
Part of Investor presentation examples · Australian investor presentation examples
Northern Star Resources Investor Presentation November 2026 is the corporate presentation used for European investor marketing, lodged with the ASX in November 2026. It covers the Australian gold miner's Western Australia and Alaska portfolio, FY26 results, KCGM and Hemi growth projects, FY27 guidance and investment case; each page carries the standard vertical 'For personal use only' ASX watermark.
Uses this deck’s cover as a style reference for slides made from your own content. Or pick any page below to use its layout as the reference.
Quick Navigation
Tags
Share the slides
Northern Star Resources Investor Presentation November 2026 is the corporate presentation used for European investor marketing, lodged with the ASX in November 2026. It covers the Australian gold miner's Western Australia and Alaska portfolio, FY26 results, KCGM and Hemi growth projects, FY27 guidance and investment case; each page carries the standard vertical 'For personal use only' ASX watermark.
Detailed view of each slide page, including layout, key content and visual elements.
Cover slide of the Northern Star Resources Ltd corporate presentation, labelled European Marketing, Nov 2026. It carries no financial figures.
Logo and title block at left, with an aerial mine photograph cut into chevron-shaped panels across the right.
Sets out the disclaimer and forward-looking statements and the ASX Listing Rule 5.19 and 5.23 statement. Ore Reserves and Mineral Resources are drawn from the 'Resources and Reserves Update' dated 3 June 2026 and reported under JORC 2012; the slide notes depletion over 'the eight-month period to 23 November 2026'. A summary table shows total Mineral Resources of 1,617,472 kt at 1.7 gpt for 88,872 koz and total Ore Reserves of 627,210 kt at 1.4 gpt for 28,419 koz, both as at 31 March 2026, and the release is authorised by Suresh Vadnagra, Managing Director & CEO.
Two text columns, with a small gold-highlighted resource and reserve table at lower right.
Describes Northern Star as a leading gold producer with long-life operations in Australia and Alaska. Four attributes are listed: pure-play gold (100% exposure to gold), tier-1 locations (Western Australia and Alaska), long-life assets, and embedded growth (KCGM, exploration and selective growth opportunities).
Four icon-led attribute rows at left and a map at right marking Hemi, Yandal, Kalgoorlie and Pogo.
States the priorities as operating safely, improving performance and delivering sustainable shareholder returns. Three columns: Deliver (KCGM commissioning and ramp-up, consistent delivery, meet FY27 guidance), Unlock (understand each asset's full potential and identify value levers) and Optimise (selective capital deployment, highest-return opportunities, strategic asset reviews and portfolio fit).
Three colour-coded numbered columns (grey, gold, orange), each with three bullets.
Section divider introducing the FY26 financial results; no figures appear on the slide.
Full-bleed photograph with logo at upper left and title text lower left.
Headline figures in A$ (Australian dollars): underlying EBITDA A$4.3B, underlying NPAT A$1.8B, underlying FCF A$190M, underlying EPS A$1.24ps, dividends A55.0cps, and A$129M of the A$500M share buy-back. Footnotes give the build-up, for example revenue of $7,623M and operating cashflow of $3,183M, and say 6.3M shares were bought back at a cost of $128.9M.
Six-tile KPI grid at left with a mining truck photo at right; small-print footnotes at the bottom.
Two bar charts. Underlying ROCE rises from 4.1% (FY23) to 8.6% (FY24), 11.4% (FY25) and 13.4% (FY26). Underlying EPS is 26, 59, 118 and 124 Acps for FY23 to FY26. A gold callout reads 18% ROCE growth and 5% EPS growth, both FY26 vs FY25.
Split slide with a bar chart on each side and a central gold callout box.
Shows leverage of 0.1x (target <1.5x), gearing of 10% (target <20%) and A$3.0B liquidity (target >A$1.5B), each ticked. Credit facilities at 30 June 2026 are two A$875M revolving bank facilities (undrawn, maturing Mar 30 and Mar 31) and US$600M senior guaranteed notes (drawn, maturing Apr 33). Ratings are Moody's Baa3, S&P BBB- and Fitch BBB-. A net debt table in A$B shows cash and bullion 1.24, senior notes (0.86), net cash 0.38, equipment financing (0.54), lease liabilities (0.33) and net debt 0.49.
Three-part layout: ticked target metrics at left, facilities chart and ratings table in the middle, net debt table at right.
FY26 cash earnings are A$2.9 Billion. The FY26 dividend is 55cps (27% of cash earnings): 25cps in 1H26 and 30cps in 2H26, both fully franked. A stacked bar chart shows interim and final dividends in cents per share for FY21 to FY26, with a $300M buy-back completed at an average $11.04ps and a $500M buy-back announced. The slide states over $0.9 billion returned in FY26 and names the KCGM Mill Expansion and Hemi Project as investments.
Text on the left and a stacked dividend bar chart with shaded buy-back bands on the right.
Section divider for the major growth projects; no figures appear.
Full-bleed photograph of three workers in high-visibility gear with a plant structure behind, title at lower left.
Reports November month-to-date performance versus October: availability of 72%, up from 59%, and throughput up 15%. Current status says month-on-month performance has improved while commissioning and equipment-related issues continue to affect the plant, and the team has been strengthened. Immediate focus is to complete commissioning and deliver sustainable performance, cash flow and returns.
Wide plant photo on top, with three text panels (performance, status, focus) below and a dark banner.
KCGM gold sold guidance is 550-650koz (at lower end), with underground ore tonnes forecast at 3.5-4.0Mtpa. Growth capital: operational A$603M in FY26 and $895-945M in FY27; mill expansion and readiness $1,035M in FY26 and $350-470M in FY27. Mill expansion capex is A$1.75-1.81B versus an initial estimate of A$1.53B, with FY24 $338M, FY25 $552M, FY26 $713M and FY27 $150-210M.
Large plant photo at left with a quote caption, and guidance bullets and two tables at right.
KCGM Open Pit holds 18Moz of Mineral Resources (429Mt at 1.3g/t) and 8Moz of Ore Reserves (182Mt at 1.4g/t). A north-south cross-section of the Super Pit labels Oroya Brownhill, Golden Pike North and Fimiston South, with scale marks of 4.0 km wide and 1 km deep, and a colour legend covering FY27-28, FY29-30 and FY30-32 stages. The breakdown is on page 19.
Key figures at left and a large colour-coded pit cross-section at right.
KCGM Underground holds 21Moz of Mineral Resources (323Mt at 2.0g/t) and 3Moz of Ore Reserves (51Mt at 2.1g/t). Mt Charlotte is described as the foundation (established production, proven mining system, reliable mill feed) and Fimiston Underground as the growth engine (expanding production, next generation). The long-section is marked 4.5 km wide and 2 km deep.
Key figures at left, a long-section graphic at right and two bullet lists below it.
Primary approvals (federal and state environmental) are completed; secondary approvals and engineering and design are in progress. Hemi has 13.2Moz of Mineral Resources and 5.5Moz of Ore Reserves. A banner states the investment decision remains subject to completion of outstanding approvals. The breakdown is on page 20.
Three status panels at top, a two-figure gold band, a dark banner and a site photo at right.
Table of FY27 guidance by Kalgoorlie, Yandal and Pogo. Gold sold totals 1,500-1,650koz and AISC totals A$3,050-3,450/oz. Sustaining capital is A$850-915M and total growth capital A$1,700-2,020M, including the KCGM mill expansion at 350-470 and Hemi at 200-250. Exploration is A$230-250M, D&A A$1,000-1,200/oz, P&L tax rate 30%-32%, and cash tax forecast A$450-550M. Footnotes use AUD:USD = 0.70 for Pogo.
Full-width guidance table with a D&A and tax strip underneath and numbered footnotes.
Five numbered pillars: operational excellence (safely ramp up KCGM), cost and productivity, free cash flow generation, disciplined capital allocation and shareholder returns. A banner reads 'Turning operating performance into shareholder value'.
Five equal columns with large gold numerals and a dark banner at the bottom.
Closing slide with the commitment statement and the website www.nsrltd.com; no figures appear.
Full-bleed pit photograph with logo, statement and web address at left.
KCGM Mineral Resources as at 31 March 2026 total 905,195 kt at 1.4 gpt for 42,191 koz (open pit surface 17,766 koz, underground 21,204 koz). KCGM Ore Reserves total 385,979 kt at 1.2 gpt for 14,997 koz. The slide refers to the 'Resources and Reserves Update' dated 3 June 2026.
Two stacked data tables, resources above and reserves below, with a source footnote.
Hemi total Mineral Resources as at 31 March 2026 are 295,403 kt at 1.4 gpt for 13,198 koz, including Hemi at 11,034 koz and Hemi Regional at 2,164 koz. Hemi Ore Reserves are 140,118 kt at 1.2 gpt for 5,508 koz, all Probable.
Two stacked data tables for Hemi, resources above and reserves below, with a source footnote.
Common questions about this slide and the underlying presentation content.
It is a 20-page corporate presentation from Northern Star Resources Ltd (ASX: NST), titled 'Corporate Presentation – European Marketing – Nov 2026'. It covers the company's gold portfolio, FY26 results, KCGM and Hemi projects, FY27 guidance and the investment case.
It was lodged with the ASX on 23 November 2026 (Sydney time) as an announcement by Northern Star Resources Ltd, ticker NST. The company's website is www.nsrltd.com.
FY26 is Northern Star's Australian financial year ended 30 June 2026, so it runs from July 2025 to June 2026. The deck gives credit facilities 'at 30 June 2026' and refers to the weighted average share count 'at 30 June 2026'. FY27 is the year to June 2027.
Underlying EBITDA of A$4.3B, underlying NPAT A$1.8B, underlying FCF A$190M, underlying EPS A$1.24 per share and dividends of A55.0 cents per share, plus A$129M spent of the A$500M share buy-back (page 6).
Gold sold of 1,500-1,650koz at AISC of A$3,050-3,450/oz, sustaining capital A$850-915M, total growth capital A$1,700-2,020M and exploration A$230-250M. The slide titles it 'unchanged' (page 16).
Mill expansion project capex is A$1.75-1.81B versus an initial estimate of A$1.53B. In November month-to-date versus October, availability was 72%, up from 59%, with throughput up 15%; commissioning issues continue to affect the plant (pages 11-12).
Hemi has 13.2Moz of Mineral Resources and 5.5Moz of Ore Reserves. Primary approvals are completed, secondary approvals and engineering are in progress, and the investment decision remains subject to outstanding approvals (page 15).
The vertical 'For personal use only' mark at the left edge is the standard ASX lodgement watermark on announcements. It is not part of the slide content, and the presentation is not an offer or investment recommendation, as the disclaimer on page 2 states.
Create Your Own Slides
Turn your ideas into professional presentations in seconds with 2slides AI.
Reference professional designs, choose your style, and generate slides with perfect text rendering. Powered by Nano Banana—start creating your presentation now.
Your AI Agent for slides. Save time, shine faster with intelligent presentation creation.
All services online© 2026 2slides. All rights reserved.