion, with 7 units receiving capex for productive life extension and plus 120 new wells. Lifting cost falls 14% in 2031 vs 2Q26.
Left map highlighting new production units in yellow; right column with six icon-led metrics.
Marlim and Voador: 2 units in ramp-up, more than 70 new and relocated wells and more than 20% lifting cost reduction since start-up. Albacora: production start-up in 2031, more than 20 new and relocated wells and more than 70% lifting cost reduction vs 2023.
Two before-and-after field comparisons with icon metrics on a grey band, and a production curve chart with a blue banner message below.
Urucu has 40 years of sustainable production, a preserved concession area of 98%, 2026 flaring 8.3% lower than 2025 and plans 8 producer wells over the next 5 years. Bahia has 21 wells drilled and in operation with 13 more planned, 20% production increase vs 2025 and around 90 new producers and 28 injectors planned over 5 years.
Brazil map in the centre with two rounded cards (Urucu on the left, Bahia on the right) each listing icon-led facts.
Section divider for the Refining, Transportation and Marketing part, with three employees credited as Philippe Pecanha, Sabrina Alves and Eliel Bomfim in orange overalls.
Orange background with three standing workers on the left and a yellow diagonal panel carrying the white title.
Five RTM focus areas: High-Quality Products (self-sufficiency in diesel capacity), Resilient Refining System (ambition of first quartile in OA and IES indicators), Biorefining (SAF, SBC and HVO production), Competitive Logistics (expand ships, pipelines and storage) and Fertilizers and Petrochemicals (monetize natural gas).
Five vertical columns each with a blue header, a mid-blue description block and a white target box.
Installed crude oil processing capacity (distillation feedstock) is 1,813 kbpd across refineries: Recap 57, Revap 252, RPBC 170, Replan 434, Reduc 239, Regap 157, Rnest 88, Lubnor 8, Repar 208 and Refap 201 kbpd.
Left map of Brazil with refinery icons in highlighted states; right colour-coded table by state and refinery with capacity.
Processing capacity grows from 1,813 kbpd in 2024 to 2,173 kbpd in 2031: plus 67 kbpd in 2025-26, plus 212 kbpd in 2027-31, plus 81 kbpd under evaluation (40 of which are included in BP 2027-31). Totals are Rnest plus 212 kbpd and refinery revamps plus 148 kbpd, or plus 360 kbpd over 2025-2031.
Bridge-style bar chart across time from 2024 to 2031 with a blue panel at lower right summarising the totals.
Increases in installed capacity by refinery: 2025/2026 Revap plus 19, RPBC plus 6 and Rnest plus 42 kbpd; 2027-31 RPBC plus 25, Replan plus 25, Reduc plus 24, Regap plus 25, Rnest plus 170, Repar plus 12 and Refap plus 12 kbpd. 2027-31 total is plus 293 kbpd, bringing processing capacity in 2031 to 2,173 kbpd.
Left colour-coded table by state and refinery with two period columns; right blue panel with barrel icons and total capacity.
Distillation feedstock project start-up schedule from 2025/2026 to 2031: completed Rnest Train 1 plus SNOx (plus 42), RPBC UV (plus 6) and Revap U-210 (plus 19); upcoming Rnest UDA U-12 (plus 50), Rnest Train 2 (plus 80), Replan U-200A (plus 25) and others, with Rnest Trains 1 and 2 revamp (plus 40) included in BP 2027-31 for 2031. Several projects are marked as under evaluation.
Horizontal timeline arrow with project boxes above and below the line, check marks for completed projects and lime dots for under evaluation.
Diesel market share in 9M26: Petrobras production 59%, other players production 8%, Petrobras imports 6%, other players imports 13% and biodiesel 14%. Diesel capacity additions are plus 112 kbpd in 2025/2026 and plus 293 kbpd of S10 diesel in 2027-31, for a total of plus 405 kbpd by 2031.
Left pie chart of diesel market share, right demand-versus-capacity bar graphic, and a bottom blue chevron bar with additions by period.
Plus 293 kbpd of S10 diesel in 2027-31, of which 139 kbpd is quality improvement and 154 kbpd additional volume, led by Rnest (plus 108), Boaventura (plus 76) and Refap (plus 31). Additional diesel volume is estimated to generate EBITDA of US$ 1.1 billion per year.
Left table by refinery with three columns (S10 diesel, quality improvement, additional volume) and a green EBITDA call-out on the right.
Timeline of S10 diesel projects: completed items in 2025/2026 include Rnest distillation revamp (plus 6), Replan new HDT (plus 63), RPBC (plus 2) and Revap HDT (plus 41); later items include Rnest Train 2 (plus 88), Boaventura HCC/HDT (plus 56 and plus 20), Repar new HDT (plus 23) and Refap new HDT (plus 27). Icons distinguish additional volume, exchange of S500 for S10 and under evaluation.
Horizontal timeline with project boxes above and below the line and a legend at the lower left.
Rnest adds Train I plus SNOx (plus 42 kbpd), ADU U-12 (plus 50), Train II (plus 80) and Revamp Trains I and II (plus 40) of processing capacity, with S10 diesel of plus 6, plus 88 and plus 20; Capex BP 2027-31 is US$ 1.7 billion. Boaventura Refining (start-up 2029) adds plus 76 kbpd of S10 diesel, plus 20 of jet fuel and plus 12 of Group II lubricants; Capex BP 2027-31 is US$ 2.9 billion.
Two large rounded panels (Rnest in blue, Boaventura in green) with milestone chevrons and metric rows, capex banners at the bottom.
2030 ambition covers energy performance (IES at or below 86), sustainability (emissions intensity IGEE at or below 35 kgCO2eq/CWT), value (ability to process 100% of pre-salt crude oils, achieved in April 2026) and reliability via ProCONF. Cumulative gains are a 3,394 million m3 reduction in NG consumption and 5,959 thousand ton CO2eq of avoided emissions; new investments are US$ 1.3 billion over five years for more than 70 projects.
Central blue panel with four ambition quadrants, a right teal panel of cumulative gains and a green panel of new investments at the lower right.
ProCONF targets operational availability of at least 97% by 2030, with 95.9% in 2023, 96.4% in 2026 and 97.2% in 2031. Scheduled stoppage investments are US$ 1.8 billion in 2027-28 and US$ 3.5 billion in BP 2027-31; utilization factor was 95%, 101% and 99% in 1Q26-3Q26, and each 1% increase in FUT in 2026 adds 19 kbpd of refined product output and US$ 100 million in revenue.
Two top panels (ProCONF line chart and scheduled stoppage investments) and a teal band with quarterly FUT bars and a KPI box.
Four drivers of higher scheduled stoppage capex: postponement of stoppages from 2026 to 2027, higher utilization factor, more complex stoppages and new equipment in the multi-year plan. Scheduled stoppages in 2027 involve REPLAN (4,500 workers), RPBC (3,150), REGAP (3,100), RECAP (4,550), REDUC (3,200) and REVAP (300).
Left numbered list of four drivers in a rounded panel; right green panel with a grid of refinery names, scopes and worker counts.
EBITDA per barrel of oil rises 20% in refining from 2027 to 2031, with refining shown as 6x sales in 2027 and 12x in 2031. The share of Petrobras crude oil destined to refining goes from 55% in 2027 to 58% in 2031, while sales falls from 45% to 42%.
Left paired bar chart of refining versus sales EBITDA per barrel, centre line chart of crude destination, and an aerial Rnest photo on the right.
Four digital innovations: GIRO (digitalization of operational routines, recognized by Gartner Eye on Innovation Awards in the Americas), OTS (operational training simulator), TRACKPLAN (digital planning for Refining plus Logistics) and Blending Online (real-time optimization of intermediate stream blending to reduce giveaway and increase diesel production).
Four equal columns with title, subtitle, icon illustration and description, with a blue band and giveaway definition at the bottom.
Diesel R is already produced by coprocessing, with Diesel R5 marketed since September 2023. SAF with international CORSIA certification has been produced at REDUC since 2025; dedicated plants are RPBC HEFA (15 kbpd, 2030, construction started), Boaventura HEFA (19 kbpd, 2032+, under evaluation) and Replan ATJ (10 kbpd, 2032+, under evaluation), plus a Riograndense partnership (15 kbpd).
Left blue Diesel R card, central green sustainable aviation fuel card and a right-hand award photo with highlighted text; footnotes at lower left.
Three investment areas: fleet expansion (ships and vessels) at US$ 2.1 billion (including US$ 0.6 billion target for acquisition of MR2 and Handy-1 vessels), expanding presence at Brazil's growth frontiers (Midwest, Northern Arc and MATOPIBA) at US$ 1.4 billion, and expanding and maintaining logistics infrastructure at US$ 3.5 billion.
Three equal rounded cards (blue, green, teal) with icon headers, descriptions and an investment figure at the bottom.
Construction of 21 cabotage vessels (8 gas carriers, 4 Handy 2, 4 MR1, 4 MR2, 1 Handy 1) and 18 barges, for US$ 2.1 billion in investment. Chartering of 30 new support vessels (12 PSVs, 10 OSRVs and 8 RSVs) has an estimated third-party construction cost of about US$ 2.7 billion.
Left shipyard photo and text list of vessel types with delivery notes; right blue panel with the chartering list and cost.
Expanded presence in Brazil's Midwest and MATOPIBA through commercial initiatives and efficient logistics, more synergies in the Northern Arc, and lower logistics costs and carbon footprint. Projects: new REPLAN-Midwest pipeline, OSBRA pipeline capacity expansion, higher rail volumes via REPLAN, and a new multimodal terminal in Itaqui, Maranhao.
Left Brazil map with numbered route markers; right green summary box above a list of four project categories with bullets.
Santos Waterway Terminal commitments include a new pier with 3 berths, 10 new tanks (total of 150 thousand m3) and new truck loading stations. The New OBAPI Pipeline is a 130 km pipeline for heavy distillates connecting the Barueri and Cubatao terminals in SP, with new tanks at Cubatao; its map legend appears to show 137 km for OBAPI.
Two side-by-side cards (Santos Waterway Terminal, New OBAPI Pipeline) with bullets, relevance lists, a terminal photo at left and a satellite pipeline map at lower right.
Signing for the acquisition of the remaining 70% equity interest in Logum on 11/11/2026. Logum sits on Brazil's main ethanol logistics corridor linking production hubs to the Sao Paulo metropolitan area and the Ilha D'Agua port terminal, with operational synergies with the Petrobras system. Completion is subject to conditions precedent including CADE approval.
Left column of two bullet blocks with icon, right-hand map of SP/MG/RJ with Logum pipelines, Petrobras subcontracted pipelines and ethanol-flow arrows, footnote at bottom.
Total Capex BP 2027-31 is US$ 1.5 billion. Coverage of domestic urea demand rises from 20% in 2027 (FAFEN-BA, FAFEN-SE and ANSA) to 35% in 2029 with UFN-III. Context: 100% of urea used in Brazil in 2025 was imported (NPK fertilizers: 92%), about 1/3 of traded urea passes through the Strait of Hormuz, and international urea prices rose 35% in two weeks (Mar/2026).
Left panel with a blue 'Context' card of three themes; right grey panel with a two-bar chart above a bulleted list of Petrobras opportunities.
FAFEN-SE (urea 1,800 t/d, ~7% of domestic demand), FAFEN-BA (1,300 t/d, ~5%) and ANSA-PR (1,970 t/d, ~8%) are back in operation. Since January 2026 FAFEN-BA and FAFEN-SE sold 500 thousand t of urea and 135 thousand t of ammonia, a 12% average share of the domestic urea market. Capex under implementation is US$ 0.5 billion.
Brazil map with three unit markers on the left, central blue 'Sales levels' card, right grey column on Capex and sustainability.
Schedule and budget unchanged since project approval, with start of commercial operation in 2029. Construction in numbers: ~US$ 1 billion Capex to completion, 3,600 t/d of urea plus 2,200 t/d of ammonia (177 t/d available for sale) and ~8 thousand jobs during construction. UFN-III in Tres Lagoas (MS) increases domestic urea demand coverage by ~15%.
Horizontal four-milestone timeline on top, blue 'Construction in numbers' panel with three columns below, green callout on a grey right sidebar.
Petrochemicals are presented as a way to keep capturing value across Petrobras' chain amid declining fuel demand. Boaventura integration includes a US$ 0.1 billion logistics integration project with existing petrochemical assets; refining integration targets higher supply of propylene and other feedstocks.
Two-column text slide, business drivers on the left and integration opportunities (Boaventura, Refining) on the right, over a blue and yellow corner graphic.
With investments under BP 2027-31 and a diesel crack spread of around US$20/bbl, Petrobras expects average potential EBITDA for the RTM segment of ~US$ 9 billion per year. Levers listed: reliability, quality, processing capacity and production of high value-added products. Crack spread refers to the U.S. Gulf Coast.
Full-bleed refinery night photo on the left, white diagonal panel with four plus-icon bullets and a blue-and-grey EBITDA callout on the right.
BP 2027-31 total RTM portfolio is US$ 23.6 billion, of which 22.6 in implementation and 1.0 in evaluation. By segment: Refining 15.0, Marketing and Logistics 7.0, Fertilizers 1.5 and Petrochemicals 0.1 (US$ billion). Projections are subject to +/-5% variation.
Centered double donut chart with total in the middle and a legend strip underneath, green corner shape on the right.
Waterfall from BP 2026-30 (15.8) through inflation +1.0, FX +0.5 and period adjustment -0.7 to a normalized 16.6, then resilient refining portfolio +2.3, capital project reviews +1.4, competitive logistics +1.1, fertilizers and petrochemicals +0.6 and improved project execution +0.6, reaching 22.6 in BP 2027-31 (US$ billion). The final bar splits into Refining 14.1, C&L 6.8, Fertilizers 1.5 and Petrochemicals 0.1.
Full-width waterfall chart with grey total circles, teal increments, one orange decrement and rounded call-out boxes describing the drivers.
Section divider titled in Portuguese, 'Gas e Energias de Baixo Carbono' (Gas and Low Carbon Energies), over a photo of three Petrobras employees in orange coveralls. No numeric content.
Full-bleed photograph on a yellow and orange background with large white title text at lower right and Petrobras logo top right.
Value proposition for Gas & Power: act in a competitive and integrated way in the operation and commercialization of gas and energy, optimizing the portfolio and promoting the inclusion of renewable sources.
Pipeline photo on the left with a large blue diagonal panel carrying a single statement on the right.
Natural gas: +19% domestic gas (own production, 9M25 vs. 9M26), +100 MMm3/day processing capacity, 40 MM m3/day in two regasification terminals, 99.99% supply reliability and over 30 years of experience. Energy: 6th largest power generation player with 13 thermal plants and 4.6 GW of capacity; nine previously uncontracted assets were recontracted in the 2026 LRCAP; new plants planned in the Boaventura Energy Complex (800MW).
Left blue panel with a Brazil map and legend, right side two rounded cards (Natural Gas in lime, Energy in green) with bullet lists.
Thermal power portfolio recontracted for up to 10 years, securing R$ 4.3 billion in annual revenue. Contracted capacity went from 2.0 GW before to 4.6 GW now, with ~R$ 65 billion total fixed revenue from the portfolio; thermal plants can consume up to ~16.6 MM m3/day of gas when dispatched. Strategic implications: cash flow predictability, energy security and flexible gas demand.
Left text column with Key Figures and Strategic Implications, right Brazil map highlighting contracted states in blue with plant names.
Goal: be the #1 choice in the market. Structural actions include more domestic gas from own production, new commercial products, customer-base mapping and a new relationship channel. Results: all distributors in the integrated network supplied, free-market sales growth of around 70% (9M26 vs. 9M25) and a doubled customer base.
Two-column text slide, 'Structural Actions' pill on the left and 'Results' pill on the right, grey right background.
BP 2027-31 total G&P portfolio is US$ 3.0 billion: 1.9 in implementation and 1.1 in evaluation. By category: Current Investments 1.8, Adjustments of Natural Gas Processing Units 0.2, New Thermal Power Plants 0.6 and Others 0.5. Projections subject to +/-5% variation.
Centered double donut chart with total in the middle and legend beneath, orange left-edge shape.
Waterfall from BP 2026-30 (2.2) with inflation +0.1, FX +0.1 and period adjustment -0.2 to normalized 2.2, then current investments +0.2 and return of the new thermo power plant to the portfolio under evaluation -0.4, ending at 1.9 in BP 2027-31 (US$ billion). The BP 2027-31 stack is Power 0.6, Gas 0.7 and Natural gas processing 0.7.
Waterfall chart with stacked start and end columns, grey normalized bar and legend below.
Value proposition for Low Carbon: operate in low-carbon businesses, diversifying the portfolio in a profitable way and promoting the longevity of Petrobras.
Forest and glass-building photo on the left with a large green diagonal panel holding the statement on the right.
Stacked bars for 2025 vs 2040: Light/gasoline 2.3 to 2.5 exajoules, Aviation/jet fuel 0.3 to 0.4, Heavy/diesel 1.7 to 2.3, Maritime/bunker 0.1 to 0.2, and electricity mix 81.9 to 136.2 GW avg. Notes: ethanol currently at 32% and could reach 35%; biodiesel mandate potentially reaching 20% by 2030; SAF compliance with CORSIA from 2027.
Five side-by-side panels each with a two-column stacked bar chart, legend and caption underneath.
Gantt-style chart of entry timing by segment from 2025 to 2032+: decarbonization, biodiesel and biorefining & green chemicals from 2025; solar and onshore wind and energy storage from 2026; ethanol and biomethane from 2027; carbon capture from 2028; low carbon hydrogen & derivatives and critical minerals from 2029; offshore wind from 2032+. The chart shows time frame of entry, not investment intensity.
Eleven horizontal gradient bars with icons on the left and a year axis at the bottom.
Flow from biofuel chains (ethanol, biodiesel, biomethane) through an integrated industrial platform (biorefining and the refining system as a hub) to markets and consumers: light mobility, road transport, aviation and maritime, industry and cities. Message: more alternatives to preserve the competitiveness and value of existing businesses.
Three-column left-to-right flow diagram with chevron connectors and a table of products and routes on the right.
Ethanol has a central role in future light transportation with potential in aviation and maritime. The anhydrous ethanol blend is currently 32% (E32) and potentially 35% by 2030; entry model is minority stakes in leading companies. Synergies: refining feedstock, backhaul freight, direct sales, CCS & BECCS and e-fuel.
Photo strip on the left, centre column of Regulatory, Market and Model text, right grey column titled Synergies.
Neomille is owned 42% by Petrobras and 58% by Cerradinho. Strategic cooperation with rights of first refusal (20 years): acquisition of 42% of ethanol volume and 90% of technical corn oil volume, and supply of 50% of diesel demand. Plants: Chapadao do Ceu (GO) 1.1 MM ton/year milling and 0.5 bn l/year ethanol; Maracaju (MS) 0.6 MM ton/year and 0.3 bn l/year.
Left ownership diagram with logos, centre map with two plant locations, right grey column with cooperation terms and plant data.
Regulatory advances foster a large potential market: the biomethane mandate is approved, with entry into force pending the first CGOBs. Petrobras plans a minority stake with a relevant player and will hold calls for proposals for biomethane and CGOB contracts of up to ten years, starting in 2027. Seven synergies are listed, including hedge for mandate obligation and BECCS.
Photo strip on the left, centre column of Regulatory, Market, Model and Call for proposals, right grey Synergies column.
Biodiesel is positioned as a solution for decarbonizing heavy road transport with an outlook for maritime. The mandate is currently 15% and potentially 20% by 2030, with CNPE possibly raising the annual target up to 25%. Synergies: biorefining, marine fuel (B24 and B100 markets) and direct sales.
Soybean photo on the left, centre text with Regulatory, Market and Model, right grey Synergies column.
Diesel R coprocessing is available and has been marketed since September 2023. SAF coprocessing: REDUC with CORSIA certification since 2025; REVAP, REGAP and REPLAN implemented and undergoing certification. Dedicated plants: RPBC HEFA 15 Kbpd (2030), Boaventura HEFA 19 Kbpd (2032+), REPLAN ATJ 10 Kbpd (2032+); RPBC FID is approved.
Three outlined boxes (Diesel R, SAF, Raw materials) on a refinery photo background strip.
Flow from renewable generation (onshore wind, solar photovoltaic) to an integrated storage platform (BESS, battery cell and pack assembly, critical minerals) to markets and energy consumers (power system, industry, mobility, cities). Message: growth in renewable generation reinforces the importance of storage and requires critical minerals.
Three-column flow diagram with circular images and chevrons, mirroring slide 111.
Renewable generation joint venture with Lightsource BP: Milagres Solar PV plant (CE) with 212 MWp installed since 2023 and a pipeline of 1 to 1.5 GW at a more advanced stage; the JV registered storage projects for the Capacity Reserve Auction. Our choices and focus areas include data centers, industries and electrolysis hydrogen support.
Solar and wind photo strip on the left, text on white, large teal diagonal panel at lower right for the joint venture.
A strong Brazilian market with expected demand through capacity reserve auctions. Segment outlook: growing demand tied to the energy mix and curtailment mitigation; focus areas: BESS projects under competitive business models, own or in partnership, plus internal energy optimization.
Two text columns (Segment outlook, Focus areas) above a wide photo of battery storage containers.
Strong growth in battery demand drives demand for minerals; Decree 13,146/2026 defines the country's critical and strategic minerals. Petrobras assesses business and R&D opportunities, prioritizing synergy with the battery value chain. Value chain in nine steps: exploration, extraction, refining, battery cell assembly, packs, BESS, electric mobility charging, reuse and recycling, split upstream, midstream (R&D) and downstream.
Photo strip on the left, Context and Our approach text on top, nine-step process bar across the bottom.
A solution for hard-to-abate sectors. Pilot plants: Acu Valley (RN) 2 MW of electrolysis (2027) and REPLAN (SP) 20 MW (2030). Own and partnership projects: low carbon ammonia (BA) 130 kta (2030+) and e-methanol (SP) 100 kta (2030+).
Left column of Key levers, Auctions and Model, middle column of projects, aerial photo of the Acu Valley pilot at right.
CCUS-EOR in the pre-salt has accumulated ~87.5 MtCO2 since 2015. Sao Tome pilot is the first CCS pilot in Brazil, injecting 100,000 tCO2/year into a saline reservoir. Four CCUS hub projects are under study (SP, RJ, ES and BA).
Three vertical grey panels (CCUS-EOR, Sao Tome pilot, CCUS hubs) with illustrations of a FPSO, subsea well and an industrial hub.
R&D themes arranged along the value chain: renewable feedstocks and circular economy, biomethane, feedstock pretreatment, energy densification of biomass, biofuel technologies (co-processing, SAF, LCAF, HVO, bunker), green chemistry and performance and quality of renewable products. Stages: sustainable raw materials, preprocessing, conversion/processing and products.
Seven rounded cards in a staggered row with photos, closed by four blue stage bars along the bottom.
BP 2027-31 total Low Carbon portfolio is US$ 5.3 billion: 2.0 in implementation and 3.3 in evaluation. By area: Onshore wind and solar PV 0.8, Low carbon hydrogen and derivatives 0.6, CCUS, CVC and others 0.9, Ethanol 1.3, Biodiesel/Biomethane 0.9 and BESS 0.8.
Centered double donut chart with total in the middle and two-row legend underneath.
Waterfall from BP 2026-30 (1.8) with inflation +0.04, FX +0.004 and period adjustment -0.5 to normalized 1.4, then Wind & Solar +0.2 and BESS, CCUS, CVC & others +0.4 to reach 2.0 in BP 2027-31 (US$ billion). Ethanol is 1.3 in both end columns.
Waterfall chart with stacked start and end columns, grey normalized bar and five-item legend.
Section divider titled 'Climate Change and Decarbonization', with two employees in conversation on a light blue background. No numeric content.
Photograph of two people on a sky-blue field with a large white title in a blue diagonal shape and Petrobras logo at top right.
Decarbonization as a value lever, built on three pillars: transparency and climate change management (governance up to the Board, third-party verified inventory); competitiveness of the O&G portfolio (resilience of the fossil portfolio amid the transition); and low carbon business, Scope 3 emissions and just transition (portfolio exposure to carbon).
Three equal rounded columns with coloured headers, icons above and bullet lists below.
Table comparing the previous 2030 commitments with the revised 2030 and new 2035: absolute operational emissions -30% to -18% (2030) and -20% to -18% (2035), reference 2015; routine flaring zero; E&P GHG intensity up to 15 kgCO2e/boe; refining intensity 30 to 35 (2030) and 33-34 (2035) kgCO2e/CWT; upstream methane intensity 0.20. Ambitions: Net Zero by 2050 and Near Zero Methane 2030.
Row-based table with icons at left, three data columns (2030 Previous, 2030 Revised, 2035) and an Ambitions box.
Scopes 1 and 2 emissions in MtCO2e: 78 (2015), 56 (2020), 62 (2021), 48, 46, 47 and 50 (2025). Commitments: 64 in 2030 (-18% vs 2015) and 62-64 in 2035. Text says the trajectory will be supported by efficiency gains and mitigation projects, aiming to limit peak emissions in the early 2030s.
Bar chart with blue historical bars and green commitment bars on the left, grey text sidebar on the right.
E&P GHG intensity (kgCO2e/boe) fell from 19.9 in 2015 to 14.7 in 2025 (9M26 14.1), against an industry average of 18.7 (IOGP); commitment is to stay at 15 in 2030 and 2035. Between 2015 and 2025 intensity was reduced by 26% while operated production grew by more than 50%; pre-salt assets are around 10 kgCO2e/boe.
Bar chart with an industry-average dotted line on the left, grey sidebar with explanatory text on the right.
Upstream methane emissions intensity (tCH4/thousand tHC) fell from 0.65 in 2015 to 0.23 in 2025 and 9M26, a 65% reduction, with a 2030 commitment of 0.20. The 2025 increase is attributed to improved monitoring and quantification under OGMP 2.0; in October 2026 Petrobras was awarded the OGMP 2.0 Gold Standard. The roadmap to near zero methane has venting, flaring and fugitive levers.
Bar chart and roadmap waterfall on the left, grey sidebar on Monitoring and Mitigation on the right.
Refining GHG intensity (kgCO2e/CWT): 43 in 2015, 36.7 in 2025 and 37.2 in 9M26; commitments 35 for 2030 and 34-33 for 2035. Text states a 15% improvement over 10 years, about 5.9 million tCO2e avoided to date, and new investments of more than US$ 1 billion planned over five years for an additional ~2 million tCO2e per year reduction by 2030.
Bar chart on the left with commitment bars, sidebar of text on the right and two footnotes at the bottom.
Carbon Neutral Program deepens opportunities. Waterfall from 2015 to 2025 to Target 2030 with portfolio growth increasing emissions and process efficiency, energy, losses and CCUS reducing them. Investments in emission mitigation from 2027 to 2031 are US$ 4.8 billion, 14% higher than BP 2026-30 (Scopes 1 and 2); 12 Decarbonization Fund projects contribute 0.24 MMtCO2e by 2030.
Schematic waterfall on the upper left, three coloured lever tiles below, green sidebar with the US$ 4.8 billion callout on the right.
Net Zero 2050 ambition supported by promising technologies. Five R&D lines: technologies to reduce fuel consumption (operational efficiency), methane monitoring and mitigation (loss reduction), low carbon energies (energy mix), low carbon hydrogen and renewable feedstocks (industrial processes) and CCUS.
Five equal outlined columns with circular images at the top, bullet lists inside and a theme label at the bottom of each.
Portfolio GHG emissions intensity could stay at the 2022 level in 2030 with a prospective reduction of up to 2.5% by 2035. Renewable fuel production capacity could expand up to 5.5x (50 thousand boed) in 2030 and 10.3x (92 thousand boed) in 2035 vs 2022; renewable electricity could reach up to 21% (around 1.3 GW) of installed capacity in 2030 and 24% (1.7 GW) in 2035.
White left side with the intensity message and a blue diagonal panel on the right listing fuel and electricity projections.
11% of total BP 2027-31 investments. Decarbonization: emission mitigation US$ 4.8 billion (E&P, RTM and G&P 3.5; Decarbonization Fund 1.3). Profitable diversification: renewables and low carbon US$ 2.6 billion and bioproducts US$ 4.1 billion. R&D low carbon US$ 2.0 billion, 23% of total R&D budget in 2027 reaching 40% by the end of the period.
Three coloured column cards (Decarbonization, Profitable diversification, R&D) with sub-figures in grey bodies.
Section divider titled 'Engineering, Technology & Innovation' with two employees walking on a teal background. No numeric content.
Photograph left, yellow title text on a teal diagonal shape and Petrobras logo at top right.
Three pillars: maximize value generation throughout the project life cycle, ensure resource readiness within the required time, cost and quality, and innovate to optimize assets and enable future projects and new businesses (including digitization, automation and AI adoption).
Three rounded columns in green, blue and teal with bullet lists beneath.
Planned vs executed Petrobras investment (US$ billion) for 2020-2026, with a 2026 forecast of 24-25.5 and average under-execution of ~20% in earlier years versus a higher level of execution recently. The start-up predictability table shows Buzios 8 (P-79), Buzios 6 (P-78), Mero 4, Buzios 7, REVAP HDT, REPLAN HDT and RNEST Train 1 delivered in the planned year, with Mero 4, REVAP HDT and REPLAN HDT ahead of schedule.
Left grey card with a planned vs execution bar chart, right table of projects with BP 2024-28 and execution years and check marks.
A project life-cycle curve shows Capex shares of subsea 25%-40%, wells 15%-25% and topside 40%-55%, with 65-80% spent by first oil and 85-95% by peak production. A stacked bar chart shows main E&P production-system Capex 2027-2031 by discipline. 2027-2028 highlights include Buzios 8 ramp-up, start-up of Buzios 9, 10 and 11, ADU for RNEST Train 2 in 2027 (+50 thousand barrels) and over 20,000 contractors mobilized.
Two chart panels at the top (life-cycle curve and stacked bars), blue diagonal panel with highlights at lower left and notes at lower right.
Buzios 8 (P-79) started up 3 months ahead of BP 2026-30; in 2026, 45% of pipelines tied in and 74% of Wet Christmas Trees installed were reused. A bar chart of wells tied in per year (2016 to 2026 projected) peaks at 77 in 2025, with 63 projected for 2026, and around 90% of new-well production achieved.
Left green cards (integrated teams, commissioning), right blue resource-readiness panel with bullets and a bar-and-line chart.
Ramp-up duration of pre-salt units has trended downward from 2010 to 2025; FPSO Almirante Barroso (Buzios 5) set a record of under 5 months and FPSO Almirante Tamandare reached 225 kbpd in under 6 months. P-78 (Buzios 6) had first gas injection in Mar/26 and peak production in Oct/26; P-79 (Buzios 8) started up in May/26, 3 months ahead of BP 2026-30.
Green box of improvement levers, scatter plot with trend line in the middle, two bottom panels with unit photos and milestones.
Petrobras is authorized to expand production capacity by up to 282 kbpd; additional authorized capacity in 2026 ranges from +10 to +45 kbpd across eleven platforms (e.g. Buzios 7 +45, Mero 2 +45, Mero 4 +45). Additional 2026 volume corresponded to 7 days of Petrobras' production, with an average gain of 87 kbpd; six more units have planned capacity increases and an ambition of up to 260 kbpd.
Left stat boxes, a large bordered grid of eleven platform photos with kbpd labels, green banner across the bottom.
Topside weight reduction with proportional Capex reduction: SEAP ~5k ton (-10%), Albacora ~5k ton (-13%), Buzios 12 ~11k ton (-17%) and REVIT Tupi ~26k ton (-51%). Six hexagonal levers: engineering guidelines, estimates and controls, project commissioning, reliability and suppliers, project schedules and costs.
Left hexagon cluster of levers, right green diagonal panel with four teal bars of percentage reductions.
Potential cost and schedule savings: ~50% reduction in pipeline investment (pipe-by-the-meter procurement), 30% Capex reduction in the subsea system, 70% reduction in material variability, plus a PLV fleet alternative to traditional EPCI. Left side lists project standardization, early supplier involvement, qualifications outside the critical path and defined schedule for platform upgrades.
Blue header banner, four green-icon rows on the left, and a right card with four blue figure tags and descriptions.
MORPHO well in the Equatorial Margin (block FZA-M-59, WI PB 100%) resulted in three oil discoveries in a new frontier: 175 km off Amapa, 2,900 meters of water depth, final depth ~7,000 meters. Colombia campaign: 5 wells drilled, 2 formation tests, ~2.5 years; Sandia-1 drilled in 48 days at 86 meters per day.
Dark blue map of the Brazilian equatorial margin on the left with a block inset, text columns in the middle and a white panel on the right for Colombia.
For 2027-2031: ~250 wells to be drilled and completed, ~280 wells to be tied-in and ~200 P&A interventions on subsea wet-tree wells. Estimated average five-year expenditure distribution: drilling rigs well drilling & completion ~70%, workover ~10%, P&A ~20%; subsea support vessels ~60% / ~30% / ~10% across Capex, Opex and decommissioning.
Left green text box and large green numbers, right grid of coloured cells by Capex, Opex and Decommissioning.
Timeline 2026 to 2032+: Buzios 8 (P-79, 180 kbpd) in 2026; Buzios 9, 10 and 11 (P-80, P-82, P-83, 225 kbpd each) in 2027; Raia (126 kbpd, WI PB 30%) in 2028; Atapu 2 (P-84, 225 kbpd) in 2029; Sepia 2 (P-85, 225 kbpd) and SEAP 2 (P-87, 120 kbpd) in 2030; SEAP 1 (P-81) and REVIT Albacora (P-88) in 2031. Around 100 new wells from complementary projects over five years.
Wavy blue timeline with vertical stems for each year, coloured circles for unit types and a dashed box for 2032+ to-be-contracted projects.
Buzios field has 8 FPSOs in operation with 1.33 MM bpd installed capacity, 3 FPSOs under implementation, more than 2 MM bpd of installed capacity in 2027 and 1 FPSO under procurement. Status: Buzios 6 peak in Oct/26, Buzios 8 in ramp-up, Buzios 9 and 10 sailing to Brazil and Buzios 11 preparing to leave the shipyard.
Santos Basin locator at the left, blue panel with field figures at top right, row of five FPSO photos beneath.
Atapu 2 (P-84) for 2029 has module lifting started, EPCI contracted, drilling underway, first WCTs received and a preliminary license issued (Stage 4); Sepia 2 (P-85) for 2030 has the same status items. New technologies on P-84 and P-85 include an all-electric system, DHSV-e and PACI-e (reliability above 90%).
Left field map and technology text, right two stacked colour cards (blue for Atapu 2, green for Sepia 2) with shipyard photos.
Buzios 12 (P-91) is an FPSO with 180 kbpd capacity, with a 17% reduction in topsides weight versus original assumptions and gas routed to the Boaventura Energy Complex via the Route 3 pipeline. REVIT Albacora (P-88) has 120 kbpd of oil and up to 4.3 MMm3/d of gas, is in negotiation and is scheduled for start-up in 2031.
Two-column text slide, left grey shape for Buzios 12 and right outlined area for REVIT Albacora.
2027-31: 27 production units to be removed (17 fixed, 6 floating, 4 semi-submersible) at US$ 11.2 billion (68% / 32% split) plus US$ 0.4 billion in financial commitments; 2032 and beyond: 40 units (32 fixed, 7 floating, 1 semi-submersible). Units by basin: 15 in the northeast basins, 8 in Campos and 4 in Santos; ~500 wells with abandonment interventions (59% dry-tree, 41% wet-tree) and ~1,900 km of flexible lines to be recovered.
Left coastal map with basin counts, right grey area with a central donut flanked by two period columns and horizontal bars below.
Main projects timeline 2026 to 2032+: OSBRA (2026); RNEST partial delivery of Train 2 ADU and Santos Terminal on-site (2027); RECAP combustion boiler (2028); RNEST Train 2, UFN-III, Boaventura refining and CCS pilot Sao Tome (2029); RPBC HEFA (2030); and 2032+ projects such as H2V hydrogen hub, OBAPI and REFAP HDT. Dashed outlines mark items still to be contracted.
Blue wave timeline with yearly columns of coloured project tags and a dashed box for 2032+.
Boaventura Refining (start-up 2029): +76 kbpd S10 diesel, +20 kbpd jet fuel and +12 kbpd lubricant oils, ~10,000 workers mobilized. RNEST Train 2 (start-up 2029): +130 thousand barrels of capacity, ~8,800 workers. UFN-III (start-up 2029): +3,600 t/d of urea (15% of domestic demand) and +177 t/d of ammonia for sale, ~1,800 workers.
Three rounded cards with photo medallions and blue headers, each holding capacity figures and progress bullets.
RPBC HEFA is the first dedicated plant for bio-jet fuel and renewable diesel (15 kbpd, start-up scheduled for 2030, environmental licenses issued and main contracts signed); Boaventura HEFA is the second (19 kbpd, 2032+, in planning). Efficiency projects at REPLAN, RPBC, RECAP, REDUC and REGAP are marked ongoing or under procurement.
Left two teal cards for HEFA plants, right blue-headed panel of refinery project lists in two columns.
Alemoa Terminal (Santos, SP) handles outflow from the four Sao Paulo refineries: on-site work is ongoing with start-up in 2027, pier and dredging in 2032+. OBAPI (Barueri-Caminho de Pilões oil pipeline) involves replacement and relocation of the heavy distillates pipeline, with start-up in 2032+.
Two rounded cards with blue headers and aerial images, scope bullets beneath, on a green corner shape.
Sao Tome CCS Pilot, 2029, with 100 thousand tCO2/year capture and conditioning capacity; the project is in procurement with part of the scope already contracted. It removes CO2 from the Cabiunas Gas Treatment Unit, transports it by ~70 km pipeline and injects it into the Sao Tome saline reservoir at Barra do Furado. Embedded diagram labels are in Portuguese.
Left blue info card and right cross-section illustration of capture, transport, well and storage with a caption beneath.
US$ 5.7 billion in R&D&I in BP 2027-31 (excluding infrastructure investment of ~US$ 700 MM); 23% of the total R&D&I budget in 2027 allocated to low carbon, reaching 40% by the end of the period. ~US$ 2.0 billion in Low Carbon (35%) versus 65% O&G, HSE and social impact. Outcomes: +1,500 active patents (annual filings 120 in 2021 to 184 in 2025), R$ 6.7 billion in new partnerships, +1,100 ongoing partnerships.
Left blue pills and a pie chart, centre grey card with a bar chart, right blue Petrobras Conexoes panel.
Technology programs act as structuring drivers focused on business challenges: new frontiers and reserves replenishment, operational efficiency of E&P assets, low carbon products and new energies, and decarbonization of operations, built on three pillars: environment, safety and digital.
Four circular program icons arranged above three horizontal pillar bars with upward arrows.
Carbon resilience: HISEP CO2 separator under testing, Sao Tome CCS pilot with storage scope of 100 thousand t/year of CO2, and a Rig Emissions Digital Twin delivering a reduction of 35 thousand ton CO2. Renewable sources and cleaner products: methane measurement technologies, SAF/HVO dedicated plant (FID approved, RPBC HEFA), SAF via coprocessing (REPLAN) and launch of CAP Pro R, the first asphalt with renewable content produced in Brazil.
Two blue-headed rounded cards, one with a HISEP image inset, each with bullet lists.
Operational efficiency and automation: ICARO reservoir software delivers gains of more than 3 kbpd in Jubarte and Tupi; hull cleaning robot up to 90% reduction in employee-hours exposed to risk. Asset integrity: insertable DHSV applications with estimated savings of US$ 700 MM in the coming years, plus robotics and drones, Riser Robotic AI and solutions for SCC-CO2.
Two blue-headed cards with bullet lists, a robotics photo inset on the right card.
New production frontiers (Equatorial Margin and Pelotas Basin): oil migration assessment using satellite imagery and geochemical markers. Complementary projects: AICD autonomous valves restrict water production by 30%, aiming to increase recovery factor by 3%, planned for Campos Basin. Decommissioning: Subsea Reel Drive patent and PWC-TT through-tubing abandonment solution.
Two upper cards and one wide decommissioning panel at the bottom with a reel-drive illustration.
An estimated 200,000+ tons of FPSO modules to be built in Brazilian shipyards through 2031 (actual since 2023 plus projected), and an estimated 21,000 tons with the construction of 8 RSVs. Other themes: local content, active listening with suppliers, and workforce qualification (Autonomy & Income Program, ANP training program).
Left blue-headed collaboration card with bullets, right three grey boxes on local content, shipyards and workforce.
Main procurement estimates: 2 FPSOs under procurement and 7 under study, ~1,000 km of well tubulars, ~7,000 km of rigid and flexible pipelines and umbilicals, ~200 integrated drilling contracts, ~300 WCTs, ~140 completion systems, 9 EPCIs and 16 EPRDs, rig fleet from 20 to 28, subsea support vessel fleet from 85 to 95, 17 refining/G&P/logistics projects and ~300 equipment items, and ~1,400 open innovation challenges.
Left dark-blue category box, right grid of light-blue tiles with big numbers.
Section divider titled 'Supplemental Material' with an employee walking on a light-green background. No numeric content.
Photograph left with a large lime-green diagonal shape carrying the white title.
Section divider titled 'Environmental, Social and Governance' with two employees on a cream background. No numeric content.
Photograph left, blue diagonal shape carrying the white title, Petrobras logo top right.
A circular E-S-G diagram around the statement to operate with integrity in a safe and sustainable way. Four commitments: reduce carbon footprint (Net Zero 2050 and Near Zero Methane 2030 ambitions), protect the environment (Zero Leak Ambition), take care of people (Zero Fatality Ambition) and act with integrity.
Left ring diagram with centered text, right stack of four icon-and-text items.
Commitments: 25% reduction in freshwater withdrawal by 2030 (113 million m3/year), 80% of solid waste directed to reduce, reuse and recycle pathways by 2030, and biodiversity gains by 2030 (positive balance in vegetated areas, +30% biodiversity conservation, R$ 1 billion in biodiversity R&D&I projects). Reference year 2021.
Left text list with icons, right aerial photo of a river through a forest.
Target: 25% reduction in freshwater withdrawal by 2030 to 113 MM m3/year (base year 2021, revised to include new segments). Freshwater use in 2025: withdrawal 113 (74%) and reuse 40 (26%). Withdrawn volumes in MM m3/year: 151 (2021), 122, 115, 112, 113 (2025), 127 (2026 projection) and 113 (2030). About 54 projects/initiatives could avoid ~44 million m3 of withdrawal.
Top target banner, three lower cards: usage bars, stacked column chart, and reuse initiatives.
Target: 80% of solid waste from operational processes directed to reuse, recycling and recovery (RRR) by 2030. Share of RRR by year: 68% (2021), 76%, 76%, 75%, 78% (2025), 80% in 2026 with a 78% present marker and 80% in 2030. Actions include coprocessing of oily sludge and expanded RRR pathways for construction, organic and FCC waste.
Top target banner, bottom-left bar chart, bottom-right list of actions with arrow bullets.
Targets for 2030: R$ 1 billion invested in biodiversity R&D&I (cumulative 2025-30), net positive balance in vegetated areas and more than +30% biodiversity conservation. The 2021 to 2030 table shows protection of endangered wildlife 56 to 73 species, restoration and conservation 175 to 228 thousand hectares, and protected areas management 25 to 33 million hectares.
Three target rows with arrows and teal result boxes, a comparison table below and a yellow circle with the headline on the right.
Voluntary targets include a minimum of 30% women in statutory body positions nominated in investees through 2030, a minimum of 20% self-identified Black individuals by 2028, sexual harassment investigations concluded within an average 60 days by 2030, 70% of relevant suppliers disclosing GHG inventories by 2028 and 100% of relevant suppliers trained in integrity. Law No. 15,177/2025 sets a 30% minimum of women on boards of state-owned enterprises.
Two text columns of bullet targets with a blue information box at lower right.
Targets: return to society of at least 150% of the amount invested in voluntary social and environmental projects by 2030; top three O&G companies in the human rights ranking by 2030; women in leadership 26% by 2027 and Black people in leadership 28% by 2030; 100% of Mind in Focus commitments by 2030; Workforce Nutrition Alliance pillars by 2031.
Left photo of two workers on a platform, right bullet list with nested sub-bullets.
The governance system ensures technical decisions, prevents undue interference and ensures approval of projects with a foreseeable economic return. Five elements: Board of Directors, Executive Board, specialized statutory committees, technical, legal and compliance support, and independent governance and compliance functions with a whistleblower hotline. Oversight by CVM and SEC, CGU, TCU, SEST and CADE.
Five columns with icons and colour bars at the centre, header checklist at the top and regulator list at the bottom.
Capital investment projects are approved for execution only when they show a positive NPV in all three scenarios. Stages: entry into the Plan's project portfolio, project development and implementation decision; projects exceeding US$1 billion require Board of Directors approval with an Investment Committee opinion, and energy transition projects have lower approval authority thresholds.
Left text sections with headings and a right three-tier funnel graphic with arrows.
Flow chart: assumptions set by finance, strategy, tax and technical areas feed the project team's feasibility study; quality assurance by technical and corporate areas, then advisory committees (decision support), then decision makers.
Left assumptions column, a connected flow of boxes across the centre and right, ending in a green decision-makers box.
Section divider titled 'Corporate' with two employees on a lime-green background. No numeric content.
Photograph left, large green diagonal shape carrying the white title, Petrobras logo top right.
Context: short-term price volatility and long-term energy transition; purpose: provide energy that ensures prosperity in an ethical, fair, safe and competitive way. The 2027-31 Business Plan has six pillars: value capture with a unique portfolio, record production trajectory, RTM monetizing reserves, gas, power and low carbon, engineering and innovation, and a more sustainable future, enabled by technology, processes and people.
Stacked bands: context and purpose on top, six green cards in the middle, three enabler cards with photos at the bottom.
Investment in digital technologies in BP 2027-31 is ~US$ 3.0 billion: Infrastructure 50%, Business 27% and Management 23% (the Business portion is included in segment Capex). Achievements include 2026 awards (Gartner Eye on Innovation, Forbes Best ICT in Brazil) and HPC reaching 300 Petaflops of capacity.
Left donut chart in a grey shape, right stack of five achievement rows with icons.
Strategic drivers for allocating corporate resources: business competitiveness (information technology as the foundation, with a wheel of value-creation outcomes), strategic use of data and AI (distributed innovation, governance and responsible use of AI, AI leadership) and scale and integration (infrastructure modernization and digital sovereignty, anticipation of threats, people and digital skills).
Three coloured column headers with stacked icon-and-label pills beneath, a value wheel at the lower left.
AGILIZA project delivers value through increased productivity, process redesign, adoption of new technologies and responsible use of AI. Four elements: process intelligence, data and AI, digital fluency and operational agility.
Central circular four-segment diagram labelled AGILIZA with descriptive text at four corners.
Petrobras is the highest-ranked Brazilian company and 2nd among industry Majors (Forbes, 2026), with 91% for 'Pride in working at Petrobras' in the 2025 Workplace Climate Survey. Talent strategy elements: onboarding and continuing education, reskilling, leadership development, new knowledge frontiers and digital fluency.
Left box with two ranking statistics, right icon grid of five talent themes and three green pills at the bottom.
Top targets: FCF, NPV, GHGPI and ECPI, plus SCPI, which does not impact variable compensation to avoid encouraging underreporting; specific targets are tied to each segment's strategic objectives. From General Manager to CEO, part of the variable compensation is deferred over 4 years according to stock performance; other employees receive the full amount in the following year.
Four panels left to right: top targets, specific targets, target weights bars, variable compensation, with footnotes below.
Closing slide repeating the cover: 'Business Plan Petrobras 2027-2031' with two employees in orange coveralls reviewing a clipboard on a green illustrated industrial background.
Left title text over a stylized green plant illustration, photo of two employees at right, Petrobras logo top right.
Common questions about this slide and the underlying presentation content.
It is the slide deck Petrobras published for its five-year business plan covering 2027 to 2031. It was filed with the SEC as an exhibit to Form 6-K on 24 November 2026 and has 184 slides covering strategy, market outlook, finances, operations by segment, climate commitments and supplemental ESG and corporate material.
The deck shows total capital expenditure of US$ 122 billion: US$ 87 billion in Exploration and Production, US$ 24 billion in Refining, Transportation and Marketing, US$ 8 billion in Gas and Low Carbon and US$ 3 billion in Corporate. US$ 113 billion is classed as under implementation and US$ 9 billion as under evaluation. Annual capex is shown as US$ 29.5, 28.3, 23.8, 22.3 and 17.8 billion for 2027 to 2031.
The slides show oil production of 2.9 million barrels per day in each year from 2027 to 2031 and total oil and gas production of 3.5 rising to 3.7 million boed, with 89% from the pre-salt. The Brent assumption is US$ 94 per barrel in 2026, US$ 74 in 2027 and US$ 70 for 2028-2031, with a robust scenario of US$ 50.
The financial strategy section shows a dividend formula of 45% of free cash flow, ordinary dividends of US$ 55-60 billion over the plan, operating cash flow of US$ 230-250 billion, a gross debt limit below US$ 75 billion converging to US$ 65 billion in 2029 and minimum cash of US$ 6 billion.
The deck lists a Scopes 1 and 2 emissions commitment of -18% by 2030 (64 MtCO2e versus 78 in 2015), US$ 4.8 billion for emission mitigation and US$ 13.5 billion, or 11% of plan investments, for the energy transition. The Low Carbon portfolio is US$ 5.3 billion, of which US$ 2.0 billion is under implementation and US$ 3.3 billion under evaluation.
After the title, disclaimer and agenda it runs through Introduction, Market Outlook, Financial Strategy, Exploration and Production, Main E&P Assets, Refining, Transportation and Marketing, Gas and Power, Low Carbon, Climate Change and Decarbonization, and Engineering, Technology and Innovation, followed by Supplemental Material on ESG and Corporate topics. It uses Petrobras' green, blue, yellow and lime palette with a different accent colour per section, bold italic headlines, photo dividers, waterfall and donut charts and KPI cards.
The slides are the rasterised images from the SEC filing, so there is no selectable text and some small footnotes are not legible at this resolution. The page-by-page descriptions only quote figures that can be clearly read. One section divider and a few diagram labels are in Portuguese.
Yes. Its section order, colour-coded dividers, capex waterfall, segment KPI cards and project pipeline slides are a practical reference for a multi-year business plan or capital markets day deck. The PDF can be downloaded from this page.
Create Your Own Slides
Turn your ideas into professional presentations in seconds with 2slides AI.
Reference professional designs, choose your style, and generate slides with perfect text rendering. Powered by Nano Banana—start creating your presentation now.
Your AI Agent for slides. Save time, shine faster with intelligent presentation creation.
All services online© 2026 2slides. All rights reserved.