2Slides Logo
Preview

Petrobras Business Plan 2027-2031

184 slides

Part of Investor presentation examples

This is the Petrobras Business Plan 2027-2031 presentation, the five-year strategic and investment plan of Petróleo Brasileiro S.A. (NYSE: PBR), filed with the SEC as an exhibit to Form 6-K on 24 November 2026. The 184-slide deck sets out total capital expenditure of US$ 122 billion for 2027-2031 (Exploration and Production US$ 87 billion, Refining, Transportation and Marketing US$ 24 billion, Gas and Low Carbon US$ 8 billion, Corporate US$ 3 billion), of which US$ 113 billion is under implementation and US$ 9 billion under evaluation. It covers the market outlook, financial strategy and dividends, E&P and main assets, refining, gas and power, low carbon, climate and decarbonization, engineering and technology, plus supplemental ESG and corporate material. Amounts are in US dollars unless a slide states Brazilian reais (R$).

10 likes
0 downloads

Uses this deck’s cover as a style reference for slides made from your own content. Or pick any page below to use its layout as the reference.

Quick Navigation

Tags

Petrobras
Petrobras business plan 2027-2031
Business plan presentation
Strategic plan
Investor presentation

Share the slides

Description

Main Topic

This is the Petrobras Business Plan 2027-2031 presentation, the five-year strategic and investment plan of Petróleo Brasileiro S.A. (NYSE: PBR), filed with the SEC as an exhibit to Form 6-K on 24 November 2026. The 184-slide deck sets out total capital expenditure of US$ 122 billion for 2027-2031 (Exploration and Production US$ 87 billion, Refining, Transportation and Marketing US$ 24 billion, Gas and Low Carbon US$ 8 billion, Corporate US$ 3 billion), of which US$ 113 billion is under implementation and US$ 9 billion under evaluation. It covers the market outlook, financial strategy and dividends, E&P and main assets, refining, gas and power, low carbon, climate and decarbonization, engineering and technology, plus supplemental ESG and corporate material. Amounts are in US dollars unless a slide states Brazilian reais (R$).

Key Benefits

  • •Complete five-year plan deck: capex by segment, production curve, financing and dividend framework in one file
  • •Section-by-section structure (market outlook, financial strategy, E&P, RTM, gas and power, low carbon, climate, engineering, ESG) that can be reused for a corporate strategy presentation
  • •Dense, well-designed data slides: waterfall charts, double-donut charts, KPI cards, project pipelines, maps and 3D field cutaways
  • •Every slide is described page by page, so specific topics such as Buzios, refining capacity or decarbonization targets are easy to locate

Target Audience

  • •Equity and credit analysts covering Petrobras and integrated oil companies
  • •Investors following Brazilian energy and pre-salt production
  • •Strategy, planning and investor relations teams preparing multi-year business plan presentations
  • •Energy consultants, researchers and students studying oil major capital allocation and energy transition plans

Use Cases

  • •Reference for Petrobras' 2027-2031 capex, production, dividend and debt targets
  • •Template for a strategic plan or capital markets day presentation with many business segments
  • •Benchmarking capital allocation, lifting cost and decarbonization commitments against other oil and gas companies
  • •Source material for teaching how a national oil company presents its long-term plan

Unique Value Propositions

  • •A very long corporate plan deck: 184 slides with a consistent visual system and colour-coded sections
  • •Combines financial strategy (dividend formula of 45% of free cash flow, gross debt limit below US$ 75 billion) with asset-level detail on the pre-salt fields
  • •Includes supplemental ESG and corporate slides that most earnings decks leave out

Slide Pages (184)

Detailed view of each slide page, including layout, key content and visual elements.

Page 1
title slide

Petrobras Business Plan 2027-2031

Content

Cover slide of the Petrobras Business Plan 2027-2031, shown over a stylised green industrial illustration with two Petrobras workers in orange overalls reviewing a clipboard.

Layout Structure

Full-bleed green background with large white title and yellow period tag on the left, photo of two workers on the right and the Petrobras logo top right.

Key Visual Elements

  • •Business Plan headline
  • •2027-2031 yellow tag
  • •Two workers in orange overalls
  • •Green industrial illustration
  • •Petrobras logo
Page 2
disclaimer

Disclaimer and Cautionary Statement

Content

Legal notice stating the materials are not investment advice, that non-IFRS measures are used, and that forward-looking statements carry risks and uncertainties. The cautionary statement says oil and gas resources and reserves data are not prepared under SEC Subpart 1200 guidelines and do not qualify as proved, probable or possible reserves under Rule 4-10(a) of Regulation S-X.

Layout Structure

Dense left text column of legal paragraphs beside a right-hand green heading and highlighted cautionary statement, with a green swoosh at the left edge.

Key Visual Elements

  • •Disclaimer heading
  • •Legal text paragraphs
  • •CAUTIONARY STATEMENT green call-out
  • •Green side swoosh
Page 3
agenda

Agenda

Content

The presentation is organised in nine parts: Introduction, Market Outlook, Financial Strategy, Exploration and Production, Refining, Transportation and Marketing, Gas and Low Carbon Energies, Climate Change and Decarbonization, Engineering, Technology and Innovation, plus Supplemental Information (ESG and Corporate).

Layout Structure

Photo of an FPSO and helicopter at sea on the left with a white angled panel on the right holding a numbered agenda list.

Key Visual Elements

  • •Yellow Agenda heading
  • •Numbered list of nine topics
  • •FPSO illustration at sea
  • •Helicopter
Page 4
section divider

Section 1: Introduction

Content

Section divider for the Introduction part, featuring a smiling Petrobras employee (credited as Wagner Felicio) in a blue suit.

Layout Structure

Full-bleed portrait photo on dark blue background with the section title in large yellow italic type on a lighter blue diagonal panel.

Key Visual Elements

  • •Introduction title
  • •Portrait of employee in blue suit
  • •Blue diagonal panels
  • •Petrobras logo
Page 5
vision and strategy infographic

Our Journey: Vision, Values and Purpose

Content

Petrobras says it is charting a just energy transition, advancing gradually and responsibly while keeping its relevance in Brazil's energy mix and expanding renewables. Vision: best diversified and integrated energy company in value generation; values: care for people, integrity, sustainability, innovation, commitment to Petrobras and Brazil; purpose: provide energy that ensures prosperity in an ethical, fair, safe and competitive manner.

Layout Structure

Concentric circles (Vision, Values, Purpose) on the left connected by lines to three grey text bars on the right.

Key Visual Elements

  • •Concentric green, blue and teal circles
  • •Connector lines
  • •Vision, values and purpose text bars
Page 6
vision and strategy infographic

The Petrobras of the Future: Key Choices

Content

Reaffirms five key choices: focus on oil and gas with economic and environmental resilience; replenishment of reserves and value creation; expansion of industrial facilities with more low carbon products; ambition of operational net zero emissions; and leadership in the just energy transition.

Layout Structure

Left half is a large worker portrait; right half is a list of five icon-led statements on a light grey panel.

Key Visual Elements

  • •Worker portrait
  • •Five green icons
  • •Bold key phrases in green
  • •Brazil map icon
Page 7
data visualization

Growth Sustains Relevance in Brazil's Energy Supply

Content

Brazil's energy supply is 14 exajoules in 2022, 16 in 2031 and 21 in 2050. Petrobras oil and gas share is 31% (4.3 EJ) in 2022, 27% (4.3 EJ) in 2031 and 22% (4.6 EJ) in 2050, with low carbon at 4% (0.7 EJ) in 2031 and 9% (1.9 EJ) in 2050; exports are 1.7 EJ, 2.6 EJ and 1.4 EJ respectively.

Layout Structure

Three donut charts of growing size (2022, 2031, 2050) in a row, with exports icons above each and notes and source at the bottom.

Key Visual Elements

  • •Three donut charts
  • •Green oil and gas slices
  • •Teal low carbon slices
  • •Export globe icons
  • •Source and notes footer
Page 8
KPI dashboard

Petrobras Growth Is Shared with Society (2027-2031)

Content

Investments have the potential to generate and sustain 325 thousand direct and indirect jobs and represent 5% of total investments in Brazil in the period. Activities will generate tax payments to federal, state and municipal governments of around R$ 1.6 trillion.

Layout Structure

Three icon-and-text statements on the left white area, with a large smiling-woman photo cropped in an angled shape on the right.

Key Visual Elements

  • •325 thousand jobs
  • •5% of Brazil investments
  • •R$ 1.6 trillion taxes
  • •Portrait photo
  • •Green icons
Page 9
section divider

Section 2: Market Outlook

Content

Section divider for the Market Outlook part, with two Petrobras employees (credited as Lucas Su and Patricia Silva) talking.

Layout Structure

Light blue photo background with two standing figures and a dark blue diagonal panel carrying the yellow title.

Key Visual Elements

  • •Market Outlook title
  • •Two employees in conversation
  • •Dark blue diagonal panel
  • •Petrobras logo
Page 10
data visualization

Projections Updated in 2026 Point to Higher Long-Term Oil Demand

Content

Long-term oil demand reaches about 100 MMbpd, and by 2050 the 2026 projection is 70 MMbpd versus 64 in the 2024 projection, within a forecaster range of 33 to 114. Exploration spending was US$ 29 billion at its peak (2012-2014), 12 pre-pandemic, 8.7 in 2020-2023, 9.4 in 2024, 9.1 in 2025, 9.3 in 2026 and is projected at 9.9 in 2027-2030.

Layout Structure

Left line chart of oil demand projections 2010-2050 with shaded forecaster range; right bar chart of exploration spending by period; small-print footnotes beneath.

Key Visual Elements

  • •Oil demand line chart
  • •Shaded forecaster range
  • •Exploration spending bars in US$ billion
  • •Spending peak and projection call-outs
  • •Source S&P Global Commodity Insights
Page 11
data visualization

Energy Transition Pace: Scenarios Point to a Slowdown

Content

CO2e emissions scenarios for 2050 from seven forecasters and Petrobras show wide dispersion across slow, moderate and accelerated transition. The current projection is 24 GtCO2 eq/year versus 16 in the 2024 projection; global emissions were 37 in 2022 and 38 GtCO2 eq/year in 2024.

Layout Structure

Dot-plot chart with one column per forecaster (Petrobras highlighted in a green frame), dashed average lines, a right-hand box with 2050 values and a legend below.

Key Visual Elements

  • •Colour-coded dots for slow, moderate, accelerated
  • •Seven forecaster columns plus Petrobras
  • •Dashed average lines
  • •2050 current vs 2024 projection boxes
Page 12
data visualization

The Energy Transition Materializes Through New Sources

Content

Global energy investment (US$ billion, real terms, base year 2024) rose from 2,702 in 2015 to an estimated 3,302 in 2025, of which 2,154 is low carbon (65%) and 1,148 fossil (35%), compared with 45% and 55% in 2015. Investment in renewables has stayed above traditional sources since 2016.

Layout Structure

Single stacked bar chart for 2015-2025 with green low-carbon and grey fossil segments, percentage labels on the left and right and a source note below.

Key Visual Elements

  • •Stacked bars 2015-2025E
  • •Total labels above bars
  • •Low carbon vs fossil percentages
  • •Source IEA
Page 13
data visualization

Energy Transition Respects Each Nation's Strengths

Content

Brazil's primary energy mix is 51% renewables in 2024 rising to 65% in 2050, versus 16% and 40% for the world. Oil products demand in Brazil: heavy-duty transport 1.7 EJ (2025), 2.3 (2040), 2.7 (2050); light-duty 2.3, 2.5 and 2.1 EJ, with biofuels rising to 43% of light-duty in 2050.

Layout Structure

Two-panel layout: left stacked bars of energy mix for Brazil and the world (2024, 2050); right stacked bars of oil products demand profile for heavy-duty and light-duty transport; legends and sources at the bottom.

Key Visual Elements

  • •Brazil and world flag icons
  • •Stacked energy mix bars
  • •Heavy-duty and light-duty demand bars
  • •Colour legends
  • •Source IEA, EPE, BEN
Page 14
data visualization

Brazil's Energy Sector Emits Less Greenhouse Gas Than the World Average

Content

Brazil accounts for 2.2% of the world's primary energy supply but only 0.7% of global emissions from this sector. Energy is 68% of world greenhouse gas emissions versus 25% in Brazil, where agriculture and livestock is 38%, land use 25% and industrial process and waste 12%.

Layout Structure

Headline text on the left and two side-by-side pie charts (world and Brazil) on the right, separated by a thin line.

Key Visual Elements

  • •Two pie charts
  • •World and Brazil flag icons
  • •Percentage labels by sector
  • •Source note
Page 15
data visualization

Brazil Combines a Clean Energy Mix with Lower-Carbon-Footprint Oil

Content

Greenhouse gas emissions per barrel produced in 2025 (kg CO2e per barrel): Brazil 20 and the United States 20, versus Russia 37, Canada 39, India 57 and China 63; Guyana is 5 and Saudi Arabia 9. The weighted average is 32.

Layout Structure

Ascending bar chart of many producing countries (CO2 in yellow, methane in teal) with flag call-outs for selected countries and a weighted-average badge on the right.

Key Visual Elements

  • •Ranked stacked bars by country
  • •Flag markers with values
  • •Weighted average 32 badge
  • •Source Rystad Energy
Page 16
map

Geopolitical Conflicts Shaped the External Environment in 2026

Content

The Hormuz crisis caused an unprecedented shock to energy systems, with around 200 assets affected by the conflict. The chart of oil supply disruptions in history shows the 2026 closure of Hormuz at about 2.8 (billion barrels), well above earlier events such as the Iranian Revolution.

Layout Structure

Left half is a Middle East map with red and yellow incident markers in an orange-framed box; right half is a green panel with a horizontal bar chart of historical disruptions.

Key Visual Elements

  • •Middle East map with major disruptions and minor incidents
  • •Horizontal bar chart of historical supply disruptions
  • •Month-by-month Hormuz bar (Mar to Oct)
  • •Iran inset
  • •Sources Rystad Energy and World Energy Outlook 2026
Page 17
data visualization

Volatile Price Environment: Brent Forecast BP 2027-31

Content

Brent actuals were US$ 81/bbl in 2024, 69 in 2025 and 94 in 2026; the BP 2027-31 path is 74 in 2027 and 70 from 2028 to 2031. Petrobras maintains a long-term price view of US$ 70/bbl with a robust scenario at US$ 50/bbl and says it will execute investments without relaxing capital discipline.

Layout Structure

Left white column with three icon-led bullets; right green panel with a Brent line chart comparing actual, BP 2027-31 and BP 2026-30.

Key Visual Elements

  • •Brent line chart 2024-2031
  • •Actual, BP 2027-31 and BP 2026-30 legend
  • •Data labels 94, 74, 70
  • •Three green icon bullets
  • •Source S&P Global Platts
Page 18
section divider

Section 3: Financial Strategy

Content

Section divider for the Financial Strategy part, featuring an employee credited as Jaqueline Teixeira in a green blouse.

Layout Structure

Green photo background with the employee on the left and a lime-green diagonal panel carrying the white title.

Key Visual Elements

  • •Financial Strategy title
  • •Employee portrait
  • •Lime and green panels
  • •Petrobras logo
Page 19
KPI dashboard

Our Priority Is Growth with Value Generation

Content

Compared with BP 2026-30: plus US$ 30 billion in operating cash flow and plus US$ 10 billion in dividends, with the dividend formula maintained at 45% x FCF. Debt: gross debt limit below US$ 75 billion, target US$ 65 billion, minimum cash US$ 6 billion and US$ 20-25 billion in cash to be allocated.

Layout Structure

Three columns (Investments, Dividends, Debt) each with a key-figure card above a green chevron band and a slogan at the bottom.

Key Visual Elements

  • •Three column cards
  • •US$ 30 billion in OCF
  • •US$ 10 billion in dividends
  • •Gross debt limit and target figures
  • •Green gradient chevrons
Page 20
table

More Investments, Higher Cash Generation and More Dividends (Total Capex US$ 122 billion)

Content

Sources of US$ 230-250 billion in operating cash flow plus net borrowings of 0-5 and earn-outs of 0-5, against uses of 100-110 in cash flow from investments, 55-60 ordinary dividends, 20-25 to be allocated, 50-55 leasings and 5-10 financial expenses. Assumed Brent is US$ 74 in 2027 and 70 thereafter; operating cash flow is 44, 45, 47, 47 and 47 across 2027-2031, and a US$ 10 Brent change moves OCF by about US$ 6 billion per year.

Layout Structure

Left stacked sources-and-uses bars; right three tables (assumptions, projections, sensitivities) with year columns 2027-2031.

Key Visual Elements

  • •Sources and uses stacked bars
  • •Assumptions table (Brent, FX, cracks)
  • •Projections table (OCF, cash capex, leasings)
  • •Sensitivities table
  • •Numbered footnotes
Page 21
data visualization

Greater Efficiency in Capex Execution Generates More Value

Content

Capex execution versus guidance was 81% in 2022, 79% in 2023, 90% in 2024, 110% in 2025 and 124% in 2026E, with 100% expected for 2027-31. Oil production is projected at 2.9 MMbpd every year from 2027 to 2031, with plus 430 MM barrels of oil between plans over 2027-2030.

Layout Structure

Three numbered panels left to right: capex execution bars, an illustrative risk-model line chart, and an oil production line chart comparing BP plans.

Key Visual Elements

  • •Capex execution bar chart
  • •Illustrative deterministic vs risk model lines
  • •Oil production line comparison BP 2026-30 vs BP 2027-31
  • •Numbered blue circles
Page 22
data visualization

Our Investment Portfolio Amounts to US$ 122 Billion

Content

Total portfolio of US$ 122 billion: E&P 87, RTM 24, Gas and Low Carbon 8, Corporate 3, with more than 70% concentrated in E&P. Under implementation is US$ 113 billion (83, 23, 4, 3) and under evaluation US$ 9 billion (3, 1, 4 for E&P, RTM and Gas and Low Carbon).

Layout Structure

Left bar cluster for total by segment with a green badge; right two bar clusters for under implementation and under evaluation with badges.

Key Visual Elements

  • •Colour-coded bars by segment
  • •Total, implementation and evaluation badges
  • •Segment legend
  • •Note on plus or minus 5% variation
Page 23
data visualization

Focused on Projects That Expand Cash Generation Capacity

Content

Annual totals for 2027-2031 are US$ 29.5, 28.3, 23.8, 22.3 and 17.8 billion (total US$ 122 billion), split into capital, current and inorganic investments. Cash capex is 24, 24, 20, 18 and 15 and organic cash capex 23, 23, 19, 17 and 14.

Layout Structure

Stacked bar chart by year with totals in green ovals, two horizontal rows of cash capex and organic cash capex beneath, and footnotes below.

Key Visual Elements

  • •Stacked bars (capital, current, inorganic)
  • •Total ovals
  • •Cash capex and organic cash capex rows
  • •Footnotes on inorganic items
Page 24
comparison

Flexible Portfolio for Greater Resilience

Content

Of the US$ 122 billion, 81% (US$ 99 billion) is base, 12% (US$ 14 billion) is target and 7% (US$ 9 billion) is under evaluation as opportunities. Main migrations from evaluation to implementation versus BP 2026-30 include Buzios 12, REVIT Barracuda and Caratinga, Mero Extension, Sirius, REPAR medium oil products HDT and MR2 vessels.

Layout Structure

Left pyramid of three tiers with descriptions to the right, plus a right-hand list of main migrations; footnote on NPV approval criteria.

Key Visual Elements

  • •Three-tier pyramid with percentages
  • •Under evaluation and under implementation bands
  • •Main migrations list
  • •Notes on positive NPV in three scenarios
Page 25
data visualization

Reduced Uncertainties Result in Higher Projected Investments

Content

Total investment bridge from BP 2026-30 at US$ 109 billion to BP 2027-31 at US$ 122 billion: period adjustment 0.4, inflation 4, FX 3 to a normalized 117, then current investments 4, schedule and portfolio adjustments -12, new projects 4 and improved project execution 9.

Layout Structure

Waterfall chart from left start bar to right end bar with step labels beneath and footnotes below.

Key Visual Elements

  • •Waterfall bars
  • •109, 117 and 122 totals
  • •ANP auctions US$ 1.9 billion call-out
  • •Footnote on Atapu and Mero auctions
Page 26
data visualization

Profitable Projects Matured and Migrated to Implementation

Content

Implementation investment bridge from US$ 91 billion in BP 2026-30 to US$ 113 billion in BP 2027-31, with steps including period adjustment -5, inflation 4, FX 2, current investments 4, schedule -2, new projects 3, projects migrated to implementation 13 and improved project execution 4.

Layout Structure

Waterfall chart with blue end bars and teal/yellow steps, labelled categories below and footnotes at the bottom.

Key Visual Elements

  • •Waterfall bars
  • •91, 92 and 113 totals
  • •ANP auctions US$ 1.9 billion call-out
  • •Footnotes
Page 27
table

E&P Remains the Main Investment Focus

Content

Implementation investment of US$ 113 billion is US$ 29.3, 27.4, 21.8, 19.6 and 15.1 billion across 2027-2031, with E&P at 21.2, 18.6, 16.4, 15.5 and 11.4 and more than 70% of the total. Cash capex is 24.2, 23.1, 18.0, 15.7 and 12.2, with sanctioned share of 88%, 79%, 64%, 51% and 46%.

Layout Structure

Annual bar chart on top with a table of segment values beneath and two coloured rows for cash capex and sanctioned percentage.

Key Visual Elements

  • •Annual bars 2027-2031
  • •Segment table (E&P, RTM, Gas and Low Carbon, Corporate)
  • •Cash capex row
  • •Sanctioned percentage row
Page 28
KPI dashboard

Capex Concentrated in 2027 and 2028 to Sustain Operational Performance

Content

Cash capex is US$ 24.2 billion in 2027 and US$ 23.1 billion in 2028. E&P covers FPSOs, wells and tie-ins (Buzios 8 to 12, Atapu 2, Sepia 2, Revit Albacora); RTM covers expansion and HEFA, with Boaventura, RNEST Train 2 and UFN-III start-up expected in 2029 and RPBC HEFA in 2030; for E&P plus 1 p.p. of efficiency is about plus 30 kbpd.

Layout Structure

Left stacked teal and lime boxes with annual cash capex; right three grey rounded boxes (E&P, RTM, current investments).

Key Visual Elements

  • •2027 and 2028 cash capex tags
  • •Three grey content boxes with icons
  • •Teal and lime geometric shapes
  • •Petrobras logo
Page 29
data visualization

Greater Project Execution Efficiency Raises 2027 Capex

Content

2027 implementation capex bridge from US$ 21.0 billion in BP 2026-30 to US$ 29.3 billion in BP 2027-31: inflation 1.0, FX 0.8, current investments 0.2, schedule -0.5, new projects 2.5, projects migrated 0.1 and improved project execution 4.2.

Layout Structure

Waterfall chart with blue end bars and teal/yellow steps and category labels beneath.

Key Visual Elements

  • •Waterfall bars
  • •21.0, 22.8 and 29.3 values
  • •ANP auctions US$ 1.9 billion call-out
  • •Footnotes
Page 30
data visualization

In 2028 We Also Migrated New Projects and Raised Current Capex

Content

2028 implementation capex bridge from US$ 20.5 billion in BP 2026-30 to US$ 27.4 billion in BP 2027-31: inflation 1.1, FX 0.6, current investments 1.7, schedule -0.5, new projects 0.7, projects migrated 1.3 and improved project execution 2.0.

Layout Structure

Waterfall chart with blue end bars, teal and yellow steps and category labels beneath.

Key Visual Elements

  • •Waterfall bars
  • •20.5, 22.2 and 27.4 values
  • •Footnote on complementary projects and exploration
Page 31
KPI dashboard

High-Return Projects

Content

Average nominal internal rate of return in US$ is 20% for Exploration and Production, 16% for Refining, Transportation and Marketing and above 12% for Gas and Low Carbon Energies. Rates are now disclosed in nominal terms with inflation of about 2% p.y.; for E&P only projects with first oil from 2027 onwards are considered.

Layout Structure

Three equal icon cards across the slide, each with a blue header and a large percentage figure, with a note at the bottom.

Key Visual Elements

  • •Three icon circles
  • •20%, 16%, over 12% figures
  • •Blue header tabs
  • •Methodology note
Page 32
data visualization

Flexible Capital Structure Without Compromising Debt Limits

Content

Gross debt is US$ 70 billion in 2025 and 2026E, 69 in 2027, 68 in 2028 and 65 in 2029-2031, below the US$ 75 billion limit and converging to US$ 65 billion in 2029; net debt falls from 61 in 2025 to 29 in 2031. Brent breakeven is US$ 80/bbl in 2027 and a US$ 53/bbl average in 2028-31.

Layout Structure

Stacked bars of leasings and financial debt with a net debt line overlay, a limit box on top, and two rows of leases-linked-to-FPSO percentages and Brent breakeven beneath.

Key Visual Elements

  • •Stacked debt bars 2025-2031
  • •Net debt yellow line
  • •Gross debt limit box
  • •% of leases linked to FPSOs row
  • •Brent breakeven row
Page 33
vision and strategy infographic

Our Financial Strategy: Solid Growth and Consistent Returns

Content

Summary flow of the financial strategy: investments lead to operating cash generation, which leads to benefits for society as a whole. No numbers are shown on this slide.

Layout Structure

Left three stacked rounded bars connected by chevrons, with a large aerial FPSO photo on the right.

Key Visual Elements

  • •Three plus-sign bars (teal, blue, green)
  • •Down chevrons
  • •Icon circles
  • •Aerial FPSO photo
Page 34
section divider

Section 4: Exploration and Production

Content

Section divider for the Exploration and Production part, featuring two employees credited as Giselly Carvalho and Roberto Rufino in orange overalls.

Layout Structure

Orange background with two workers on the left and a yellow diagonal panel carrying the white title.

Key Visual Elements

  • •Exploration & Production title
  • •Two workers in orange overalls
  • •Orange and yellow panels
  • •Petrobras logo
Page 35
vision and strategy infographic

E&P Value Generation Strategy

Content

Six pillars for E&P: fostering capital discipline and cost optimization; maximizing value with focus on profitable assets; delivering production safely with maximum asset longevity; replenishing reserves and exploring new frontiers in Brazil and abroad; contributing to increasing natural gas supply; and decarbonizing the portfolio.

Layout Structure

Central E&P ring with six icon circles and rounded text boxes arranged symmetrically left and right.

Key Visual Elements

  • •Central E&P hub
  • •Six coloured icon circles
  • •Six text boxes
  • •Connector dots
Page 36
data visualization

Production Growth Unprecedented in the Company's History

Content

Oil production (Petrobras work interest, variation of plus or minus 4%) rises about 26% between 2024 and 2026 and is projected at 2.9 million bpd each year from 2027 to 2031, versus 2.5 to 2.7 in BP 2026-30, an addition of 430 million barrels of oil between plans over 2027-2030. Actuals were 2.2 (2021), 2.1, 2.2, 2.2 and 2.4 (2025), with a 2026 outlook between 2.7 and 2.8.

Layout Structure

Single large line chart on a rounded grey panel with call-out boxes for the 26% increase and the 430 million barrels, and a legend at the bottom.

Key Visual Elements

  • •Actual and projected production line
  • •BP 26-30 vs BP 27-31 lines
  • •Shaded gap area
  • •430 million barrels call-out
  • •+26% teal box
Page 37
KPI dashboard

Three Pillars Key to a Strong, Safe and Sustainable Production Curve

Content

Reservoir management lowers the potential decline from about -10% p.y. to -3% p.y.; production efficiency index rises plus 4.7 p.p. from 1H24 to 1H26, a gain of plus 130 kbpd, with maintenance OPEX plus 33% and current CAPEX plus 77% (2024 vs Outlook 2026). Platform capacity: authorization to temporarily expand nameplate capacity by up to plus 282 kbpd, 11 FPSOs adapted, and 6 more planned units with an ambition of up to 260 kbpd.

Layout Structure

Three vertical rounded panels (reservoir management, production efficiency and integrity focus, platform capacity) with charts and big-number call-outs; small-print footnotes at the bottom.

Key Visual Elements

  • •Decline curve chart
  • •IEP bar comparison
  • •+282 kbpd badge
  • •x11 FPSOs badge
  • •Footnotes listing FPSOs
Page 38
KPI dashboard

EF100: Applied Innovation to Raise E&P Operational Efficiency

Content

EF100 is Petrobras' strategic E&P efficiency program integrating people, processes and technology, with 13 initiatives split into maintenance and reliability and operation. In 2025 the Production Efficiency Index increased 1.3 p.p., and Ativo360 and Subsea Integrity solutions were recognized at the ANP Technological Innovation Award.

Layout Structure

Left column with program logo and stacked blue boxes; right column with highlighted 2025 result and award photos, all on a blue palette.

Key Visual Elements

  • •PROGRAMA EF100 logo
  • •People, Processes, Technology tiles
  • •13 initiatives
  • •Increase of 1.3 p.p. banner
  • •Premio ANP photos
Page 39
data visualization

Production Gain Opportunities Mapped for the Coming Years

Content

BP 2027-31 oil production guidance of 2.9 MMbpd is shown with a risk tunnel and upside arrows. Opportunities not included in the guidance are reduced pre-salt uncertainties (BSW and GOR), capacity increase on not-yet-producing platforms, especially 3 new Buzios units in 2027 each with 225 kbpd design capacity, and anticipation of platform and well start-ups.

Layout Structure

Left area chart with a 2.9 MMbpd line and upward arrows; right rounded panel listing three opportunity bullets; abbreviation footnotes at the bottom.

Key Visual Elements

  • •Risk tunnel area chart
  • •Upward dotted arrows
  • •Barrel icon
  • •Opportunity bullets
Page 40
data visualization

We Sustain Robust Production in BP 2027-31

Content

Total oil and gas production is 3.5 million boed in 2027 and 3.7 in 2028-2031, oil and commercial gas 3.1 then 3.2, oil 2.9 each year, and operated production 5.1 then 5.2. The five-year average pre-salt share is 89% and the government share in operated production is 9%.

Layout Structure

Stacked bars by year with line overlays for totals and operated production above, and two chevron KPI bars for pre-salt and government share below.

Key Visual Elements

  • •Stacked bars (oil, commercial gas, non commercial gas)
  • •Two line series
  • •Operated production figures
  • •89% pre-salt and 9% government share KPIs
Page 41
data visualization

Volume Through 2050: Plus 25% vs BP 2025-29

Content

Production curve consistently above plan with a strengthened trajectory sustained for longer, resulting in plus 25% in total production volume by 2050 versus BP 2025-29. Total production (MM boed) shows 2025 actual of 3.0 and 2026 guidance of 3.3 to 3.4, with levers of reservoir management, new opportunities (complementary wells and Sepia 3) and advanced technologies.

Layout Structure

Large area chart of declining production to 2050 with call-outs at the top, a highlighted plus 25% box at the right and a legend strip at the bottom.

Key Visual Elements

  • •Production curves BP 2027-31 vs BP 2026-30 vs BP 2025-29
  • •STRENGTHENING call-out
  • •Plus 25% in total production banner
  • •Three lever bullets
Page 42
KPI dashboard

4D Seismic: Information Turned into Value

Content

Over the next 5 years US$ 3 billion will be invested to acquire 24k km2 of 4D seismic, with average net potential value of 250% versus the 4D seismic investment. The approach is see, decide, capture value, with data processed on in-house supercomputers (HPC).

Layout Structure

Illustrated subsea scene with three icon steps on the left and a block of big numbers on the right, ending with a yellow key message line.

Key Visual Elements

  • •Seismic vessel and FPSO illustration
  • •See, Decide, Capture Value icons
  • •US$ 3 billion and 24k km2 figures
  • •250% figure
  • •Subsea reservoir cross-section
Page 43
data visualization

Relevant Investments in E&P (BP 2027-31 Total Portfolio)

Content

Total E&P portfolio is US$ 86.5 billion: implementation 83.1 and evaluation 3.4 in the inner ring; pre-salt 51.3, post-salt 20.5, exploration 10.0 and others 4.7 in the outer ring.

Layout Structure

Centered double donut chart with total in the middle, a legend box beneath and decorative green panel on the right.

Key Visual Elements

  • •Double donut chart
  • •86.5 US$ billion centre label
  • •Pre-salt, post-salt, exploration, others legend
  • •Implementation vs evaluation inner ring
Page 44
data visualization

E&P Capex Under Implementation: BP 2026-30 vs BP 2027-31

Content

E&P capex under implementation moves from US$ 69.2 billion (BP 2026-30) to US$ 83.1 billion (BP 2027-31): inflation 2.7, FX 1.5, period adjustment -4.1, acquisition of new areas and exploratory wells 2.8, projects migrated to implementation 10.3, improved project execution 4.9 and project postponements -4.1. BP 2027-31 split shows pre-salt 50, post-salt 19, exploration 10 and others 5.

Layout Structure

Waterfall chart with stacked start and end bars (by area) and floating step bars, category labels and a legend below.

Key Visual Elements

  • •Waterfall bars
  • •Stacked start and end bars by area
  • •69.2, 69.3 and 83.1 circles
  • •ANP auctions call-out
  • •Footnotes
Page 45
KPI dashboard

Portfolio Has Economic Resilience in Challenging Price Environments

Content

Investments are approved only with positive NPV in 3 scenarios; the optimistic scenario delivers approximately 2x the value of the robust scenario. Brent breakeven of major E&P projects is US$ 39/bbl and average IRR of major E&P projects is 20%.

Layout Structure

Left three-bar NPV chart (robust, base, optimistic) with a 2x value tag; right two stacked blue KPI cards.

Key Visual Elements

  • •NPV bars by scenario
  • •approx. 2x value tag
  • •US$ 39/bbl card
  • •20% IRR card
  • •Footnotes
Page 46
KPI dashboard

Complementary Projects Essential to Production Growth

Content

Complementary projects expand, sustain or recover production from systems already in operation: about 100 offshore wells in BP 2027-31, about US$ 14 billion in capex, about 10% of average total production in 2027-2031 and about 28% average nominal IRR.

Layout Structure

Left blue panel with scope description and bullets; right grey panel with four icon-led KPI rows.

Key Visual Elements

  • •Subsea well illustration
  • •Four icon circles
  • •About 100 wells, US$ 14 billion, 10%, 28% KPIs
  • •Footnotes
Page 47
comparison

Lifting Cost in the First Quartile of Industry Benchmarks

Content

Lifting cost is about US$ 6 per boe from 2025 to 2031, and the total cost of produced oil (TCPO) averages US$ 31 per boe in 2027-31. A scatter plot against peers (ExxonMobil, Chevron, Shell, TotalEnergies, Equinor, BP) shows Petrobras with higher production change and lower cost-per-barrel change for 2024-2026.

Layout Structure

Left column with lifting cost and TCPO stacked bar boxes; right scatter plot with Petrobras and peers dots.

Key Visual Elements

  • •~6 US$/boe headline
  • •TCPO stacked bar (31)
  • •Scatter plot peers vs Petrobras
  • •Source Wood Mackenzie
Page 48
data visualization

E&P Committed to Decarbonizing Operations

Content

E&P greenhouse gas emissions intensity is 19.9 kg CO2e/boe in 2015, 14.8 in 2024 and 14.7 in 2025, with targets of 15.0 in 2030 and 2035 (a 25% reduction against 2015). Commitments include zero routine flaring by 2030, methane intensity of 0.20 tCH4 per thousand tHC by 2030, and Gold Standard OGMP 2.0.

Layout Structure

Left blue panel with the 15 kg CO2e/boe headline and bullets; right grey panel with a five-bar chart.

Key Visual Elements

  • •15 Kg CO2e/boe headline
  • •Bar chart 2015-Target 2035
  • •-25% bubble
  • •CO2 icon in lime circle
Page 49
comparison

Industry Leader in Organic Reserve Replacement at Low Costs

Content

Petrobras shows the lowest finding and development cost and highest 5-year organic reserve replacement among peers, with proven reserves of 12.1 billion boe in 2025 (SEC criteria), the highest in 10 years. Reserves/production is 12.5 years and reserves replacement ratio is 175%.

Layout Structure

Left scatter plot of cost versus organic replacement by peer group; right two stacked bar panels for R/P and RRR versus majors.

Key Visual Elements

  • •Scatter plot with Petrobras highlighted
  • •R/P bar chart (12.5 years)
  • •RRR bar chart (175%)
  • •Peer group legend
  • •Source S&P Global Energy
Page 50
map

Exploration for New Discoveries to Replace Reserves

Content

Exploration investment is US$ 10 billion (3.4 South and Southeast margins, 3.3 Equatorial Margin, 3.3 others), with 50 new wells between 2027-2031: 15 in the Equatorial Margin, 16 in the South and Southeast margins and 19 others. A map of South America and West Africa marks the basins involved.

Layout Structure

Left donut chart with well-count bullets; right dark-blue map of South America and West Africa with coloured basin markers.

Key Visual Elements

  • •Donut chart (10)
  • •50 new wells bullets
  • •Basin markers on map
  • •Offshore and onshore legend
Page 51
map

Morpho Discoveries Open a New Frontier in the Equatorial Margin

Content

Morpho (block FZA-M-59, WI PB 100%) expanded knowledge with the discovery of 3 hydrocarbon-bearing intervals and is the first well of a commitment to drill 8 wells in Amapa Deep Water. Mae de Ouro (block POT-M-762) in the Potiguar Basin is scheduled to start right after Morpho; 15 wells will be drilled in the Equatorial Margin.

Layout Structure

Map of the equatorial coast with two circled block insets and text boxes, and a white call-out at top right for the 15 wells.

Key Visual Elements

  • •Block FZA-M-59 and POT-M-762 insets
  • •Equatorial margin map
  • •15 WELLS call-out
  • •Highlighted discovery text
Page 52
map

We Will Drill 13 Exploratory Wells in the Southeast

Content

Six wells in Santos Basin, six in Campos Basin and one in ES Basin. Petrobras will evaluate the exploratory potential of Citrino, Jaspe, Sudoeste de Sagitario, 12 new 6th OPC blocks, Azurita and Itaimbezinha, and the commerciality of discoveries including Norte de Brava, Agua Marinha, Alto de Cabo Frio Central, Aram and Jupiter/Cruzeiro do Sul.

Layout Structure

Map of Santos and Campos basin blocks labelled by name with a white diagonal panel carrying two bullet paragraphs.

Key Visual Elements

  • •Block maps of Santos, Campos and ES basins
  • •Block name labels
  • •Two bullet paragraphs
  • •Footnote on Permanent Concession Offer
Page 53
map

Pelotas Basin: Offshore 3D Seismic Acquisition Campaign

Content

The Minimum Exploratory Program for blocks acquired in the 4th and 5th OPC will be fully met through new 3D seismic acquisition (completed in the southern area and ongoing in the northern area). In Jun/25 Petrobras started the regional Environmental Licensing process for well drilling covering the entire area of the 32 blocks.

Layout Structure

Left map of the North and South areas with numbered blocks outlined in yellow and cyan, and a white text panel at lower right.

Key Visual Elements

  • •Numbered block grid
  • •North Area and South Area outlines
  • •Rio Grande do Sul label
  • •Scale and compass
Page 54
map

Sustaining Production Assets in Mature Basins

Content

Petrobras will evaluate exploratory opportunities in San Telmo North Block, Bolivian Sub-Andean and Rio Neuquen Block (Neuquen Basin, Argentina), and exploratory upsides in production assets and blocks adjacent to installed infrastructure in Brazilian basins such as Sergipe-Alagoas, Camamu-Almada, Espirito Santo, Campos and Santos.

Layout Structure

South America map with lime basin markers and two text blocks on the left and right.

Key Visual Elements

  • •South America map
  • •Lime basin markers
  • •Onshore and maritime basins legend
  • •Two call-out text blocks
Page 55
map

Expanding Exploratory Activities on the West African Conjugate Margin

Content

Petrobras holds 14 blocks in 4 countries: operator in 8 blocks in Cote d'Ivoire, participation in 4 blocks in Sao Tome and Principe (operator in Block 3), 1 block in Namibia (2613) and 1 block in South Africa (DWOB), the latter two as non-operator.

Layout Structure

Left headline and 4 COUNTRIES / 14 BLOCKS stat with a globe icon; right a West Africa map with country labels and text lines.

Key Visual Elements

  • •West Africa map
  • •4 COUNTRIES 14 BLOCKS stat
  • •Country labels with dot markers
  • •Globe icon
Page 56
map

Strategic Approach to Replenish the Exploratory Portfolio

Content

Exploratory area grew 292% and total exploratory blocks 159% from 2023 to 2026. Blocks include 10 in FOZ and 7 in CE (Equatorial Margin), 16 in Campos, 32 in Pelotas, interest in the Cruzeiro do Sul block in Santos, 8 in Cote d'Ivoire, 4 in Sao Tome and Principe, block 2613 in Namibia and the DWOB block in South Africa.

Layout Structure

Atlantic-wide satellite map with circular zoom insets per region, colour-coded by acquisition year, and two KPI percentages at lower left.

Key Visual Elements

  • •Circular zoom insets
  • •Acquisition-year colour legend
  • •+292% exploratory area
  • •+159% total exploratory blocks
Page 57
vision and strategy infographic

Asset Management Drives Sustainable Increase in Portfolio Longevity

Content

Mature assets gain longevity by extending productive life through revitalization, complementary projects, exploratory upsides and recovery factor initiatives, then a destination strategy of reuse or decommission. Value generation levers are listed, with post-shutdown safety, shorter removal time and innovations for the destination phase.

Layout Structure

Blue central production decline chart with original versus extended shutdown markers, a destination panel on the right and a lever strip at the bottom.

Key Visual Elements

  • •Production decline curves (original vs extended)
  • •Life cycle extension arrow
  • •Reuse and Decommission icons
  • •Value generation levers strip
Page 58
comparison

Systems Reuse and Productive Life Extension

Content

Strategies that turn assets into new opportunities: P-31 life extended to 2030 in the mature Albacora field; P-35, berthed in Guanabara Bay after Marlim, is being evaluated for reuse; reuse of equipment (such as an LM2500+ turbine) from decommissioned units reduces cost and schedule.

Layout Structure

Three equal cards with coloured headers (blue, teal, green), each with a photo and a short caption.

Key Visual Elements

  • •P-31 FPSO photo
  • •P-35 in Guanabara Bay photo
  • •LM2500+ turbine photo
  • •Three coloured headers
Page 59
section divider

Section: Main Exploration and Production Assets

Content

Section divider titled Main Exploration & Production Assets, introducing the asset-by-asset slides that follow.

Layout Structure

Blue gradient background with white title text on the left and yellow angled shapes at the corners.

Key Visual Elements

  • •Title text
  • •Blue gradient
  • •Yellow angled shapes
  • •Petrobras logo
Page 60
KPI dashboard

Pre-Salt: The World's Most Important Deepwater Production Hub

Content

Total operated production is 4.46 MMboed and own production 2.96 MMboed in 3Q26, with 35 platforms (30 fully dedicated to pre-salt), plus 200 wells through 2031 and US$ 51.5 billion in investments for 2027-2031. Lifting cost is US$ 4.48 in 3Q26 and the Santos Basin pre-salt GHG index is about 10 kgCO2e/boe in 2026.

Layout Structure

Left map outline of the Santos and Campos basins; right white panel with six circular icons and KPI labels.

Key Visual Elements

  • •Basin outline map
  • •Six icon circles with KPIs
  • •4.46 MMboed and 2.96 MMboed
  • •US$ 51.5 billion investments
Page 61
KPI dashboard

Buzios: The World's Largest Deepwater Asset

Content

2026 records: oil production 1,291 kbpd (11/05/2026), gas export 14.1 MMm3/d (08/15/2026) and water injection 984 kbpd (10/22/2026). GHG index is 9.7 kgCO2e/boe (Jan-Sep/2026) and there are 75 wells in operation (36 producers, 39 injectors).

Layout Structure

Left 3D field block diagram on blue; right white panel with a vertical list of six icon-led KPIs.

Key Visual Elements

  • •3D field cutaway
  • •Record production figures
  • •Well count split
  • •2026 badge
Page 62
KPI dashboard

Buzios: Technical Capability That Turns Potential into Results

Content

Five FPSOs operating up to 141 kbpd above nameplate capacity, progress to 1 million barrels of water injected per day, efficiency increase of plus 5.2 p.p. (9M2026 vs 2024) and 4.3 million m3/d of gains from replacing gas treatment membranes. FPSO P-75 is back at 169 kbpd three years after its peak, after a dip to 120 kbpd.

Layout Structure

Top row of four icon KPI cards, followed by a P-75 example with an FPSO icon and a production curve chart on a wave graphic.

Key Visual Elements

  • •Four KPI cards
  • •P-75 FPSO icon
  • •P-75 production curve 2023-2026
  • •Wave background
Page 63
timeline

Buzios: Three Major Projects in 2027 and One More for 2032+

Content

Timeline from 2018-19 to 2032+: P-74 to P-77 (Buzios 1-4), FPBAR (2023), FPTAM and P-78 (2025), P-79 (May/26), P-80, P-82 and P-83 (Buzios 9, 10, 11 in 2027) and Buzios 12 in 2032+. There are 83 wells in 2027-31 (43 producers and 40 injectors), 18 of which are complementary wells including 4 RWI wells.

Layout Structure

Left 3D field block with FPSO icons by status; right table of units by year and a green banner of well counts at the bottom.

Key Visual Elements

  • •Field block with coloured FPSO icons
  • •Year-by-year unit table
  • •83 wells banner
  • •Status legend
Page 64
KPI dashboard

Mero: Capacity Increase Raises Production and Profitability

Content

2026 operational records include about 770 kbpd in Sep/26 (Brazil's 3rd largest production, with FPSO Pioneiro de Libra in scheduled stoppage) and a daily production record of 799 kbpd on 08/11/2026. GHG index is about 8.0 kgCO2e/boe with an associated gas utilization index of 99.8%; 47 wells are in operation (23 producers, 24 injectors).

Layout Structure

Left 3D field block diagram; right column of icon-led records and a well count at the bottom.

Key Visual Elements

  • •3D field cutaway
  • •Production records
  • •GHG index
  • •Wells in operation split
Page 65
KPI dashboard

Mero: Short and Medium-Term Outlook

Content

Mero highlights for 2027-31: peak production in 2027, 19 additional wells opened through 2031 (11 producers and 8 injectors), and the Mero Extension Project (FEL 2 under approval) supporting the development plan revision and the request to extend the Production Sharing Contract in 2027. Technology items are HISEP in the Mero 3 area and PRM Seismic.

Layout Structure

Left 3D field block; right two groups of icon-led bullets (highlights, pioneering and technological evolution) divided by vertical lines.

Key Visual Elements

  • •3D field cutaway
  • •Five icon bullets
  • •HISEP and PRM Seismic items
  • •Section sub-headings
Page 66
KPI dashboard

Tupi and Iracema: First Ultra-Deepwater Giants to Reach 4 Billion boe

Content

Current operated production is 1,122 kboed, with GHG index of 10.2 kgCO2e/boe and production efficiency in the industry's first quartile. For 2027-31, capex is US$ 6.7 billion, targeting a return to the 1 million bpd operated level in early 2026, an annual average of 1 million commercial boed by 2027, and an ambition of a 35% recovery factor.

Layout Structure

Left 3D field blocks; right list of icon KPIs split into current performance and 2027-31 highlights.

Key Visual Elements

  • •3D field cutaways
  • •1,122 kboed
  • •US$ 6.7 billion capex
  • •Tupi + Valor and Tupi Revit 1 items
Page 67
comparison

Santos Basin: Resilient Pre-Salt Assets

Content

Atapu 2 (P-84) in 2029 reaches 375 kbpd total field capacity (about 159 kboed, 7.8 kgCO2e/boe); Sepia 2 (P-85) in 2030 reaches 405 kbpd (about 180 kboed, 9.5 kgCO2e/boe); Itapu has operated since Dec/2022 (about 165 kboed, 6.1 kgCO2e/boe). A record of 2 million barrels of water injected per day was reached in Santos Basin in Oct/2026.

Layout Structure

Three equal columns for Atapu, Sepia and Itapu with field blocks and metric footers, plus a fourth record column with a medal icon.

Key Visual Elements

  • •Three field cutaways
  • •Blue info boxes
  • •Production and GHG index figures
  • •Record medal icon
Page 68
KPI dashboard

Sirius: A New Project Concept Meeting About Half of Colombia's Gas Demand

Content

Four gas discoveries announced (Sirius-1, Sirius-2, Copuazu-1 and Sandia-1) with a subsea-to-shore concept needing no offshore processing platform. The first phase has 4 producer wells and a 117 km pipeline to shore, with about 5.8 Tcf of gas in place.

Layout Structure

Left subsea concept illustration with three icon stats beneath; right text bullets and a Colombia map highlight.

Key Visual Elements

  • •Subsea-to-shore illustration
  • •4 producer wells
  • •117 km pipeline
  • •About 5.8 Tcf
  • •Colombia map
Page 69
KPI dashboard

Campos Basin Continues to Add Value After 5 Decades

Content

19 units in operation, with production 34% higher than 2024 and 10% higher than 2025, an 11% reduction in lifting cost (2Q26 vs 2025), 19% of Brazil's oil production in 1H26 and a 10 p.p. increase in operational efficiency (2026 vs 2024). There are 22 exploratory blocks, 13 of which were acquired in 2026.

Layout Structure

Left map of Campos Basin fields and blocks; right white column with six icon-led metrics.

Key Visual Elements

  • •Campos Basin map with producing fields
  • •Six icon metrics
  • •In production legend
  • •Field labels
Page 70
KPI dashboard

Campos Basin: New Units and Complementary Projects

Content

2 new units in 2027-31 with more than 10% production growth by the end of the period, and 4 new units under study; capex 2027-31 is US$ 16 billion, with 7 units receiving capex for productive life extension and plus 120 new wells. Lifting cost falls 14% in 2031 vs 2Q26.

Layout Structure

Left map highlighting new production units in yellow; right column with six icon-led metrics.

Key Visual Elements

  • •Campos map with new production units
  • •US$ 16 billion capex
  • •Plus 120 new wells
  • •14% lifting cost reduction
Page 71
comparison

Revitalization Projects Sustain Production and Cost Efficiency in Campos

Content

Marlim and Voador: 2 units in ramp-up, more than 70 new and relocated wells and more than 20% lifting cost reduction since start-up. Albacora: production start-up in 2031, more than 20 new and relocated wells and more than 70% lifting cost reduction vs 2023.

Layout Structure

Two before-and-after field comparisons with icon metrics on a grey band, and a production curve chart with a blue banner message below.

Key Visual Elements

  • •Before/after field blocks
  • •Decommissioned vs new platforms legend
  • •REVIT Marlim and Albacora production curve
  • •OTC Award badge
Page 72
comparison

Resumption of Onshore E&P Development Campaign

Content

Urucu has 40 years of sustainable production, a preserved concession area of 98%, 2026 flaring 8.3% lower than 2025 and plans 8 producer wells over the next 5 years. Bahia has 21 wells drilled and in operation with 13 more planned, 20% production increase vs 2025 and around 90 new producers and 28 injectors planned over 5 years.

Layout Structure

Brazil map in the centre with two rounded cards (Urucu on the left, Bahia on the right) each listing icon-led facts.

Key Visual Elements

  • •Brazil map with state highlights
  • •Urucu and Bahia photos
  • •Icon fact lists
  • •Dotted connector arrows
Page 73
section divider

Section 5: Refining, Transportation and Marketing

Content

Section divider for the Refining, Transportation and Marketing part, with three employees credited as Philippe Pecanha, Sabrina Alves and Eliel Bomfim in orange overalls.

Layout Structure

Orange background with three standing workers on the left and a yellow diagonal panel carrying the white title.

Key Visual Elements

  • •Section title
  • •Three workers in orange overalls
  • •Orange and yellow panels
  • •Petrobras logo
Page 74
comparison

Monetizing Oil Reserves and Securing the Market for the Future

Content

Five RTM focus areas: High-Quality Products (self-sufficiency in diesel capacity), Resilient Refining System (ambition of first quartile in OA and IES indicators), Biorefining (SAF, SBC and HVO production), Competitive Logistics (expand ships, pipelines and storage) and Fertilizers and Petrochemicals (monetize natural gas).

Layout Structure

Five vertical columns each with a blue header, a mid-blue description block and a white target box.

Key Visual Elements

  • •Five column headers
  • •Three-tier cards per column
  • •Abbreviations footnote
Page 75
table

Our Current Refining System

Content

Installed crude oil processing capacity (distillation feedstock) is 1,813 kbpd across refineries: Recap 57, Revap 252, RPBC 170, Replan 434, Reduc 239, Regap 157, Rnest 88, Lubnor 8, Repar 208 and Refap 201 kbpd.

Layout Structure

Left map of Brazil with refinery icons in highlighted states; right colour-coded table by state and refinery with capacity.

Key Visual Elements

  • •Brazil map with refinery pins
  • •Refinery capacity table
  • •1,813 kbpd total
  • •Colour-coded regions
Page 76
data visualization

Our Refining System in 2031

Content

Processing capacity grows from 1,813 kbpd in 2024 to 2,173 kbpd in 2031: plus 67 kbpd in 2025-26, plus 212 kbpd in 2027-31, plus 81 kbpd under evaluation (40 of which are included in BP 2027-31). Totals are Rnest plus 212 kbpd and refinery revamps plus 148 kbpd, or plus 360 kbpd over 2025-2031.

Layout Structure

Bridge-style bar chart across time from 2024 to 2031 with a blue panel at lower right summarising the totals.

Key Visual Elements

  • •Waterfall bars 1,813 to 2,173
  • •Project list for 2025-26
  • •Under evaluation split 41 and 40
  • •Blue summary panel (+360 kbpd)
Page 77
table

Advancing Along the Path to Maximizing Our Refining Capacity

Content

Increases in installed capacity by refinery: 2025/2026 Revap plus 19, RPBC plus 6 and Rnest plus 42 kbpd; 2027-31 RPBC plus 25, Replan plus 25, Reduc plus 24, Regap plus 25, Rnest plus 170, Repar plus 12 and Refap plus 12 kbpd. 2027-31 total is plus 293 kbpd, bringing processing capacity in 2031 to 2,173 kbpd.

Layout Structure

Left colour-coded table by state and refinery with two period columns; right blue panel with barrel icons and total capacity.

Key Visual Elements

  • •Capacity increase table
  • •Seven barrel icons
  • •2027-31 plus 293 kbpd
  • •2,173 kbpd 2031 total
Page 78
timeline

Addition of 293 kbpd in Processing Capacity Over 2027-2031

Content

Distillation feedstock project start-up schedule from 2025/2026 to 2031: completed Rnest Train 1 plus SNOx (plus 42), RPBC UV (plus 6) and Revap U-210 (plus 19); upcoming Rnest UDA U-12 (plus 50), Rnest Train 2 (plus 80), Replan U-200A (plus 25) and others, with Rnest Trains 1 and 2 revamp (plus 40) included in BP 2027-31 for 2031. Several projects are marked as under evaluation.

Layout Structure

Horizontal timeline arrow with project boxes above and below the line, check marks for completed projects and lime dots for under evaluation.

Key Visual Elements

  • •Timeline arrow
  • •Project boxes with kbpd values
  • •Completed check marks
  • •Under evaluation legend
Page 79
data visualization

Pursuing Self-Sufficiency in Diesel Production Capacity

Content

Diesel market share in 9M26: Petrobras production 59%, other players production 8%, Petrobras imports 6%, other players imports 13% and biodiesel 14%. Diesel capacity additions are plus 112 kbpd in 2025/2026 and plus 293 kbpd of S10 diesel in 2027-31, for a total of plus 405 kbpd by 2031.

Layout Structure

Left pie chart of diesel market share, right demand-versus-capacity bar graphic, and a bottom blue chevron bar with additions by period.

Key Visual Elements

  • •Market share pie chart
  • •2031 demand vs production capacity bars
  • •Additional capacity chevron bar
  • •Source ANP
Page 80
table

Increase in S10 Diesel Production

Content

Plus 293 kbpd of S10 diesel in 2027-31, of which 139 kbpd is quality improvement and 154 kbpd additional volume, led by Rnest (plus 108), Boaventura (plus 76) and Refap (plus 31). Additional diesel volume is estimated to generate EBITDA of US$ 1.1 billion per year.

Layout Structure

Left table by refinery with three columns (S10 diesel, quality improvement, additional volume) and a green EBITDA call-out on the right.

Key Visual Elements

  • •Refinery table
  • •Total row (293, 139, 154)
  • •US$ 1.1 billion per year call-out
  • •Footnotes on assumptions
Page 81
timeline

Diesel S10: Project Start-Up Schedule

Content

Timeline of S10 diesel projects: completed items in 2025/2026 include Rnest distillation revamp (plus 6), Replan new HDT (plus 63), RPBC (plus 2) and Revap HDT (plus 41); later items include Rnest Train 2 (plus 88), Boaventura HCC/HDT (plus 56 and plus 20), Repar new HDT (plus 23) and Refap new HDT (plus 27). Icons distinguish additional volume, exchange of S500 for S10 and under evaluation.

Layout Structure

Horizontal timeline with project boxes above and below the line and a legend at the lower left.

Key Visual Elements

  • •Timeline arrow
  • •Project boxes with kbpd values
  • •Legend icons
  • •Completed check marks
Page 82
comparison

Rnest and Boaventura

Content

Rnest adds Train I plus SNOx (plus 42 kbpd), ADU U-12 (plus 50), Train II (plus 80) and Revamp Trains I and II (plus 40) of processing capacity, with S10 diesel of plus 6, plus 88 and plus 20; Capex BP 2027-31 is US$ 1.7 billion. Boaventura Refining (start-up 2029) adds plus 76 kbpd of S10 diesel, plus 20 of jet fuel and plus 12 of Group II lubricants; Capex BP 2027-31 is US$ 2.9 billion.

Layout Structure

Two large rounded panels (Rnest in blue, Boaventura in green) with milestone chevrons and metric rows, capex banners at the bottom.

Key Visual Elements

  • •Rnest phase chevrons
  • •Processing capacity and S10 diesel rows
  • •Boaventura timeline 2025-2029
  • •Capex banners
Page 83
KPI dashboard

RefTOP: Focus on Energy Efficiency and Carbon Reduction

Content

2030 ambition covers energy performance (IES at or below 86), sustainability (emissions intensity IGEE at or below 35 kgCO2eq/CWT), value (ability to process 100% of pre-salt crude oils, achieved in April 2026) and reliability via ProCONF. Cumulative gains are a 3,394 million m3 reduction in NG consumption and 5,959 thousand ton CO2eq of avoided emissions; new investments are US$ 1.3 billion over five years for more than 70 projects.

Layout Structure

Central blue panel with four ambition quadrants, a right teal panel of cumulative gains and a green panel of new investments at the lower right.

Key Visual Elements

  • •Four ambition quadrants
  • •Cumulative gains panel
  • •New investments call-out
  • •Footnotes
Page 84
KPI dashboard

Refining Reliability

Content

ProCONF targets operational availability of at least 97% by 2030, with 95.9% in 2023, 96.4% in 2026 and 97.2% in 2031. Scheduled stoppage investments are US$ 1.8 billion in 2027-28 and US$ 3.5 billion in BP 2027-31; utilization factor was 95%, 101% and 99% in 1Q26-3Q26, and each 1% increase in FUT in 2026 adds 19 kbpd of refined product output and US$ 100 million in revenue.

Layout Structure

Two top panels (ProCONF line chart and scheduled stoppage investments) and a teal band with quarterly FUT bars and a KPI box.

Key Visual Elements

  • •Operational availability line
  • •Investments 2027-28 and BP 2027-31
  • •Quarterly utilization bars
  • •Each 1% FUT call-out
Page 85
comparison

Scheduled Maintenance Stoppages Sustain Reliability

Content

Four drivers of higher scheduled stoppage capex: postponement of stoppages from 2026 to 2027, higher utilization factor, more complex stoppages and new equipment in the multi-year plan. Scheduled stoppages in 2027 involve REPLAN (4,500 workers), RPBC (3,150), REGAP (3,100), RECAP (4,550), REDUC (3,200) and REVAP (300).

Layout Structure

Left numbered list of four drivers in a rounded panel; right green panel with a grid of refinery names, scopes and worker counts.

Key Visual Elements

  • •Four numbered drivers
  • •Refinery scope grid with worker numbers
  • •Abbreviation footnote
Page 86
data visualization

Refining Is the Most Profitable Option for Petrobras Oil

Content

EBITDA per barrel of oil rises 20% in refining from 2027 to 2031, with refining shown as 6x sales in 2027 and 12x in 2031. The share of Petrobras crude oil destined to refining goes from 55% in 2027 to 58% in 2031, while sales falls from 45% to 42%.

Layout Structure

Left paired bar chart of refining versus sales EBITDA per barrel, centre line chart of crude destination, and an aerial Rnest photo on the right.

Key Visual Elements

  • •EBITDA per barrel bars
  • •+20% tag and 6x / 12x arrows
  • •Crude destination two-line chart
  • •Rnest aerial photo
Page 87
comparison

Refining Innovations

Content

Four digital innovations: GIRO (digitalization of operational routines, recognized by Gartner Eye on Innovation Awards in the Americas), OTS (operational training simulator), TRACKPLAN (digital planning for Refining plus Logistics) and Blending Online (real-time optimization of intermediate stream blending to reduce giveaway and increase diesel production).

Layout Structure

Four equal columns with title, subtitle, icon illustration and description, with a blue band and giveaway definition at the bottom.

Key Visual Elements

  • •Four icon illustrations
  • •Column titles GIRO, OTS, TRACKPLAN, BLENDING ONLINE
  • •Giveaway footnote
Page 88
comparison

Biorefining: Integrating the Industrial Complex with Demand for Renewables

Content

Diesel R is already produced by coprocessing, with Diesel R5 marketed since September 2023. SAF with international CORSIA certification has been produced at REDUC since 2025; dedicated plants are RPBC HEFA (15 kbpd, 2030, construction started), Boaventura HEFA (19 kbpd, 2032+, under evaluation) and Replan ATJ (10 kbpd, 2032+, under evaluation), plus a Riograndense partnership (15 kbpd).

Layout Structure

Left blue Diesel R card, central green sustainable aviation fuel card and a right-hand award photo with highlighted text; footnotes at lower left.

Key Visual Elements

  • •Diesel R card
  • •SAF coprocessing and dedicated plants list
  • •CORSIA award trophy photo
  • •Footnote definitions
Page 89
comparison

Expansion of Logistics Infrastructure and Petrobras Presence in Markets

Content

Three investment areas: fleet expansion (ships and vessels) at US$ 2.1 billion (including US$ 0.6 billion target for acquisition of MR2 and Handy-1 vessels), expanding presence at Brazil's growth frontiers (Midwest, Northern Arc and MATOPIBA) at US$ 1.4 billion, and expanding and maintaining logistics infrastructure at US$ 3.5 billion.

Layout Structure

Three equal rounded cards (blue, green, teal) with icon headers, descriptions and an investment figure at the bottom.

Key Visual Elements

  • •Three icon headers
  • •US$ 2.1, 1.4 and 3.5 billion figures
  • •Footnotes explaining corridors
Page 90
KPI dashboard

Mar Aberto: Logistics Investments and Brazilian Shipbuilding

Content

Construction of 21 cabotage vessels (8 gas carriers, 4 Handy 2, 4 MR1, 4 MR2, 1 Handy 1) and 18 barges, for US$ 2.1 billion in investment. Chartering of 30 new support vessels (12 PSVs, 10 OSRVs and 8 RSVs) has an estimated third-party construction cost of about US$ 2.7 billion.

Layout Structure

Left shipyard photo and text list of vessel types with delivery notes; right blue panel with the chartering list and cost.

Key Visual Elements

  • •Keel-laying ceremony photo
  • •Vessel type list
  • •Support vessels list
  • •US$ 2.1 billion and US$ 2.7 billion figures
Page 91
map

Investing in a Multimodal Logistics Network to Expand Presence at Brazil's Growth Frontiers

Content

Expanded presence in Brazil's Midwest and MATOPIBA through commercial initiatives and efficient logistics, more synergies in the Northern Arc, and lower logistics costs and carbon footprint. Projects: new REPLAN-Midwest pipeline, OSBRA pipeline capacity expansion, higher rail volumes via REPLAN, and a new multimodal terminal in Itaqui, Maranhao.

Layout Structure

Left Brazil map with numbered route markers; right green summary box above a list of four project categories with bullets.

Key Visual Elements

  • •Brazil map with numbered routes
  • •Northern Arc, Midwest and MATOPIBA labels
  • •REPLAN and RNEST pins
  • •Four coloured project tags
Page 92
comparison

Expansion and Maintenance of Logistics Infrastructure: Major Projects

Content

Santos Waterway Terminal commitments include a new pier with 3 berths, 10 new tanks (total of 150 thousand m3) and new truck loading stations. The New OBAPI Pipeline is a 130 km pipeline for heavy distillates connecting the Barueri and Cubatao terminals in SP, with new tanks at Cubatao; its map legend appears to show 137 km for OBAPI.

Layout Structure

Two side-by-side cards (Santos Waterway Terminal, New OBAPI Pipeline) with bullets, relevance lists, a terminal photo at left and a satellite pipeline map at lower right.

Key Visual Elements

  • •Terminal photo
  • •Bullet lists of commitments and relevance
  • •Pipeline route map with legend
  • •Blue card headers
Page 93
map

Logum: higher presence in the ethanol market with integrated logistics

Content

Signing for the acquisition of the remaining 70% equity interest in Logum on 11/11/2026. Logum sits on Brazil's main ethanol logistics corridor linking production hubs to the Sao Paulo metropolitan area and the Ilha D'Agua port terminal, with operational synergies with the Petrobras system. Completion is subject to conditions precedent including CADE approval.

Layout Structure

Left column of two bullet blocks with icon, right-hand map of SP/MG/RJ with Logum pipelines, Petrobras subcontracted pipelines and ethanol-flow arrows, footnote at bottom.

Key Visual Elements

  • •Map of Sao Paulo, Minas Gerais and Rio de Janeiro with pipeline routes
  • •Legend: Logum, Petrobras subcontracted pipelines, ethanol flow
  • •Truck and tanker icons
  • •Competitive Logistics section tag
Page 94
KPI dashboard

Fertilizers: generating profitability through integration with the oil and gas chain

Content

Total Capex BP 2027-31 is US$ 1.5 billion. Coverage of domestic urea demand rises from 20% in 2027 (FAFEN-BA, FAFEN-SE and ANSA) to 35% in 2029 with UFN-III. Context: 100% of urea used in Brazil in 2025 was imported (NPK fertilizers: 92%), about 1/3 of traded urea passes through the Strait of Hormuz, and international urea prices rose 35% in two weeks (Mar/2026).

Layout Structure

Left panel with a blue 'Context' card of three themes; right grey panel with a two-bar chart above a bulleted list of Petrobras opportunities.

Key Visual Elements

  • •Two teal bars: 20% (2027) and 35% (2029)
  • •Context card: Imports, Geopolitics, Volatility
  • •Petrobras Opportunities bullet list
Page 95
map

Resumption of existing units

Content

FAFEN-SE (urea 1,800 t/d, ~7% of domestic demand), FAFEN-BA (1,300 t/d, ~5%) and ANSA-PR (1,970 t/d, ~8%) are back in operation. Since January 2026 FAFEN-BA and FAFEN-SE sold 500 thousand t of urea and 135 thousand t of ammonia, a 12% average share of the domestic urea market. Capex under implementation is US$ 0.5 billion.

Layout Structure

Brazil map with three unit markers on the left, central blue 'Sales levels' card, right grey column on Capex and sustainability.

Key Visual Elements

  • •Map of Brazil with FAFEN-SE, FAFEN-BA and ANSA-PR markers
  • •Sales levels card: urea, ammonia, 12% share
  • •US$ 0.5 billion Capex callout
  • •Sustainability note on ARLA 32
Page 96
timeline

UFN-III: start-up in 2029

Content

Schedule and budget unchanged since project approval, with start of commercial operation in 2029. Construction in numbers: ~US$ 1 billion Capex to completion, 3,600 t/d of urea plus 2,200 t/d of ammonia (177 t/d available for sale) and ~8 thousand jobs during construction. UFN-III in Tres Lagoas (MS) increases domestic urea demand coverage by ~15%.

Layout Structure

Horizontal four-milestone timeline on top, blue 'Construction in numbers' panel with three columns below, green callout on a grey right sidebar.

Key Visual Elements

  • •Timeline: Nov/2025, Jun/2026, Jul/2026, 2029
  • •Construction in numbers: Capex, Capacity, Impact
  • •Brazil icon with ~15% coverage statement
Page 97
comparison

Petrochemicals: operations integrated with our industrial facilities

Content

Petrochemicals are presented as a way to keep capturing value across Petrobras' chain amid declining fuel demand. Boaventura integration includes a US$ 0.1 billion logistics integration project with existing petrochemical assets; refining integration targets higher supply of propylene and other feedstocks.

Layout Structure

Two-column text slide, business drivers on the left and integration opportunities (Boaventura, Refining) on the right, over a blue and yellow corner graphic.

Key Visual Elements

  • •Business Drivers bullet list
  • •Integration opportunities: Boaventura and Refining
  • •Abbreviation footnote (RLH, LPG)
  • •Signpost and facility icons
Page 98
KPI dashboard

RTM expected average potential EBITDA of ~US$ 9 billion per year

Content

With investments under BP 2027-31 and a diesel crack spread of around US$20/bbl, Petrobras expects average potential EBITDA for the RTM segment of ~US$ 9 billion per year. Levers listed: reliability, quality, processing capacity and production of high value-added products. Crack spread refers to the U.S. Gulf Coast.

Layout Structure

Full-bleed refinery night photo on the left, white diagonal panel with four plus-icon bullets and a blue-and-grey EBITDA callout on the right.

Key Visual Elements

  • •Illuminated refinery photograph
  • •Four yellow plus-icon levers
  • •Blue callout box with ~US$ 9 billion per year
  • •Footnote on crack spread
Page 99
data visualization

Investments in a competitive, efficient and integrated refining and logistics complex

Content

BP 2027-31 total RTM portfolio is US$ 23.6 billion, of which 22.6 in implementation and 1.0 in evaluation. By segment: Refining 15.0, Marketing and Logistics 7.0, Fertilizers 1.5 and Petrochemicals 0.1 (US$ billion). Projections are subject to +/-5% variation.

Layout Structure

Centered double donut chart with total in the middle and a legend strip underneath, green corner shape on the right.

Key Visual Elements

  • •Double donut: outer by segment, inner by phase
  • •Centre figure 23.6 US$ billion
  • •Legend: Evaluation, Implementation, Refining, Fertilizers, Petrochemicals, Marketing and Logistics
Page 100
data visualization

RTM Capex Under Implementation

Content

Waterfall from BP 2026-30 (15.8) through inflation +1.0, FX +0.5 and period adjustment -0.7 to a normalized 16.6, then resilient refining portfolio +2.3, capital project reviews +1.4, competitive logistics +1.1, fertilizers and petrochemicals +0.6 and improved project execution +0.6, reaching 22.6 in BP 2027-31 (US$ billion). The final bar splits into Refining 14.1, C&L 6.8, Fertilizers 1.5 and Petrochemicals 0.1.

Layout Structure

Full-width waterfall chart with grey total circles, teal increments, one orange decrement and rounded call-out boxes describing the drivers.

Key Visual Elements

  • •Waterfall bars BP 2026-30 to BP 2027-31
  • •Stacked first and last columns by segment
  • •Grey circles 15.8, 16.6 and 22.6
  • •Driver call-outs (scheduled shutdowns, bio-refining, MR2 vessels, ethane pipeline)
Page 101
section divider

Gas e Energias de Baixo Carbono (section divider)

Content

Section divider titled in Portuguese, 'Gas e Energias de Baixo Carbono' (Gas and Low Carbon Energies), over a photo of three Petrobras employees in orange coveralls. No numeric content.

Layout Structure

Full-bleed photograph on a yellow and orange background with large white title text at lower right and Petrobras logo top right.

Key Visual Elements

  • •Three employees with names captioned
  • •Orange and yellow geometric shapes
  • •Large white italic title
  • •Petrobras logo
Page 102
section divider

Value proposition: Gas & Power

Content

Value proposition for Gas & Power: act in a competitive and integrated way in the operation and commercialization of gas and energy, optimizing the portfolio and promoting the inclusion of renewable sources.

Layout Structure

Pipeline photo on the left with a large blue diagonal panel carrying a single statement on the right.

Key Visual Elements

  • •Photograph of gas pipelines at dusk
  • •Blue diagonal panel with white text
  • •Orange left-edge shape
  • •Heading 'Value proposition / Gas & Power'
Page 103
map

Robust portfolio of certified, contracted thermal power plants integrated into Brazil's National Interconnected System

Content

Natural gas: +19% domestic gas (own production, 9M25 vs. 9M26), +100 MMm3/day processing capacity, 40 MM m3/day in two regasification terminals, 99.99% supply reliability and over 30 years of experience. Energy: 6th largest power generation player with 13 thermal plants and 4.6 GW of capacity; nine previously uncontracted assets were recontracted in the 2026 LRCAP; new plants planned in the Boaventura Energy Complex (800MW).

Layout Structure

Left blue panel with a Brazil map and legend, right side two rounded cards (Natural Gas in lime, Energy in green) with bullet lists.

Key Visual Elements

  • •Brazil map with thermal plants, gas processing units, regasification terminals and gas network
  • •Legend
  • •Natural Gas card
  • •Energy card
Page 104
map

Success in the 2026 LRCAP

Content

Thermal power portfolio recontracted for up to 10 years, securing R$ 4.3 billion in annual revenue. Contracted capacity went from 2.0 GW before to 4.6 GW now, with ~R$ 65 billion total fixed revenue from the portfolio; thermal plants can consume up to ~16.6 MM m3/day of gas when dispatched. Strategic implications: cash flow predictability, energy security and flexible gas demand.

Layout Structure

Left text column with Key Figures and Strategic Implications, right Brazil map highlighting contracted states in blue with plant names.

Key Visual Elements

  • •Key Figures block: 2.0 GW to 4.6 GW
  • •Brazil map with plant labels (Termoceara, Vale do Acu, Termobahia, Juiz de Fora and others)
  • •Green wedge on the right
  • •Footnotes on LRCAP and CMSE
Page 105
comparison

Dynamic performance in synergy with clients

Content

Goal: be the #1 choice in the market. Structural actions include more domestic gas from own production, new commercial products, customer-base mapping and a new relationship channel. Results: all distributors in the integrated network supplied, free-market sales growth of around 70% (9M26 vs. 9M25) and a doubled customer base.

Layout Structure

Two-column text slide, 'Structural Actions' pill on the left and 'Results' pill on the right, grey right background.

Key Visual Elements

  • •Green 'Structural Actions' and blue 'Results' headers
  • •Pipeline and money-growth icons
  • •Chevron bullets
Page 106
data visualization

G&P portfolio remains resilient

Content

BP 2027-31 total G&P portfolio is US$ 3.0 billion: 1.9 in implementation and 1.1 in evaluation. By category: Current Investments 1.8, Adjustments of Natural Gas Processing Units 0.2, New Thermal Power Plants 0.6 and Others 0.5. Projections subject to +/-5% variation.

Layout Structure

Centered double donut chart with total in the middle and legend beneath, orange left-edge shape.

Key Visual Elements

  • •Double donut chart
  • •Centre figure 3.0 US$ billion
  • •Legend of five categories plus phases
Page 107
data visualization

G&P Capex under implementation

Content

Waterfall from BP 2026-30 (2.2) with inflation +0.1, FX +0.1 and period adjustment -0.2 to normalized 2.2, then current investments +0.2 and return of the new thermo power plant to the portfolio under evaluation -0.4, ending at 1.9 in BP 2027-31 (US$ billion). The BP 2027-31 stack is Power 0.6, Gas 0.7 and Natural gas processing 0.7.

Layout Structure

Waterfall chart with stacked start and end columns, grey normalized bar and legend below.

Key Visual Elements

  • •Waterfall bars
  • •Grey circles 2.2, 2.2 and 1.9
  • •Legend: Power, Gas, Natural gas processing
  • •Call-out 'New thermo power plant'
Page 108
section divider

Value proposition: Low Carbon

Content

Value proposition for Low Carbon: operate in low-carbon businesses, diversifying the portfolio in a profitable way and promoting the longevity of Petrobras.

Layout Structure

Forest and glass-building photo on the left with a large green diagonal panel holding the statement on the right.

Key Visual Elements

  • •Upward-looking photo of trees and glass facade
  • •Green diagonal panel
  • •Lime left-edge shape
  • •Heading 'Value proposition / Low Carbon'
Page 109
data visualization

The energy transition will materialize through the entry of new sources

Content

Stacked bars for 2025 vs 2040: Light/gasoline 2.3 to 2.5 exajoules, Aviation/jet fuel 0.3 to 0.4, Heavy/diesel 1.7 to 2.3, Maritime/bunker 0.1 to 0.2, and electricity mix 81.9 to 136.2 GW avg. Notes: ethanol currently at 32% and could reach 35%; biodiesel mandate potentially reaching 20% by 2030; SAF compliance with CORSIA from 2027.

Layout Structure

Five side-by-side panels each with a two-column stacked bar chart, legend and caption underneath.

Key Visual Elements

  • •Five bar-chart panels (Light, Aviation, Heavy, Maritime, Electricity Mix)
  • •Legends by fuel type
  • •Source note: National Energy Balance and Petrobras
  • •IMO footnote
Page 110
timeline

Our journey towards a more sustainable future

Content

Gantt-style chart of entry timing by segment from 2025 to 2032+: decarbonization, biodiesel and biorefining & green chemicals from 2025; solar and onshore wind and energy storage from 2026; ethanol and biomethane from 2027; carbon capture from 2028; low carbon hydrogen & derivatives and critical minerals from 2029; offshore wind from 2032+. The chart shows time frame of entry, not investment intensity.

Layout Structure

Eleven horizontal gradient bars with icons on the left and a year axis at the bottom.

Key Visual Elements

  • •Eleven coloured horizontal bars
  • •Segment icons
  • •Year axis 2025 to 2032+
  • •Footnote on CCUS-EOR operating since 2008
Page 111
diagram

Bioproducts are a strategic hedge for the longevity of existing infrastructure

Content

Flow from biofuel chains (ethanol, biodiesel, biomethane) through an integrated industrial platform (biorefining and the refining system as a hub) to markets and consumers: light mobility, road transport, aviation and maritime, industry and cities. Message: more alternatives to preserve the competitiveness and value of existing businesses.

Layout Structure

Three-column left-to-right flow diagram with chevron connectors and a table of products and routes on the right.

Key Visual Elements

  • •Three coloured column headers
  • •Illustrated icons for each chain
  • •Chevron arrows
  • •Products and routes table
Page 112
comparison

Ethanol

Content

Ethanol has a central role in future light transportation with potential in aviation and maritime. The anhydrous ethanol blend is currently 32% (E32) and potentially 35% by 2030; entry model is minority stakes in leading companies. Synergies: refining feedstock, backhaul freight, direct sales, CCS & BECCS and e-fuel.

Layout Structure

Photo strip on the left, centre column of Regulatory, Market and Model text, right grey column titled Synergies.

Key Visual Elements

  • •Biorefinery and cornfield photo
  • •Section headings Regulatory advances, Market, Model
  • •Synergies list with chevrons
  • •Abbreviation footnote
Page 113
diagram

Corn ethanol

Content

Neomille is owned 42% by Petrobras and 58% by Cerradinho. Strategic cooperation with rights of first refusal (20 years): acquisition of 42% of ethanol volume and 90% of technical corn oil volume, and supply of 50% of diesel demand. Plants: Chapadao do Ceu (GO) 1.1 MM ton/year milling and 0.5 bn l/year ethanol; Maracaju (MS) 0.6 MM ton/year and 0.3 bn l/year.

Layout Structure

Left ownership diagram with logos, centre map with two plant locations, right grey column with cooperation terms and plant data.

Key Visual Elements

  • •Neomille and CerradinhoBio logos with 42%/58% split
  • •Brazil map highlighting GO and MS
  • •Cooperation terms list
  • •Plant capacity figures
Page 114
comparison

Biomethane

Content

Regulatory advances foster a large potential market: the biomethane mandate is approved, with entry into force pending the first CGOBs. Petrobras plans a minority stake with a relevant player and will hold calls for proposals for biomethane and CGOB contracts of up to ten years, starting in 2027. Seven synergies are listed, including hedge for mandate obligation and BECCS.

Layout Structure

Photo strip on the left, centre column of Regulatory, Market, Model and Call for proposals, right grey Synergies column.

Key Visual Elements

  • •Biogas digesters photo
  • •Four section headings
  • •Synergies list
  • •CGOB footnote
Page 115
comparison

Biodiesel

Content

Biodiesel is positioned as a solution for decarbonizing heavy road transport with an outlook for maritime. The mandate is currently 15% and potentially 20% by 2030, with CNPE possibly raising the annual target up to 25%. Synergies: biorefining, marine fuel (B24 and B100 markets) and direct sales.

Layout Structure

Soybean photo on the left, centre text with Regulatory, Market and Model, right grey Synergies column.

Key Visual Elements

  • •Soybean pods photo
  • •Regulatory, Market, Model sections
  • •Three synergies
  • •CNPE footnote
Page 116
comparison

Biorefining

Content

Diesel R coprocessing is available and has been marketed since September 2023. SAF coprocessing: REDUC with CORSIA certification since 2025; REVAP, REGAP and REPLAN implemented and undergoing certification. Dedicated plants: RPBC HEFA 15 Kbpd (2030), Boaventura HEFA 19 Kbpd (2032+), REPLAN ATJ 10 Kbpd (2032+); RPBC FID is approved.

Layout Structure

Three outlined boxes (Diesel R, SAF, Raw materials) on a refinery photo background strip.

Key Visual Elements

  • •Outlined boxes with headings
  • •Dedicated plant capacities
  • •Refinery column photo
  • •Glossary footnotes
Page 117
diagram

Renewable generation integrated with the storage chain is an essential asset to meet future demand

Content

Flow from renewable generation (onshore wind, solar photovoltaic) to an integrated storage platform (BESS, battery cell and pack assembly, critical minerals) to markets and energy consumers (power system, industry, mobility, cities). Message: growth in renewable generation reinforces the importance of storage and requires critical minerals.

Layout Structure

Three-column flow diagram with circular images and chevrons, mirroring slide 111.

Key Visual Elements

  • •Circular photos of wind turbines and solar panels
  • •BESS and battery pack tiles
  • •Markets and consumers circle
  • •Chevron arrows
Page 118
comparison

Electrification of traditional sectors and future demand keep renewable generation a robust and profitable diversification alternative

Content

Renewable generation joint venture with Lightsource BP: Milagres Solar PV plant (CE) with 212 MWp installed since 2023 and a pipeline of 1 to 1.5 GW at a more advanced stage; the JV registered storage projects for the Capacity Reserve Auction. Our choices and focus areas include data centers, industries and electrolysis hydrogen support.

Layout Structure

Solar and wind photo strip on the left, text on white, large teal diagonal panel at lower right for the joint venture.

Key Visual Elements

  • •Solar panel photo
  • •Our choices and Focus areas text
  • •Teal Renewable generation panel
  • •Thumbs-up and lightning icons
Page 119
comparison

Energy storage

Content

A strong Brazilian market with expected demand through capacity reserve auctions. Segment outlook: growing demand tied to the energy mix and curtailment mitigation; focus areas: BESS projects under competitive business models, own or in partnership, plus internal energy optimization.

Layout Structure

Two text columns (Segment outlook, Focus areas) above a wide photo of battery storage containers.

Key Visual Elements

  • •Photo of BESS containers
  • •Two icon headers
  • •Footnote defining BESS
Page 120
diagram

Critical Minerals

Content

Strong growth in battery demand drives demand for minerals; Decree 13,146/2026 defines the country's critical and strategic minerals. Petrobras assesses business and R&D opportunities, prioritizing synergy with the battery value chain. Value chain in nine steps: exploration, extraction, refining, battery cell assembly, packs, BESS, electric mobility charging, reuse and recycling, split upstream, midstream (R&D) and downstream.

Layout Structure

Photo strip on the left, Context and Our approach text on top, nine-step process bar across the bottom.

Key Visual Elements

  • •Mining conveyor photo
  • •Nine numbered process tiles
  • •Upstream, Midstream R&D, Downstream bands
  • •Context and approach columns
Page 121
comparison

Low Carbon Hydrogen and its derivatives

Content

A solution for hard-to-abate sectors. Pilot plants: Acu Valley (RN) 2 MW of electrolysis (2027) and REPLAN (SP) 20 MW (2030). Own and partnership projects: low carbon ammonia (BA) 130 kta (2030+) and e-methanol (SP) 100 kta (2030+).

Layout Structure

Left column of Key levers, Auctions and Model, middle column of projects, aerial photo of the Acu Valley pilot at right.

Key Visual Elements

  • •Aerial photo of thermal plant and solar field
  • •Key levers text
  • •Project capacity list
  • •Pilot plant caption
Page 122
comparison

Expanding our technological leadership in CCUS

Content

CCUS-EOR in the pre-salt has accumulated ~87.5 MtCO2 since 2015. Sao Tome pilot is the first CCS pilot in Brazil, injecting 100,000 tCO2/year into a saline reservoir. Four CCUS hub projects are under study (SP, RJ, ES and BA).

Layout Structure

Three vertical grey panels (CCUS-EOR, Sao Tome pilot, CCUS hubs) with illustrations of a FPSO, subsea well and an industrial hub.

Key Visual Elements

  • •FPSO and subsurface cross-section illustration
  • •Isometric illustration of a CCUS hub
  • •Three column headings
  • •Glossary footnote
Page 123
diagram

R&D Strategy for Low Carbon Products

Content

R&D themes arranged along the value chain: renewable feedstocks and circular economy, biomethane, feedstock pretreatment, energy densification of biomass, biofuel technologies (co-processing, SAF, LCAF, HVO, bunker), green chemistry and performance and quality of renewable products. Stages: sustainable raw materials, preprocessing, conversion/processing and products.

Layout Structure

Seven rounded cards in a staggered row with photos, closed by four blue stage bars along the bottom.

Key Visual Elements

  • •Seven outlined cards with photos
  • •Bottom stage bars
  • •capPRO asphalt logo
  • •LCAF footnote
Page 124
data visualization

Robust projects are progressing into the portfolio under Implementation

Content

BP 2027-31 total Low Carbon portfolio is US$ 5.3 billion: 2.0 in implementation and 3.3 in evaluation. By area: Onshore wind and solar PV 0.8, Low carbon hydrogen and derivatives 0.6, CCUS, CVC and others 0.9, Ethanol 1.3, Biodiesel/Biomethane 0.9 and BESS 0.8.

Layout Structure

Centered double donut chart with total in the middle and two-row legend underneath.

Key Visual Elements

  • •Double donut chart
  • •Centre figure 5.3 US$ billion
  • •Six-category legend plus phases
Page 125
data visualization

Low Carbon Capex under implementation

Content

Waterfall from BP 2026-30 (1.8) with inflation +0.04, FX +0.004 and period adjustment -0.5 to normalized 1.4, then Wind & Solar +0.2 and BESS, CCUS, CVC & others +0.4 to reach 2.0 in BP 2027-31 (US$ billion). Ethanol is 1.3 in both end columns.

Layout Structure

Waterfall chart with stacked start and end columns, grey normalized bar and five-item legend.

Key Visual Elements

  • •Waterfall bars
  • •Grey circles 1.8, 1.4 and 2.0
  • •Legend: Ethanol, Biodiesel/Biomethane, BESS CCUS CVC & others, Onshore wind and solar PV, Low carbon hydrogen
Page 126
section divider

Climate Change and Decarbonization (section divider)

Content

Section divider titled 'Climate Change and Decarbonization', with two employees in conversation on a light blue background. No numeric content.

Layout Structure

Photograph of two people on a sky-blue field with a large white title in a blue diagonal shape and Petrobras logo at top right.

Key Visual Elements

  • •Two employees, one using a wheelchair
  • •Blue geometric shapes
  • •Large white italic title
  • •Petrobras logo
Page 127
comparison

Climate Positioning Pillars

Content

Decarbonization as a value lever, built on three pillars: transparency and climate change management (governance up to the Board, third-party verified inventory); competitiveness of the O&G portfolio (resilience of the fossil portfolio amid the transition); and low carbon business, Scope 3 emissions and just transition (portfolio exposure to carbon).

Layout Structure

Three equal rounded columns with coloured headers, icons above and bullet lists below.

Key Visual Elements

  • •Three coloured pillar headers (green, blue, teal)
  • •Icons for globe, money and CO2
  • •Bullet lists
Page 128
table

Scopes 1 & 2 Commitments and Ambitions

Content

Table comparing the previous 2030 commitments with the revised 2030 and new 2035: absolute operational emissions -30% to -18% (2030) and -20% to -18% (2035), reference 2015; routine flaring zero; E&P GHG intensity up to 15 kgCO2e/boe; refining intensity 30 to 35 (2030) and 33-34 (2035) kgCO2e/CWT; upstream methane intensity 0.20. Ambitions: Net Zero by 2050 and Near Zero Methane 2030.

Layout Structure

Row-based table with icons at left, three data columns (2030 Previous, 2030 Revised, 2035) and an Ambitions box.

Key Visual Elements

  • •Five-row commitments table
  • •Highlighted Revised and 2035 columns
  • •Target icon
  • •Ambitions box with three footnotes
Page 129
data visualization

Our 2030 and 2035 commitments keep pace with portfolio expansion

Content

Scopes 1 and 2 emissions in MtCO2e: 78 (2015), 56 (2020), 62 (2021), 48, 46, 47 and 50 (2025). Commitments: 64 in 2030 (-18% vs 2015) and 62-64 in 2035. Text says the trajectory will be supported by efficiency gains and mitigation projects, aiming to limit peak emissions in the early 2030s.

Layout Structure

Bar chart with blue historical bars and green commitment bars on the left, grey text sidebar on the right.

Key Visual Elements

  • •Blue bars 2015-2025
  • •Green commitment bars 2030 and 2035
  • •-18% arrow
  • •Sidebar explanatory text
Page 130
data visualization

We reinforce our commitment to low emissions intensity in E&P as a competitive advantage

Content

E&P GHG intensity (kgCO2e/boe) fell from 19.9 in 2015 to 14.7 in 2025 (9M26 14.1), against an industry average of 18.7 (IOGP); commitment is to stay at 15 in 2030 and 2035. Between 2015 and 2025 intensity was reduced by 26% while operated production grew by more than 50%; pre-salt assets are around 10 kgCO2e/boe.

Layout Structure

Bar chart with an industry-average dotted line on the left, grey sidebar with explanatory text on the right.

Key Visual Elements

  • •Bars 19.9 down to 14.1
  • •Industry average 18.7 marker with IOGP logo
  • •Commitment bars 15 and 15
  • •Sidebar text
Page 131
data visualization

We play a leading role in methane emissions management

Content

Upstream methane emissions intensity (tCH4/thousand tHC) fell from 0.65 in 2015 to 0.23 in 2025 and 9M26, a 65% reduction, with a 2030 commitment of 0.20. The 2025 increase is attributed to improved monitoring and quantification under OGMP 2.0; in October 2026 Petrobras was awarded the OGMP 2.0 Gold Standard. The roadmap to near zero methane has venting, flaring and fugitive levers.

Layout Structure

Bar chart and roadmap waterfall on the left, grey sidebar on Monitoring and Mitigation on the right.

Key Visual Elements

  • •Bar chart 0.65 to 0.23
  • •Roadmap waterfall: venting, flaring, fugitive
  • •OGMP and Carbono Neutro logos
  • •Commitment target 0.20
Page 132
data visualization

We seek greater Refining competitiveness with a new 2035 commitment

Content

Refining GHG intensity (kgCO2e/CWT): 43 in 2015, 36.7 in 2025 and 37.2 in 9M26; commitments 35 for 2030 and 34-33 for 2035. Text states a 15% improvement over 10 years, about 5.9 million tCO2e avoided to date, and new investments of more than US$ 1 billion planned over five years for an additional ~2 million tCO2e per year reduction by 2030.

Layout Structure

Bar chart on the left with commitment bars, sidebar of text on the right and two footnotes at the bottom.

Key Visual Elements

  • •Bars 43 to 37.2
  • •Commitment bars 35 and 34/33 (hatched range)
  • •Sidebar text
  • •Methodology footnotes
Page 133
data visualization

Levers to mitigate emissions over time

Content

Carbon Neutral Program deepens opportunities. Waterfall from 2015 to 2025 to Target 2030 with portfolio growth increasing emissions and process efficiency, energy, losses and CCUS reducing them. Investments in emission mitigation from 2027 to 2031 are US$ 4.8 billion, 14% higher than BP 2026-30 (Scopes 1 and 2); 12 Decarbonization Fund projects contribute 0.24 MMtCO2e by 2030.

Layout Structure

Schematic waterfall on the upper left, three coloured lever tiles below, green sidebar with the US$ 4.8 billion callout on the right.

Key Visual Elements

  • •Schematic waterfall (no axis values)
  • •Three groups of lever tiles
  • •Green sidebar with US$ 4.8 billion
  • •Carbono Neutro logo
Page 134
comparison

R&D Strategy for Decarbonizing Operations

Content

Net Zero 2050 ambition supported by promising technologies. Five R&D lines: technologies to reduce fuel consumption (operational efficiency), methane monitoring and mitigation (loss reduction), low carbon energies (energy mix), low carbon hydrogen and renewable feedstocks (industrial processes) and CCUS.

Layout Structure

Five equal outlined columns with circular images at the top, bullet lists inside and a theme label at the bottom of each.

Key Visual Elements

  • •Five circular photos/icons
  • •Bullet lists per column
  • •Bottom italic labels
  • •CCUS icon
Page 135
KPI dashboard

Product portfolio projections

Content

Portfolio GHG emissions intensity could stay at the 2022 level in 2030 with a prospective reduction of up to 2.5% by 2035. Renewable fuel production capacity could expand up to 5.5x (50 thousand boed) in 2030 and 10.3x (92 thousand boed) in 2035 vs 2022; renewable electricity could reach up to 21% (around 1.3 GW) of installed capacity in 2030 and 24% (1.7 GW) in 2035.

Layout Structure

White left side with the intensity message and a blue diagonal panel on the right listing fuel and electricity projections.

Key Visual Elements

  • •Blue diagonal panel
  • •Barrel and lightning icons
  • •Footnote: total portfolio (Implementation + Evaluation)
Page 136
KPI dashboard

Investments of US$ 13.5 billion in energy transition

Content

11% of total BP 2027-31 investments. Decarbonization: emission mitigation US$ 4.8 billion (E&P, RTM and G&P 3.5; Decarbonization Fund 1.3). Profitable diversification: renewables and low carbon US$ 2.6 billion and bioproducts US$ 4.1 billion. R&D low carbon US$ 2.0 billion, 23% of total R&D budget in 2027 reaching 40% by the end of the period.

Layout Structure

Three coloured column cards (Decarbonization, Profitable diversification, R&D) with sub-figures in grey bodies.

Key Visual Elements

  • •Three headed cards
  • •Sub-breakdowns in US$ billion
  • •Icons for CO2, signpost and microscope
Page 137
section divider

Engineering, Technology & Innovation (section divider)

Content

Section divider titled 'Engineering, Technology & Innovation' with two employees walking on a teal background. No numeric content.

Layout Structure

Photograph left, yellow title text on a teal diagonal shape and Petrobras logo at top right.

Key Visual Elements

  • •Two employees with names captioned
  • •Teal geometric background
  • •Large yellow italic title
  • •Petrobras logo
Page 138
comparison

Engineering, Technology and Innovation focused on value generation and capital discipline

Content

Three pillars: maximize value generation throughout the project life cycle, ensure resource readiness within the required time, cost and quality, and innovate to optimize assets and enable future projects and new businesses (including digitization, automation and AI adoption).

Layout Structure

Three rounded columns in green, blue and teal with bullet lists beneath.

Key Visual Elements

  • •Three coloured column headers
  • •Bullet lists
  • •Teal outline curve at the bottom
Page 139
data visualization

We have achieved higher Capex execution, with on-time delivery and capture of anticipation opportunities

Content

Planned vs executed Petrobras investment (US$ billion) for 2020-2026, with a 2026 forecast of 24-25.5 and average under-execution of ~20% in earlier years versus a higher level of execution recently. The start-up predictability table shows Buzios 8 (P-79), Buzios 6 (P-78), Mero 4, Buzios 7, REVAP HDT, REPLAN HDT and RNEST Train 1 delivered in the planned year, with Mero 4, REVAP HDT and REPLAN HDT ahead of schedule.

Layout Structure

Left grey card with a planned vs execution bar chart, right table of projects with BP 2024-28 and execution years and check marks.

Key Visual Elements

  • •Grey and blue paired bars
  • •Range label 24-25.5
  • •Start-up table with check marks
  • •Footnotes on estimates
Page 140
data visualization

Planned Capex for 2027 and 2028 incorporate major project milestones and capture of anticipation opportunities

Content

A project life-cycle curve shows Capex shares of subsea 25%-40%, wells 15%-25% and topside 40%-55%, with 65-80% spent by first oil and 85-95% by peak production. A stacked bar chart shows main E&P production-system Capex 2027-2031 by discipline. 2027-2028 highlights include Buzios 8 ramp-up, start-up of Buzios 9, 10 and 11, ADU for RNEST Train 2 in 2027 (+50 thousand barrels) and over 20,000 contractors mobilized.

Layout Structure

Two chart panels at the top (life-cycle curve and stacked bars), blue diagonal panel with highlights at lower left and notes at lower right.

Key Visual Elements

  • •Life-cycle area chart with percentage ranges
  • •Stacked bars 2027-2031 without value labels
  • •Investment highlights list
  • •Small-print notes
Page 141
KPI dashboard

Integration of disciplines enables production growth

Content

Buzios 8 (P-79) started up 3 months ahead of BP 2026-30; in 2026, 45% of pipelines tied in and 74% of Wet Christmas Trees installed were reused. A bar chart of wells tied in per year (2016 to 2026 projected) peaks at 77 in 2025, with 63 projected for 2026, and around 90% of new-well production achieved.

Layout Structure

Left green cards (integrated teams, commissioning), right blue resource-readiness panel with bullets and a bar-and-line chart.

Key Visual Elements

  • •Bar and line chart of wells tied in
  • •Green and blue cards
  • •Production curve line
Page 142
data visualization

Successful strategies drive consistent ramp-ups even in more complex projects

Content

Ramp-up duration of pre-salt units has trended downward from 2010 to 2025; FPSO Almirante Barroso (Buzios 5) set a record of under 5 months and FPSO Almirante Tamandare reached 225 kbpd in under 6 months. P-78 (Buzios 6) had first gas injection in Mar/26 and peak production in Oct/26; P-79 (Buzios 8) started up in May/26, 3 months ahead of BP 2026-30.

Layout Structure

Green box of improvement levers, scatter plot with trend line in the middle, two bottom panels with unit photos and milestones.

Key Visual Elements

  • •Scatter plot with declining trend line
  • •FPSO icon call-outs
  • •Two circular platform photos
  • •Footnote on platforms above 150 kbpd
Page 143
KPI dashboard

We increased production capacity with no additional investment in the platforms

Content

Petrobras is authorized to expand production capacity by up to 282 kbpd; additional authorized capacity in 2026 ranges from +10 to +45 kbpd across eleven platforms (e.g. Buzios 7 +45, Mero 2 +45, Mero 4 +45). Additional 2026 volume corresponded to 7 days of Petrobras' production, with an average gain of 87 kbpd; six more units have planned capacity increases and an ambition of up to 260 kbpd.

Layout Structure

Left stat boxes, a large bordered grid of eleven platform photos with kbpd labels, green banner across the bottom.

Key Visual Elements

  • •Eleven circular platform photos with kbpd labels
  • •Left stat boxes (282 kbpd, 7 days, 87 kbpd)
  • •Green banner of six upcoming units
Page 144
data visualization

FPSO optimization to mitigate inflationary pressure

Content

Topside weight reduction with proportional Capex reduction: SEAP ~5k ton (-10%), Albacora ~5k ton (-13%), Buzios 12 ~11k ton (-17%) and REVIT Tupi ~26k ton (-51%). Six hexagonal levers: engineering guidelines, estimates and controls, project commissioning, reliability and suppliers, project schedules and costs.

Layout Structure

Left hexagon cluster of levers, right green diagonal panel with four teal bars of percentage reductions.

Key Visual Elements

  • •Hexagon lever diagram
  • •Four teal bars with percentages
  • •Green diagonal panel
Page 145
KPI dashboard

Project standardization and industrialized subsea solutions for schedule and cost savings

Content

Potential cost and schedule savings: ~50% reduction in pipeline investment (pipe-by-the-meter procurement), 30% Capex reduction in the subsea system, 70% reduction in material variability, plus a PLV fleet alternative to traditional EPCI. Left side lists project standardization, early supplier involvement, qualifications outside the critical path and defined schedule for platform upgrades.

Layout Structure

Blue header banner, four green-icon rows on the left, and a right card with four blue figure tags and descriptions.

Key Visual Elements

  • •Four icon rows
  • •Blue tags ~50%, 30%, 70%, PLV fleet
  • •Subsea photo circle
Page 146
map

Advanced well engineering solutions enhance results in new exploratory frontiers

Content

MORPHO well in the Equatorial Margin (block FZA-M-59, WI PB 100%) resulted in three oil discoveries in a new frontier: 175 km off Amapa, 2,900 meters of water depth, final depth ~7,000 meters. Colombia campaign: 5 wells drilled, 2 formation tests, ~2.5 years; Sandia-1 drilled in 48 days at 86 meters per day.

Layout Structure

Dark blue map of the Brazilian equatorial margin on the left with a block inset, text columns in the middle and a white panel on the right for Colombia.

Key Visual Elements

  • •Map with Amapa Deep Waters, Pama, Barreirinhas, Ceara, Potiguar
  • •Block FZA-M-59 inset
  • •Colombia campaign panel
Page 147
table

Critical Resource Management remains focused on maximizing portfolio value

Content

For 2027-2031: ~250 wells to be drilled and completed, ~280 wells to be tied-in and ~200 P&A interventions on subsea wet-tree wells. Estimated average five-year expenditure distribution: drilling rigs well drilling & completion ~70%, workover ~10%, P&A ~20%; subsea support vessels ~60% / ~30% / ~10% across Capex, Opex and decommissioning.

Layout Structure

Left green text box and large green numbers, right grid of coloured cells by Capex, Opex and Decommissioning.

Key Visual Elements

  • •Colour-coded expenditure grid
  • •Large 2027-2031 well counts
  • •Legend: Capex, Opex, Decommissioning
Page 148
timeline

Consistent pipeline of new production systems and complementary projects

Content

Timeline 2026 to 2032+: Buzios 8 (P-79, 180 kbpd) in 2026; Buzios 9, 10 and 11 (P-80, P-82, P-83, 225 kbpd each) in 2027; Raia (126 kbpd, WI PB 30%) in 2028; Atapu 2 (P-84, 225 kbpd) in 2029; Sepia 2 (P-85, 225 kbpd) and SEAP 2 (P-87, 120 kbpd) in 2030; SEAP 1 (P-81) and REVIT Albacora (P-88) in 2031. Around 100 new wells from complementary projects over five years.

Layout Structure

Wavy blue timeline with vertical stems for each year, coloured circles for unit types and a dashed box for 2032+ to-be-contracted projects.

Key Visual Elements

  • •Year-by-year project stems
  • •Colour legend: pre-salt, non-operated, post-salt, project without FPSO, in production
  • •2032+ box labelled To be contracted
Page 149
timeline

Buzios consolidates as the largest producing field, with start-up of three new units in 2027

Content

Buzios field has 8 FPSOs in operation with 1.33 MM bpd installed capacity, 3 FPSOs under implementation, more than 2 MM bpd of installed capacity in 2027 and 1 FPSO under procurement. Status: Buzios 6 peak in Oct/26, Buzios 8 in ramp-up, Buzios 9 and 10 sailing to Brazil and Buzios 11 preparing to leave the shipyard.

Layout Structure

Santos Basin locator at the left, blue panel with field figures at top right, row of five FPSO photos beneath.

Key Visual Elements

  • •Santos Basin map inset
  • •Five FPSO photographs
  • •Blue panel with field statistics
Page 150
comparison

Strong execution of the Atapu 2 and Sepia 2 FPSOs is underpinned by lessons learned from our recent owned platforms

Content

Atapu 2 (P-84) for 2029 has module lifting started, EPCI contracted, drilling underway, first WCTs received and a preliminary license issued (Stage 4); Sepia 2 (P-85) for 2030 has the same status items. New technologies on P-84 and P-85 include an all-electric system, DHSV-e and PACI-e (reliability above 90%).

Layout Structure

Left field map and technology text, right two stacked colour cards (blue for Atapu 2, green for Sepia 2) with shipyard photos.

Key Visual Elements

  • •Atapu and Sepia field outlines
  • •Shipyard photographs
  • •PACI-e diagram
  • •Two project status cards
Page 151
comparison

FPSO projects under procurement add 300 kbpd of oil capacity

Content

Buzios 12 (P-91) is an FPSO with 180 kbpd capacity, with a 17% reduction in topsides weight versus original assumptions and gas routed to the Boaventura Energy Complex via the Route 3 pipeline. REVIT Albacora (P-88) has 120 kbpd of oil and up to 4.3 MMm3/d of gas, is in negotiation and is scheduled for start-up in 2031.

Layout Structure

Two-column text slide, left grey shape for Buzios 12 and right outlined area for REVIT Albacora.

Key Visual Elements

  • •FPSO icons
  • •Two project headings
  • •Diagonal line shapes
Page 152
KPI dashboard

Decommissioning portfolio remains significant over the five-year period

Content

2027-31: 27 production units to be removed (17 fixed, 6 floating, 4 semi-submersible) at US$ 11.2 billion (68% / 32% split) plus US$ 0.4 billion in financial commitments; 2032 and beyond: 40 units (32 fixed, 7 floating, 1 semi-submersible). Units by basin: 15 in the northeast basins, 8 in Campos and 4 in Santos; ~500 wells with abandonment interventions (59% dry-tree, 41% wet-tree) and ~1,900 km of flexible lines to be recovered.

Layout Structure

Left coastal map with basin counts, right grey area with a central donut flanked by two period columns and horizontal bars below.

Key Visual Elements

  • •Coastal map with numbered basin circles
  • •Donut 68%/32% with US$ 11.2 billion
  • •Two period columns
  • •Horizontal bars for wells and flexible lines
Page 153
timeline

Refining, Logistics, and Low Carbon Energy projects targeting capacity expansion and higher product quality

Content

Main projects timeline 2026 to 2032+: OSBRA (2026); RNEST partial delivery of Train 2 ADU and Santos Terminal on-site (2027); RECAP combustion boiler (2028); RNEST Train 2, UFN-III, Boaventura refining and CCS pilot Sao Tome (2029); RPBC HEFA (2030); and 2032+ projects such as H2V hydrogen hub, OBAPI and REFAP HDT. Dashed outlines mark items still to be contracted.

Layout Structure

Blue wave timeline with yearly columns of coloured project tags and a dashed box for 2032+.

Key Visual Elements

  • •Colour legend: refining, logistics, fertilizers, renewables, to be contracted
  • •Year markers 2026 to 2032+
  • •Project tags per year
Page 154
comparison

Refining and fertilizers: capacity expansion underway

Content

Boaventura Refining (start-up 2029): +76 kbpd S10 diesel, +20 kbpd jet fuel and +12 kbpd lubricant oils, ~10,000 workers mobilized. RNEST Train 2 (start-up 2029): +130 thousand barrels of capacity, ~8,800 workers. UFN-III (start-up 2029): +3,600 t/d of urea (15% of domestic demand) and +177 t/d of ammonia for sale, ~1,800 workers.

Layout Structure

Three rounded cards with photo medallions and blue headers, each holding capacity figures and progress bullets.

Key Visual Elements

  • •Three project photos
  • •Blue headed cards
  • •HCC reactor lifting inset photo
Page 155
comparison

Refining Portfolio Complemented by Sustainability and Energy Efficiency Projects

Content

RPBC HEFA is the first dedicated plant for bio-jet fuel and renewable diesel (15 kbpd, start-up scheduled for 2030, environmental licenses issued and main contracts signed); Boaventura HEFA is the second (19 kbpd, 2032+, in planning). Efficiency projects at REPLAN, RPBC, RECAP, REDUC and REGAP are marked ongoing or under procurement.

Layout Structure

Left two teal cards for HEFA plants, right blue-headed panel of refinery project lists in two columns.

Key Visual Elements

  • •Two teal HEFA cards
  • •Efficiency project panel
  • •Glossary footnotes (FCCU, CO, CTS, STG)
Page 156
comparison

Logistics projects to expand capacity and upgrade storage and outflow infrastructure

Content

Alemoa Terminal (Santos, SP) handles outflow from the four Sao Paulo refineries: on-site work is ongoing with start-up in 2027, pier and dredging in 2032+. OBAPI (Barueri-Caminho de Pilões oil pipeline) involves replacement and relocation of the heavy distillates pipeline, with start-up in 2032+.

Layout Structure

Two rounded cards with blue headers and aerial images, scope bullets beneath, on a green corner shape.

Key Visual Elements

  • •Aerial photo of the Alemoa terminal
  • •Aerial pipeline route photo
  • •Scope bullets
  • •Footnote on Barueri-Utinga pipeline
Page 157
diagram

CCS pilot project paves the way for portfolio evolution

Content

Sao Tome CCS Pilot, 2029, with 100 thousand tCO2/year capture and conditioning capacity; the project is in procurement with part of the scope already contracted. It removes CO2 from the Cabiunas Gas Treatment Unit, transports it by ~70 km pipeline and injects it into the Sao Tome saline reservoir at Barra do Furado. Embedded diagram labels are in Portuguese.

Layout Structure

Left blue info card and right cross-section illustration of capture, transport, well and storage with a caption beneath.

Key Visual Elements

  • •Cross-section illustration Cabiunas to Barra do Furado
  • •Portuguese labels (Captura, Movimentacao, Poco, Armazenamento)
  • •Info card 2029, 100 thousand tCO2/year
Page 158
KPI dashboard

Expansion of R&D and technology portfolio integrated with business needs

Content

US$ 5.7 billion in R&D&I in BP 2027-31 (excluding infrastructure investment of ~US$ 700 MM); 23% of the total R&D&I budget in 2027 allocated to low carbon, reaching 40% by the end of the period. ~US$ 2.0 billion in Low Carbon (35%) versus 65% O&G, HSE and social impact. Outcomes: +1,500 active patents (annual filings 120 in 2021 to 184 in 2025), R$ 6.7 billion in new partnerships, +1,100 ongoing partnerships.

Layout Structure

Left blue pills and a pie chart, centre grey card with a bar chart, right blue Petrobras Conexoes panel.

Key Visual Elements

  • •35%/65% pie
  • •Bar chart 120 to 184 patent filings
  • •Petrobras conexoes para inovacao panel
Page 159
diagram

R&D Portfolio Management

Content

Technology programs act as structuring drivers focused on business challenges: new frontiers and reserves replenishment, operational efficiency of E&P assets, low carbon products and new energies, and decarbonization of operations, built on three pillars: environment, safety and digital.

Layout Structure

Four circular program icons arranged above three horizontal pillar bars with upward arrows.

Key Visual Elements

  • •Four circular program icons
  • •Three stacked pillar bars
  • •Upward arrows
Page 160
comparison

We turn business challenges into opportunities for innovation and value generation (1/3)

Content

Carbon resilience: HISEP CO2 separator under testing, Sao Tome CCS pilot with storage scope of 100 thousand t/year of CO2, and a Rig Emissions Digital Twin delivering a reduction of 35 thousand ton CO2. Renewable sources and cleaner products: methane measurement technologies, SAF/HVO dedicated plant (FID approved, RPBC HEFA), SAF via coprocessing (REPLAN) and launch of CAP Pro R, the first asphalt with renewable content produced in Brazil.

Layout Structure

Two blue-headed rounded cards, one with a HISEP image inset, each with bullet lists.

Key Visual Elements

  • •HISEP subsea illustration
  • •Two blue-headed cards
  • •Acronym footnotes
Page 161
comparison

We turn business challenges into opportunities for innovation and value generation (2/3)

Content

Operational efficiency and automation: ICARO reservoir software delivers gains of more than 3 kbpd in Jubarte and Tupi; hull cleaning robot up to 90% reduction in employee-hours exposed to risk. Asset integrity: insertable DHSV applications with estimated savings of US$ 700 MM in the coming years, plus robotics and drones, Riser Robotic AI and solutions for SCC-CO2.

Layout Structure

Two blue-headed cards with bullet lists, a robotics photo inset on the right card.

Key Visual Elements

  • •Robots and drones photo
  • •Two blue-headed cards
  • •SCC-CO2 footnote
Page 162
comparison

We turn business challenges into opportunities for innovation and value generation (3/3)

Content

New production frontiers (Equatorial Margin and Pelotas Basin): oil migration assessment using satellite imagery and geochemical markers. Complementary projects: AICD autonomous valves restrict water production by 30%, aiming to increase recovery factor by 3%, planned for Campos Basin. Decommissioning: Subsea Reel Drive patent and PWC-TT through-tubing abandonment solution.

Layout Structure

Two upper cards and one wide decommissioning panel at the bottom with a reel-drive illustration.

Key Visual Elements

  • •Subsea Reel Drive illustration
  • •Three blue-headed panels
Page 163
comparison

Active collaboration with suppliers to overcome a challenging market and preserve future execution capacity for Petrobras' projects

Content

An estimated 200,000+ tons of FPSO modules to be built in Brazilian shipyards through 2031 (actual since 2023 plus projected), and an estimated 21,000 tons with the construction of 8 RSVs. Other themes: local content, active listening with suppliers, and workforce qualification (Autonomy & Income Program, ANP training program).

Layout Structure

Left blue-headed collaboration card with bullets, right three grey boxes on local content, shipyards and workforce.

Key Visual Elements

  • •Handshake icon
  • •Collaboration card
  • •Three outlined boxes
  • •Footnote on actual vs projected
Page 164
KPI dashboard

Our demands for the next five-year period

Content

Main procurement estimates: 2 FPSOs under procurement and 7 under study, ~1,000 km of well tubulars, ~7,000 km of rigid and flexible pipelines and umbilicals, ~200 integrated drilling contracts, ~300 WCTs, ~140 completion systems, 9 EPCIs and 16 EPRDs, rig fleet from 20 to 28, subsea support vessel fleet from 85 to 95, 17 refining/G&P/logistics projects and ~300 equipment items, and ~1,400 open innovation challenges.

Layout Structure

Left dark-blue category box, right grid of light-blue tiles with big numbers.

Key Visual Elements

  • •Light-blue number tiles
  • •Dark-blue category list with Innovation tag
  • •Footnotes on fleet counts
Page 165
section divider

Supplemental Material (section divider)

Content

Section divider titled 'Supplemental Material' with an employee walking on a light-green background. No numeric content.

Layout Structure

Photograph left with a large lime-green diagonal shape carrying the white title.

Key Visual Elements

  • •Employee in green suit
  • •Lime-green geometric shape
  • •White italic title
  • •Petrobras logo
Page 166
section divider

Environmental, Social and Governance (section divider)

Content

Section divider titled 'Environmental, Social and Governance' with two employees on a cream background. No numeric content.

Layout Structure

Photograph left, blue diagonal shape carrying the white title, Petrobras logo top right.

Key Visual Elements

  • •Two employees with names captioned
  • •Blue diagonal shape
  • •White italic title
  • •Petrobras logo
Page 167
diagram

Our ESG positioning

Content

A circular E-S-G diagram around the statement to operate with integrity in a safe and sustainable way. Four commitments: reduce carbon footprint (Net Zero 2050 and Near Zero Methane 2030 ambitions), protect the environment (Zero Leak Ambition), take care of people (Zero Fatality Ambition) and act with integrity.

Layout Structure

Left ring diagram with centered text, right stack of four icon-and-text items.

Key Visual Elements

  • •Gradient ring labelled Environmental, Social, Governance
  • •Four circular icons
  • •Footnote on carbon credits
Page 168
comparison

Protect the environment

Content

Commitments: 25% reduction in freshwater withdrawal by 2030 (113 million m3/year), 80% of solid waste directed to reduce, reuse and recycle pathways by 2030, and biodiversity gains by 2030 (positive balance in vegetated areas, +30% biodiversity conservation, R$ 1 billion in biodiversity R&D&I projects). Reference year 2021.

Layout Structure

Left text list with icons, right aerial photo of a river through a forest.

Key Visual Elements

  • •Aerial forest and river photo
  • •Three icon-led commitments
  • •Footnotes on reference year
Page 169
data visualization

Water security

Content

Target: 25% reduction in freshwater withdrawal by 2030 to 113 MM m3/year (base year 2021, revised to include new segments). Freshwater use in 2025: withdrawal 113 (74%) and reuse 40 (26%). Withdrawn volumes in MM m3/year: 151 (2021), 122, 115, 112, 113 (2025), 127 (2026 projection) and 113 (2030). About 54 projects/initiatives could avoid ~44 million m3 of withdrawal.

Layout Structure

Top target banner, three lower cards: usage bars, stacked column chart, and reuse initiatives.

Key Visual Elements

  • •Target banner 113 MM m3/year
  • •Orange and lime horizontal bars
  • •Stacked column chart by refining, energy and others
  • •Reuse and new sources text
Page 170
data visualization

Circular economy

Content

Target: 80% of solid waste from operational processes directed to reuse, recycling and recovery (RRR) by 2030. Share of RRR by year: 68% (2021), 76%, 76%, 75%, 78% (2025), 80% in 2026 with a 78% present marker and 80% in 2030. Actions include coprocessing of oily sludge and expanded RRR pathways for construction, organic and FCC waste.

Layout Structure

Top target banner, bottom-left bar chart, bottom-right list of actions with arrow bullets.

Key Visual Elements

  • •Teal bar chart 68% to 80%
  • •Highlighted 2026 bar with projection dot
  • •80% RRR target banner
Page 171
KPI dashboard

Biodiversity gains

Content

Targets for 2030: R$ 1 billion invested in biodiversity R&D&I (cumulative 2025-30), net positive balance in vegetated areas and more than +30% biodiversity conservation. The 2021 to 2030 table shows protection of endangered wildlife 56 to 73 species, restoration and conservation 175 to 228 thousand hectares, and protected areas management 25 to 33 million hectares.

Layout Structure

Three target rows with arrows and teal result boxes, a comparison table below and a yellow circle with the headline on the right.

Key Visual Elements

  • •Three target banners (R$ 1 billion, >0, +30%)
  • •2021 vs 2030 table
  • •Yellow circle call-out
Page 172
comparison

Act with integrity

Content

Voluntary targets include a minimum of 30% women in statutory body positions nominated in investees through 2030, a minimum of 20% self-identified Black individuals by 2028, sexual harassment investigations concluded within an average 60 days by 2030, 70% of relevant suppliers disclosing GHG inventories by 2028 and 100% of relevant suppliers trained in integrity. Law No. 15,177/2025 sets a 30% minimum of women on boards of state-owned enterprises.

Layout Structure

Two text columns of bullet targets with a blue information box at lower right.

Key Visual Elements

  • •Bold-highlighted targets
  • •Blue info box on Law No. 15,177/2025
Page 173
comparison

Take care of people

Content

Targets: return to society of at least 150% of the amount invested in voluntary social and environmental projects by 2030; top three O&G companies in the human rights ranking by 2030; women in leadership 26% by 2027 and Black people in leadership 28% by 2030; 100% of Mind in Focus commitments by 2030; Workforce Nutrition Alliance pillars by 2031.

Layout Structure

Left photo of two workers on a platform, right bullet list with nested sub-bullets.

Key Visual Elements

  • •Photo of two employees in orange coveralls
  • •Bulleted targets
  • •Footnotes on return measurement and benchmark
Page 174
diagram

Petrobras' Governance

Content

The governance system ensures technical decisions, prevents undue interference and ensures approval of projects with a foreseeable economic return. Five elements: Board of Directors, Executive Board, specialized statutory committees, technical, legal and compliance support, and independent governance and compliance functions with a whistleblower hotline. Oversight by CVM and SEC, CGU, TCU, SEST and CADE.

Layout Structure

Five columns with icons and colour bars at the centre, header checklist at the top and regulator list at the bottom.

Key Visual Elements

  • •Five coloured column icons
  • •Checklist headers
  • •Regulator checklist
Page 175
diagram

Project Approval Governance

Content

Capital investment projects are approved for execution only when they show a positive NPV in all three scenarios. Stages: entry into the Plan's project portfolio, project development and implementation decision; projects exceeding US$1 billion require Board of Directors approval with an Investment Committee opinion, and energy transition projects have lower approval authority thresholds.

Layout Structure

Left text sections with headings and a right three-tier funnel graphic with arrows.

Key Visual Elements

  • •Three-tier funnel in teal, blue and green
  • •Vertical arrows
  • •Footnote on exempt project types
Page 176
diagram

Approval process independent from the Project Team

Content

Flow chart: assumptions set by finance, strategy, tax and technical areas feed the project team's feasibility study; quality assurance by technical and corporate areas, then advisory committees (decision support), then decision makers.

Layout Structure

Left assumptions column, a connected flow of boxes across the centre and right, ending in a green decision-makers box.

Key Visual Elements

  • •Assumptions column with four icons
  • •Project team and quality assurance boxes
  • •Advisory committees
  • •Green Decision makers box
Page 177
section divider

Corporate (section divider)

Content

Section divider titled 'Corporate' with two employees on a lime-green background. No numeric content.

Layout Structure

Photograph left, large green diagonal shape carrying the white title, Petrobras logo top right.

Key Visual Elements

  • •Two employees with names captioned
  • •Green geometric shapes
  • •White italic title
  • •Petrobras logo
Page 178
diagram

Integrated view of the Strategic Plan

Content

Context: short-term price volatility and long-term energy transition; purpose: provide energy that ensures prosperity in an ethical, fair, safe and competitive way. The 2027-31 Business Plan has six pillars: value capture with a unique portfolio, record production trajectory, RTM monetizing reserves, gas, power and low carbon, engineering and innovation, and a more sustainable future, enabled by technology, processes and people.

Layout Structure

Stacked bands: context and purpose on top, six green cards in the middle, three enabler cards with photos at the bottom.

Key Visual Elements

  • •Six pillar cards with icons
  • •Context to purpose arrow
  • •Blue 'enabled by' banner
  • •Three enabler photo cards
Page 179
KPI dashboard

Digital Technologies: Investment that delivers results

Content

Investment in digital technologies in BP 2027-31 is ~US$ 3.0 billion: Infrastructure 50%, Business 27% and Management 23% (the Business portion is included in segment Capex). Achievements include 2026 awards (Gartner Eye on Innovation, Forbes Best ICT in Brazil) and HPC reaching 300 Petaflops of capacity.

Layout Structure

Left donut chart in a grey shape, right stack of five achievement rows with icons.

Key Visual Elements

  • •Donut 50%/27%/23%
  • •Centre ~US$ 3.0 billion
  • •Five achievement rows
Page 180
diagram

Technology as a competitive advantage

Content

Strategic drivers for allocating corporate resources: business competitiveness (information technology as the foundation, with a wheel of value-creation outcomes), strategic use of data and AI (distributed innovation, governance and responsible use of AI, AI leadership) and scale and integration (infrastructure modernization and digital sovereignty, anticipation of threats, people and digital skills).

Layout Structure

Three coloured column headers with stacked icon-and-label pills beneath, a value wheel at the lower left.

Key Visual Elements

  • •Three coloured headers
  • •Value-created wheel diagram
  • •Icon circles with pill labels
Page 181
diagram

Integrating technologies, processes and people

Content

AGILIZA project delivers value through increased productivity, process redesign, adoption of new technologies and responsible use of AI. Four elements: process intelligence, data and AI, digital fluency and operational agility.

Layout Structure

Central circular four-segment diagram labelled AGILIZA with descriptive text at four corners.

Key Visual Elements

  • •Four-segment circular diagram
  • •Icons per segment
  • •Corner text blocks
Page 182
KPI dashboard

Our talent is our main asset, a competitive advantage that drives us into the future

Content

Petrobras is the highest-ranked Brazilian company and 2nd among industry Majors (Forbes, 2026), with 91% for 'Pride in working at Petrobras' in the 2025 Workplace Climate Survey. Talent strategy elements: onboarding and continuing education, reskilling, leadership development, new knowledge frontiers and digital fluency.

Layout Structure

Left box with two ranking statistics, right icon grid of five talent themes and three green pills at the bottom.

Key Visual Elements

  • •Medal and hard-hat icons
  • •Five-theme icon grid
  • •Three green pills: Attractiveness, Belonging, Talent connected to the future of energy
Page 183
diagram

Aligned incentives turn strategy into results

Content

Top targets: FCF, NPV, GHGPI and ECPI, plus SCPI, which does not impact variable compensation to avoid encouraging underreporting; specific targets are tied to each segment's strategic objectives. From General Manager to CEO, part of the variable compensation is deferred over 4 years according to stock performance; other employees receive the full amount in the following year.

Layout Structure

Four panels left to right: top targets, specific targets, target weights bars, variable compensation, with footnotes below.

Key Visual Elements

  • •Pentagon target tags
  • •Target weight bars by employee level
  • •Deferred compensation dots
  • •Glossary footnotes
Page 184
title slide

Business Plan Petrobras 2027-2031 (closing slide)

Content

Closing slide repeating the cover: 'Business Plan Petrobras 2027-2031' with two employees in orange coveralls reviewing a clipboard on a green illustrated industrial background.

Layout Structure

Left title text over a stylized green plant illustration, photo of two employees at right, Petrobras logo top right.

Key Visual Elements

  • •Two employees with clipboard
  • •Green industrial illustration
  • •Title with 2027-2031 label
  • •Petrobras logo

Frequently Asked Questions

Common questions about this slide and the underlying presentation content.

What is the Petrobras Business Plan 2027-2031 presentation?

It is the slide deck Petrobras published for its five-year business plan covering 2027 to 2031. It was filed with the SEC as an exhibit to Form 6-K on 24 November 2026 and has 184 slides covering strategy, market outlook, finances, operations by segment, climate commitments and supplemental ESG and corporate material.

How much does Petrobras plan to invest in 2027-2031?

The deck shows total capital expenditure of US$ 122 billion: US$ 87 billion in Exploration and Production, US$ 24 billion in Refining, Transportation and Marketing, US$ 8 billion in Gas and Low Carbon and US$ 3 billion in Corporate. US$ 113 billion is classed as under implementation and US$ 9 billion as under evaluation. Annual capex is shown as US$ 29.5, 28.3, 23.8, 22.3 and 17.8 billion for 2027 to 2031.

What production and price assumptions does the plan use?

The slides show oil production of 2.9 million barrels per day in each year from 2027 to 2031 and total oil and gas production of 3.5 rising to 3.7 million boed, with 89% from the pre-salt. The Brent assumption is US$ 94 per barrel in 2026, US$ 74 in 2027 and US$ 70 for 2028-2031, with a robust scenario of US$ 50.

What does the deck say about dividends and debt?

The financial strategy section shows a dividend formula of 45% of free cash flow, ordinary dividends of US$ 55-60 billion over the plan, operating cash flow of US$ 230-250 billion, a gross debt limit below US$ 75 billion converging to US$ 65 billion in 2029 and minimum cash of US$ 6 billion.

What are the climate and low-carbon commitments in the plan?

The deck lists a Scopes 1 and 2 emissions commitment of -18% by 2030 (64 MtCO2e versus 78 in 2015), US$ 4.8 billion for emission mitigation and US$ 13.5 billion, or 11% of plan investments, for the energy transition. The Low Carbon portfolio is US$ 5.3 billion, of which US$ 2.0 billion is under implementation and US$ 3.3 billion under evaluation.

How is the presentation structured and designed?

After the title, disclaimer and agenda it runs through Introduction, Market Outlook, Financial Strategy, Exploration and Production, Main E&P Assets, Refining, Transportation and Marketing, Gas and Power, Low Carbon, Climate Change and Decarbonization, and Engineering, Technology and Innovation, followed by Supplemental Material on ESG and Corporate topics. It uses Petrobras' green, blue, yellow and lime palette with a different accent colour per section, bold italic headlines, photo dividers, waterfall and donut charts and KPI cards.

Is the text on the slides fully legible?

The slides are the rasterised images from the SEC filing, so there is no selectable text and some small footnotes are not legible at this resolution. The page-by-page descriptions only quote figures that can be clearly read. One section divider and a few diagram labels are in Portuguese.

Can I use this deck as a template for my own strategic plan presentation?

Yes. Its section order, colour-coded dividers, capex waterfall, segment KPI cards and project pipeline slides are a practical reference for a multi-year business plan or capital markets day deck. The PDF can be downloaded from this page.

2slides

Create Your Own Slides

Turn your ideas into professional presentations in seconds with 2slides AI.

Create World-Class Slides in Seconds

Reference professional designs, choose your style, and generate slides with perfect text rendering. Powered by Nano Banana—start creating your presentation now.

2Slides logo

Your AI Agent for slides. Save time, shine faster with intelligent presentation creation.

Summarize with AI

ChatGPTClaudeGrokPerplexity
All services online

Products

Features

Gallery

Templates

Integrations

Resources

Comparison

© 2026 2slides. All rights reserved.