
Part of Investor presentation examples · Indian investor presentation examples
Hindustan Zinc Investor Presentation November 2026: the "Hindustan Zinc Limited 2.0" project announcement, in which the Board approves expansion projects with an overall investment of c.₹ 80,000 crore over 3-5 years to take refined metal capacity from 1.1 MTPA to 2.0 MTPA and silver refining capacity from 800 TPA to 1,500 TPA. The deck was filed with BSE and NSE on November 16, 2026 by Hindustan Zinc Ltd (Vedanta group; NSE: HINDZINC, BSE: 500188) and also covers the company's asset base, India demand drivers and investor call details.
Uses this deck’s cover as a style reference for slides made from your own content. Or pick any page below to use its layout as the reference.
Quick Navigation
Tags
Share the slides
Hindustan Zinc Investor Presentation November 2026: the "Hindustan Zinc Limited 2.0" project announcement, in which the Board approves expansion projects with an overall investment of c.₹ 80,000 crore over 3-5 years to take refined metal capacity from 1.1 MTPA to 2.0 MTPA and silver refining capacity from 800 TPA to 1,500 TPA. The deck was filed with BSE and NSE on November 16, 2026 by Hindustan Zinc Ltd (Vedanta group; NSE: HINDZINC, BSE: 500188) and also covers the company's asset base, India demand drivers and investor call details.
Detailed view of each slide page, including layout, key content and visual elements.
Cover slide titled "Hindustan Zinc Limited 2.0", labelled as a Project Announcement dated November 2026, with Vedanta and Hindustan Zinc (Zinc & Silver of India) logos. Two badges state the company is the World's Largest Integrated Zinc Producer and Amongst Top 10 Silver Producers Globally.
Full-bleed photo of a smiling female worker in hard hat and orange coveralls on the left, blue-green gradient overlay on the right with logos, large white headline, a translucent date box at bottom left and two green icon badges along the bottom.
Standard legal disclaimer: information may come from unverified public sources, no warranty is given, and forward-looking statements depend on assumptions about metals markets (including the London Metal Exchange), interest and exchange rates, metal prices and other risks. The presentation is not an offer or solicitation to buy or sell Hindustan Zinc securities.
Title at top with 'Disclaimer' in green; cut-out photo of a worker on the left; two columns of white body text inside a blue-to-green gradient panel.
Eight claims: World's largest integrated zinc producer, world's largest zinc mine at Rampura Agucha, among top 10 silver producers, among lowest-cost zinc producers, world's 2nd largest zinc & lead reserves and resources with 25+ years of mine life, ranked 1st in Metals & Mining in S&P Global CSA 2025 for the 3rd consecutive year, Asia's first low-carbon 'green' zinc producer, and first Indian company to join ICMM. A bottom box adds: India's only integrated producer of zinc and lead, India's only integrated and listed primary silver company, c.74% expected domestic primary zinc market share, and consistently rated AAA by CRISIL Ratings Limited.
Large rounded panel with an aerial plant photo and gradient overlay; big white headline at left over a worker standing next to metal ingots; a 2x4 grid of green circular icons with text on the right; white callout bar across the bottom with four columns; source footnote.
Mine data as of 31 March 2026: Rampura Agucha reserves 45.1 MnT, resources 17.7 MnT, grade Zn 9.6%/Pb 1.5%, FY26 ore production 5.08 MTPA; Sindesar Khurd 35.2/54.7 MnT, 5.43 MTPA; Rajpura Dariba 65.9/29.9 MnT, 1.03 MTPA; Zawar 62.7/103.7 MnT, 4.36 MTPA with 90.00 MW captive power; Kayad 1.8/9.8 MnT, 0.72 MTPA; Bamnia Kalan 8.4/33.7 MnT. Smelters: Chanderiya (hydro zinc 489,500 TPA, pyro zinc 105,000 TPA, pyro lead 90,000 TPA, 290.00 MW captive power), Dariba (hydro zinc 250,000 TPA, lead 120,000 TPA, 170.00 MW), Debari (hydro zinc 89,500 TPA), and Pantnagar (100% RE grid power, silver refining 800 TPA); wind power capacity 273.50 MW. A bottom value-chain strip runs Explore, Mine, Beneficiate, Smelt, Refine, Deliver.
Left column lists six mines with colour-coded bars and data rows; centre map of India with Rajasthan highlighted in blue and location pins connected by leader lines; right column lists smelters and plants; bottom six-step process strip with icons and arrows.
GDP growth bar chart (2025 / 2026f / 2027f): World 3.5/3/3.4, USA 2.1/2.3/2.2, Euro Area 1.4/0.9/1.2, Japan 1.1/0.6/0.7, China 5/4.6/4.1, India 7.7/6.4/6.7. A global manufacturing PMI line chart (Apr-24 to Sep-26) shows India highest and all regions largely in expansion; individual PMI values are not labelled and cannot be read precisely. Government capex in ₹ lakh Cr rises from 4.1 (FY21) to 12.2 (FY27 BE), with grants for capital assets from 2.3 to 4.9; capex rose 2.6 times in six years and FY27 effective capex is proposed at ~4.4% of GDP, the highest ever.
Two-panel top row with gradient header bars: grouped bar chart on the left, multi-line PMI chart on the right with two bullet notes; bottom band with a triangle-peak chart of capex and grants by fiscal year plus two bullet points on the right.
India's crude steel production capacity (MnT) grows from 34 (FY2000) to 48, 75, 110, 157, 205 (FY2025) and 300 (FY2030). End-user sectors: ₹ 11.21 trillion government infrastructure capex in FY2026, 7.9% YoY passenger vehicle growth with record FY2026 sales, 54.6 GW renewable capacity added in FY2026, and 11.6% manufacturing GVA growth. Takeaways: Indian zinc demand to double in 5-10 years, global zinc demand to grow at 1.4% CAGR, mined supply to decline sharply post-2030, falling grades (6.9% in the 1990s to 2.8%), and constrained smelter capacity growth.
Left: gradient header bar over a triangle-peak column chart, with the final FY2030 peak in green; right: dark photo-backed panel listing four sectors with line icons; bottom: full-width gradient band with five timeline-dot bullet points.
Silver capacity rises from 800 TPA to 1,500 TPA via a new 700 TPA silver refinery. Refined metal capacity goes from 1.1 MTPA today (Zinc 0.9, Lead 0.2) to 1.4 MTPA by FY29 through a +265 KTPA integrated zinc smelter at Debari (commissioning by 2QFY29), then to 2.0 MTPA in 3-5 years (Zinc 1.6 MTPA, Lead 0.4 MTPA) with a further +700 KTPA (500 KTPA zinc smelter, 200 KTPA lead smelter). Notes say the c.₹ 80,000 crore includes the earlier approved phase-1, the new smelters, silver refinery and required mine and milling expansion; the 88 KTPA Debari cell house will be discontinued, and an additional ₹ 3,823 crore goes to a Rampura Agucha tailings reprocessing plant.
Headline with the investment figure in green; horizontal arrow bar for silver capacity from 800 to 1,500; below, four step-up cards left to right (1.1 MTPA, +265 KTPA, +700 KTPA, 2.0 MTPA) with a brace grouping the first two; footnotes at the bottom.
Mining & milling capacity (MTPA, existing + approved = post-expansion): Rampura Agucha & Kayad 6.5 + 1.5 = 8.0; Sindesar Khurd 6.5 + 1.0 = 7.5; Rajpura Dariba 1.1 + 5.4 = 6.5; Bamnia Kalan 0 + 3.5 = 3.5; Zawar 5.2 + 4.3 = 9.5; total ore 19.3 + 15.7 = 35.0. Smelting (KTPA): zinc 934 + 765 = 1,611 (after discontinuing the 88 KTPA Debari cell house), lead 210 + 200 = 410, total 1,144 + 965 = 2,021; silver refining 800 + 700 = 1,500 TPA. Ore capacities are conceptual-plan estimates and may change with further detailing.
Full-width data table with five columns (Expansion Area, UOM, Existing Capacity, Board Approved Expansion, Capacity Post Expansion), alternating blue and green column shading, and gradient section-divider rows for Mining & Milling and Smelting; footnotes below.
Four pillars. Global/India leadership: largest integrated zinc producer, top 10 silver producer, world's 2nd largest zinc & lead R&R (~7% mine grade), ~74% primary zinc and ~92% primary lead market share, India's only primary silver producer. Growth vision: 2.0 MTPA refined metal, 1,500 TPA silver, c.700 KTPA value-added products, India's first 10 MTPA tailings reprocessing plant, critical minerals (Tungsten, REE, Yttrium & Potash), 510 KTPA fertilizer plant, 25+ years mine life. Financial strength (lowest cost, cash generation, margins, dividends, AAA rating, ROCE & ROE) and sustainability (No.1 S&P CSA three years, first Indian ICMM member, 70% renewable power by FY28, Net Zero by 2050 or earlier, EcoZen ~75% lower carbon footprint, 2.6 million lives impacted across 4,149 villages).
Four equal columns, each topped by a square blue-green gradient icon tile and a bracket line, with a bold heading, green underline and bullet list on a soft green gradient card; abbreviation footnote at bottom.
Investor call on Monday, Nov 16, 2026 at 14:15 hours (IST), where senior management will discuss the growth plan approved by the Board. Universal access numbers are +91 22 6280 1340 and +91 22 7115 8241; playback dial-in +91 22 7194 5757, playback dates November 16 - November 23, playback code 09007#. Contacts are the Director - Investor Relations, Head Corporate Communications and Deputy Manager - Investor Relations, with the general IR email hzl.ir@vedanta.co.in.
Wide green-to-blue gradient banner with phone icon and call summary; lower left a two-column dial-in table with alternating blue and green rows; lower right a light rounded contact card with three named contacts and email links.
Closing slide with 'Thank You', Vedanta and Hindustan Zinc logos and the investor relations email hzl.ir@vedanta.co.in. No financial data.
Full-bleed underground mine photo of three smiling workers in safety gear with headlamps on the left; translucent blue panel on the right with logos, green accent bar, large white-and-green 'Thank You' and an email line.
Common questions about this slide and the underlying presentation content.
It is the 'Hindustan Zinc Limited 2.0' project announcement. The Board approved expansion projects with an overall investment of c.₹ 80,000 crore over 3-5 years, taking refined metal capacity from 1.1 MTPA to 2.0 MTPA and silver refining capacity from 800 TPA to 1,500 TPA.
Hindustan Zinc Ltd (Vedanta group; NSE: HINDZINC, BSE: 500188) filed it with BSE and NSE on November 16, 2026, together with a cover letter on the capacity-expansion decision. This version contains the 11 presentation slides without the cover letter.
Total ore production capacity rises from 19.3 MTPA to 35.0 MTPA. Total smelting capacity rises from 1,144 KTPA to 2,021 KTPA (zinc 1,611 KTPA, lead 410 KTPA), and silver refining rises from 800 TPA to 1,500 TPA.
A +265 KTPA integrated zinc smelter at Debari is expected to be commissioned by 2QFY29, bringing refined metal capacity to 1.4 MTPA by FY29. A 500 KTPA zinc smelter, a 200 KTPA lead smelter and a 700 TPA silver refinery are expected to be commissioned in 3-5 years.
Per the slide note, it covers the earlier approved phase-1, the new zinc and lead smelters and the silver refinery, plus the required mine and milling expansion. A further ₹ 3,823 crore is going into a Rampura Agucha tailings reprocessing plant.
The deck cites India's GDP growth (7.7% in 2025), government capex rising to ₹ 12.2 lakh Cr in FY27 (BE), and crude steel capacity growing to 300 MnT by FY2030. It also cites construction, autos, renewables and manufacturing demand, an expected doubling of Indian zinc demand in 5-10 years, and tightening global mined zinc supply after 2030.
The call was held on Monday, November 16, 2026 at 14:15 IST. Playback was available from November 16 to November 23 on +91 22 7194 5757 with code 09007#.
Rampura Agucha & Kayad (to 8.0 MTPA), Sindesar Khurd (to 7.5 MTPA), Rajpura Dariba (to 6.5 MTPA), the new Bamnia Kalan mine (3.5 MTPA) and Zawar (to 9.5 MTPA). The deck notes these are conceptual-plan estimates that may change with further detailing.
Create Your Own Slides
Turn your ideas into professional presentations in seconds with 2slides AI.
Reference professional designs, choose your style, and generate slides with perfect text rendering. Powered by Nano Banana—start creating your presentation now.
Your AI Agent for slides. Save time, shine faster with intelligent presentation creation.
All services online© 2026 2slides. All rights reserved.