Adani Power Investor Presentation November 2026 - the 36-page USD edition of Adani Power Ltd's updated investor presentation (BSE: 533096 / NSE: ADANIPOWER), filed with BSE and NSE on 17 November 2026 (an INR edition was filed the same day). It profiles India's largest private thermal power producer: the India power-demand backdrop, the Adani portfolio, APL's 18,330 MW operating fleet and 42,050 MW target capacity, six investment highlights, capital structure and credit ratings, ESG, governance and historical financials in US$.

2 curtidas
0 downloads

Usa a capa desta apresentação como referência de estilo para slides criados a partir do seu próprio conteúdo. Ou escolha qualquer página abaixo para usar o layout dela como referência.

Navegação Rápida

Tags

Adani Power
ADANIPOWER
Investor presentation
BSE 533096
NSE

Compartilhar os slides

Descrição

Tópico Principal

Adani Power Investor Presentation November 2026 - the 36-page USD edition of Adani Power Ltd's updated investor presentation (BSE: 533096 / NSE: ADANIPOWER), filed with BSE and NSE on 17 November 2026 (an INR edition was filed the same day). It profiles India's largest private thermal power producer: the India power-demand backdrop, the Adani portfolio, APL's 18,330 MW operating fleet and 42,050 MW target capacity, six investment highlights, capital structure and credit ratings, ESG, governance and historical financials in US$.

Benefícios Principais

  • •Official, exchange-filed disclosure (filed with BSE/NSE on 17 Nov 2026) presented in US$ for international readers
  • •Plant-by-plant view of operating, acquired and locked-in thermal capacity with PPA tie-up, fuel and commissioning-date details
  • •H1 FY27 and FY26 key financial metrics, six years of P&L and balance sheet data in US$ Mn
  • •Clear explanation of the two-part availability-based tariff, fuel management and execution risk mitigation model
  • •Credit-rating track record, debt maturity profile and funding plan for the growth capex
  • •Well-structured investor-deck layouts (KPI tiles, maps, tables, charts, photo galleries) that can serve as a design reference

Público-Alvo

  • •Equity investors and fund managers following Indian power utilities
  • •Sell-side and buy-side analysts covering thermal and baseload generation
  • •Energy-sector researchers and consultants studying India's coal-based power capacity
  • •Credit analysts and lenders reviewing leverage, ratings and debt maturities
  • •Designers and finance teams looking for an investor-presentation template and layout reference

Casos de Uso

  • •Researching Adani Power's capacity pipeline, PPA tie-ups and locked-in growth projects
  • •Comparing APL's financial metrics (revenue, EBITDA, PAT, net debt to EBITDA) with other power producers
  • •Understanding India's electricity demand outlook and the role of coal in baseload supply
  • •Benchmarking ESG disclosures, board composition and governance practices
  • •Using the slide structure as a model for a corporate investor deck

Propostas de Valor Únicas

  • •USD edition of an exchange-filed investor deck, with US$ Mn figures and disclosed INR/USD conversion rates on the financial slides
  • •Covers the full story from macro opportunity to asset-level detail, funding plan and governance in 36 slides
  • •Includes asset maps, plant cards with COD dates, PPA and FSA data and project-gallery photos
  • •Shows long-range targets (45 GW by FY 2031-32, nuclear 10 GW by 2035, Bhutan hydro 5,000 MW) alongside current financials

Páginas de Slides (36)

Visualização detalhada de cada página de slide, incluindo layout, conteúdo principal e elementos visuais.

Página 1
Title / Cover

Cover - Adani Power Limited Investor Presentation [USD] | Nov 2026

Conteúdo

Cover slide reading 'Adani Power Limited - Investor Presentation [USD] | Nov 2026' with the adani logo and the 'Growth With Goodness' tagline.

Estrutura do Layout

Full-bleed illustrated artwork with title block and gradient rule at the right, logo and tagline at top left

Elementos Visuais Principais

  • •adani logo with tagline
  • •colorful illustration of people, ports, power lines, wind turbines and highway
  • •gradient underline beneath the title
Página 2
Agenda / Table of Contents

Contents

Conteúdo

Agenda listing 1 Executive Summary, 2 Key Investment Highlights, 3 ESG, and Annexures.

Estrutura do Layout

Minimal right-aligned numbered list with dotted separators on a white background

Elementos Visuais Principais

  • •numbered list with dotted dividers
  • •blue title
  • •thin purple header rule
Página 3
Section Divider

Section divider - 1 Executive Summary

Conteúdo

Section divider slide for '1 Executive Summary'.

Estrutura do Layout

Large light-grey section number above a bold grey title, right-aligned on white

Elementos Visuais Principais

  • •oversized numeral 1
  • •bold section title
  • •header rule
Página 4
Market Overview / Infographic

India | Colossal Growth Opportunity

Conteúdo

States India's real GDP grew 7.1% in FY25 and is estimated at 7.8% in FY26, with a target of ~$35 Tn GDP by 2047. Panels cover the fastest-growing economy and consumer base, air-travel and logistics gaps, electricity consumption, a decarbonisation and CAD table in USD b, UPI at 242 bn transactions in FY26 and the $1.2 bn India AI Mission.

Estrutura do Layout

Key-highlights column on the left; 2x4 grid of titled chart/table panels with takeaway captions on the right

Elementos Visuais Principais

  • •bar charts with country flags
  • •CAD balance table in USD b
  • •UPI and Aadhaar logos
  • •oval KPI badges (242 bn, >49%)
  • •light-blue takeaway banners
Página 5
Market Overview / Infographic

India | Electricity Sector - Multi-decade Investment Opportunity

Conteúdo

Indian installed capacity is shown at 344 GW (FY18), 532 GW (FY26) and 1,000 GW (FY32E), with a $500 Bn+ investment opportunity by FY32. Adani Power's baseload row shows 10.4, 18.1 and 42.1 GW (FY18, FY26, FY32E) and a $20 Bn+ investment plan by FY32.

Estrutura do Layout

Left: sector facts and mini bar charts per segment; right: Adani business logos with CAGR, multiple-vs-industry tags and investment plan; closing banner

Elementos Visuais Principais

  • •FY18/FY26/FY32E bar charts
  • •CAGR chevrons
  • •Adani Renewables, Power and Energy Solutions logos
  • •navy summary banner
Página 6
Org Chart / Structure

Adani Portfolio: A World Class Infrastructure & Utility Portfolio

Conteúdo

Organisation chart of the Adani portfolio showing listed companies such as AGEL, APL (74.96%), AESL, ATGL, APSEZ, Ambuja Cements and NDTV with promoter holding percentages. Banner reads 'A multi-decade story of high growth centered around infrastructure & utility core'.

Estrutura do Layout

Column-based org chart by category (Flagship, Energy & Utility, Transport & Logistics, Primary Industry, Other) with a highlighted unlisted-businesses box and long footnotes

Elementos Visuais Principais

  • •category headers
  • •company boxes with ownership percentages
  • •APL box highlighted with green outline
  • •legend for listed cos and direct consumer
Página 7
Company Snapshot / KPI Dashboard

Adani Power Limited ("APL"): India's Largest Private Base Load Power Company

Conteúdo

APL shows 18,330 MW installed capacity across 13 assets, 23,720 MW locked-in and a 45 GW target. H1 FY27 revenue is $4,129 Mn (+27% YoY), EBITDA $1,799 Mn and PAT $1,250 Mn; FY26 revenue is $6,553 Mn, EBITDA $2,653 Mn and PAT $1,469 Mn. Net debt of $4,820 Mn gives 1.91x net debt to continuing EBITDA (Sep'26 TTM).

Estrutura do Layout

Left: India map with plant callouts and capacity equation legend; right: two columns of KPI tiles (asset details, H1 FY27 vs FY26 financials)

Elementos Visuais Principais

  • •India map with operating, locked-in and greenfield markers
  • •plant-wise MW callouts
  • •KPI tiles with YoY arrows
  • •capacity equation legend (Operating + Locked-in + Proposed = Target)
Página 8
Key Highlights / Value Proposition

APL: Key Investment Highlights

Conteúdo

Summary of six numbered highlights under 'Inbuilt, Irreplicable Structural Advantages drive APL as the Best Power Generation Play in India', including an 18.33 GW portfolio across 9 states, 90%+ plant availability, a 40% EBITDA margin and 100% BTG ordering for 23.7 GW of projects. Side callouts say APL is a market leader for baseload power.

Estrutura do Layout

Six numbered navy label boxes at left with bullet panels, two callout boxes at right

Elementos Visuais Principais

  • •numbered circle badges 1-6
  • •navy label blocks
  • •bold-keyword bullets
  • •right-hand callout cards
Página 9
Section Divider

Section divider - 2 Key Investment Highlights

Conteúdo

Section divider slide for '2 Key Investment Highlights'.

Estrutura do Layout

Large light-grey numeral above a bold grey title, right-aligned

Elementos Visuais Principais

  • •oversized numeral 2
  • •bold section title
  • •header rule
Página 10
Data Table / Market Analysis

Coal is Critical for India's Base load power needs: Strong growth potential as India Catches Up

Conteúdo

Shows a per-capita electricity consumption table by state against an India average of 1,460 kWh per person, and a Vision 2047 demand view of 6,400 BU energy, 708 GW peak and 2,100 GW installed capacity. Thermal PPA bids: 30 GW of coal allocations, 22.2 GW awarded by State Discoms of which 15.3 GW to APL, with a state table totalling 22,240 MW awarded and 15,265 MW to APL.

Estrutura do Layout

Three columns: state consumption table with bullets; demand/renewables panels with two pie charts; thermal PPA KPIs and state table

Elementos Visuais Principais

  • •state table
  • •two capacity-mix pie charts (Sept '26 and FY32E)
  • •KPI boxes
  • •PPA award table by state
Página 11
Asset Portfolio / Capacity Bridge

Diversified Asset Portfolio: 10,840 MW of Modern and Efficient Organic Capacity

Conteúdo

Capacity build-up bars: 10,840 MW executed organic, 7,450 MW inorganic, 18,330 MW current operating, 23,720 MW ongoing organic expansion and 42,050 MW target. Plant cards for Mundra (4,620 MW), Tiroda (3,300 MW), Kawai (1,320 MW) and Godda (1,600 MW) list PPA tie-ups, fuel and COD dates, plus 1,600 MW under development.

Estrutura do Layout

Left: capacity bridge columns; right: four plant photo cards with specification rows

Elementos Visuais Principais

  • •capacity bridge bar chart
  • •plant photographs
  • •spec rows (MW, PPA, fuel, COD)
  • •under-development call-out
Página 12
Asset Portfolio

Diversified Asset Portfolio: Proven Capabilities in Acquisition, Integration, and Turnaround of Assets

Conteúdo

Banner reads 7,450 MW of inorganic thermal capacity: 4,370 MW of rapidly turned-around assets (Udupi, Raipur, Raigarh, Mahan) and 3,080 MW of recent additions (Korba, Mutiara, Dahanu, Butibori, Churk). Each plant card shows MW, PPA tie-up, FSA volume and COD; several carry 3,200 MW or 2,920 MW under development.

Estrutura do Layout

Nine plant photo cards in two groups under a navy banner, with under-development boxes beneath

Elementos Visuais Principais

  • •nine plant photos
  • •state labels
  • •PPA/FSA/COD rows
  • •+ MW under-development boxes
Página 13
Case Study

Diversified Asset Portfolio: Turnaround Case Studies of Acquired Stressed Assets

Conteúdo

Three case studies: Mahan Energen (1,200 MW acquired March '22 for $330 Mn, cumulative EBITDA $852 Mn), Raipur plant (1,370 MW, $468 Mn acquisition cost, cumulative EBITDA $1,347 Mn) and Raigarh plant (600 MW, $160 Mn, cumulative EBITDA $535 Mn). Targets are 4,400 MW by 2030, 4,570 MW by 2031 and 3,800 MW by 2031 respectively.

Estrutura do Layout

Three equal columns, each with KPI tile cluster, plant photo and a 'turnaround story' bullet box

Elementos Visuais Principais

  • •KPI tiles (acquisition cost, EBITDA)
  • •plant photographs
  • •turnaround story text boxes
Página 14
Operations / KPI

Operational Excellence: Operational Performance Metrics

Conteúdo

Covers 8 states and 13 thermal plants with 7,400 MW subcritical, 9,290 MW supercritical and 1,600 MW ultra-supercritical capacity. FY26 plant availability is 88% and continuing EBITDA margin is 40%; the closing banner credits AI-enabled O&M driven by AIMSL.

Estrutura do Layout

Top: control-room photo beside navy bullet panel; bottom: three flow blocks (scale, availability, margin) linked by chevrons

Elementos Visuais Principais

  • •control-room photograph
  • •KPI tiles
  • •chevron flow arrows
  • •navy bottom banner
Página 15
Chart / Market Analysis

Operational Excellence: Competitive and Profitable Assets in Long-term and Short-term Markets

Conteúdo

Left chart compares state merit-order variable-charge ranges with APL's variable charge under PPAs (for example Gujarat 7.28 high, 1.09 low and APL 6.06). Right chart shows bilateral, exchange and APL volumes (BU) with average tariffs (Rs./kWh) for 2019-20 to 2025-26; the 2025-26 bilateral tariff is as of Jan 2026.

Estrutura do Layout

Two halves each with chart on top and two label-plus-bullet rows beneath

Elementos Visuais Principais

  • •merit-order range chart with state labels
  • •combo bar-and-line chart with printed data labels
  • •legend keys
  • •light-blue label boxes
Página 16
Process / Infographic with Map

Operational Excellence: Fuel Management & Logistics - Key Competitive Advantages

Conteúdo

Six numbered advantages include entry into commercial mining with 14 MTPA capacity, handling approx. 74 MTPA coal and 22 MTPA fly ash, and more than 18,500 rake equivalents of fuel handled annually. A map marks APL plants, mines, imported-coal ports and PPA counterparty states.

Estrutura do Layout

Left: six chevron rows with icons and numbers; right: annotated India map with legend

Elementos Visuais Principais

  • •six icon rows 01-06
  • •India map with plant, mine and port markers
  • •dashed imported-coal routes
  • •legend
Página 17
Table / Project Pipeline

Locked-in Growth: Secured Project Portfolio of Developed Sites & Critical Equipment Availability

Conteúdo

Strategic advantages tiles show 60% brownfield, 70% near-pithead, 100% land available and 100% BTG ordering, with 22.4 GW of BTG sets ordered in advance. The project table lists 12 projects with an organic total of 23,720 MW, 100% land and equipment, 87% environmental clearance and 14,640 MW of PPAs signed.

Estrutura do Layout

Left: KPI tiles and three text boxes on derisked execution; right: checkmark matrix by project

Elementos Visuais Principais

  • •four KPI tiles
  • •green checkmark matrix
  • •In progress / Bids ongoing status cells
  • •totals row
Página 18
Chart / Pipeline

Locked-in Growth: Growing set of opportunities for private sector participation

Conteúdo

Tie-up chart runs from 18,330 MW installed to a 42,050 MW target, with 14,640 MW of new PPAs and 9,080 MW tie-ups in progress. Upcoming long-term PPA bids total 16,660 MW across Uttar Pradesh, Gujarat, West Bengal, Rajasthan and Andhra Pradesh; states have awarded 20.9 GW of PPAs from FY 2024-25 onwards, of which APL has won 13.9 GW.

Estrutura do Layout

Left: two stacked bridge charts (tie-up status, capacity expansion timeline); right: bid table and demand-outlook box

Elementos Visuais Principais

  • •waterfall-style bridge charts
  • •bid invitation table (Issued / Awaited)
  • •legend
  • •demand outlook callout
Página 19
Process / Capability Overview

Adani Execution Engine: Project Management & Assurance Group (PMAG)

Conteúdo

States $76.3 Bn cumulative capex by the Adani Portfolio during FY20-FY26, with yearly bars labelled 3, 5, 13, 12, 8, 15 and 20 (In USD Bn). Also covers institutionalised project execution, risk mitigation across execution, time and cost, credit and liquidity, and an integrated vendor ecosystem.

Estrutura do Layout

Left: activity / performance / risk-mitigation matrix with three photos; right: capex bar chart and two-column vendor ecosystem panel

Elementos Visuais Principais

  • •three project photos (port, HVDC line, renewable cluster)
  • •capex bar chart
  • •rotated row labels
  • •vendor ecosystem columns
Página 20
Risk / Strategy Matrix

Adani Execution Engine: Execution Risk Mitigation - What We Are Doing Differently

Conteúdo

Nine-box grid under Execution Assurance, Fuel Assurance and Finance Assurance. Points include 22.4 GW BTG advance booking, APL developing four coal mines with 14 MTPA capacity, 95% capacity under PPAs with two-part availability-based tariff, and AA rating by four leading domestic rating agencies.

Estrutura do Layout

3x3 card grid with navy column headers and bullet text

Elementos Visuais Principais

  • •three column headers
  • •nine alternating blue and grey cards
  • •bullet lists
Página 21
Business Model / Revenue Visibility

Massive Addressable Market: Long term revenue visibility and margin stability

Conteúdo

Headline: 'Secure Business Model with 90%+ Capacity Tied-up in Long Term Contracts'. Existing capacity is 95% tied up under PPAs with 5% supplying short-term demand; 14.6 GW of PPAs tied up by APL with 16+ GW of bids ongoing. First-year capacity charges under recent PPAs are shown as Rs 2.89/kWh (FY 2020-21), Rs 3.60-3.73/kWh (FY 2024-25) and Rs 4.11-4.30/kWh (FY 2025-26 onwards).

Estrutura do Layout

Left KPI tiles, centre three bullet panels, right tariff list, flow strip of three boxes at the bottom

Elementos Visuais Principais

  • •KPI tiles (95%, 5%, 14.6 GW, 16+ GW)
  • •navy panel headers
  • •tariff bullet list
  • •three-step chevron flow
Página 22
Financial Chart / Capital Structure

Capital Structure: Strong Cashflow Generation Enables Fully Funded Growth Over the Next 8 years

Conteúdo

FY26 FFO walk (In USD Mn) goes from EBITDA 2,653 less finance cost (372) with tax paid 12 to FFO 2,293; FFO plus cash balances is 3,259 versus 3,252 in FY25. The debt maturity profile spans FY27 to FY36 and is covered by FFO and cash; text cites ability to fund $21 Bn capex over the next 7 years and $16 Bn aggregate FFO.

Estrutura do Layout

Left: FFO waterfall and FFO+cash stacked bars; centre: debt maturity bars on shaded envelope; right: bullet panel

Elementos Visuais Principais

  • •FFO waterfall
  • •stacked FFO and cash bars with +0.2% tag
  • •debt maturity bar chart with labelled values
  • •navy bottom banner
Página 23
Credit / Financial Metrics

Capital Structure: Strong Financials Power Self-Funded Growth with Low Leverage & High Cashflows

Conteúdo

Rating track record table (March 2023, March 2025, November 2026) shows CareEdge, India Ratings and ICRA at AA+/Stable and Crisil at AA/Stable in November 2026, a 9-notch upgrade over 7 years. Net debt to continuing EBITDA fell from 9.75x (FY19) to 1.91x (Sep'26 TTM); net debt is $4,820 Mn versus $6,644 Mn in FY19.

Estrutura do Layout

Top-left rating-record badge and table; right rating highlights and KPI tiles; bottom combo chart

Elementos Visuais Principais

  • •rating agency logos table
  • •9 notches badge
  • •net debt and EBITDA combo chart with labels
  • •before-and-after KPI tiles
Página 24
Strategy / Roadmap

APL: Target 2035 and beyond...

Conteúdo

Three growth tracks: base load expansion to 45 GW by FY 2031-32 (23.7 GW ongoing at an estimated Rs 2 Trillion capex, plus 3 GW further additions), 5,000 MW hydro in Bhutan with two projects totalling 1,340 MW at 49:51 APL:DGPC, and nuclear via Adani Atomic Energy Ltd. targeting 10 GW by 2035.

Estrutura do Layout

Three stacked text cards at left with matching line-art illustrations on the right

Elementos Visuais Principais

  • •three grey cards with blue headings
  • •arrow bullets
  • •line-art thermal, hydro and nuclear plants
Página 25
Section Divider

Section divider - 3 ESG

Conteúdo

Section divider slide for '3 ESG'.

Estrutura do Layout

Large light-grey numeral above bold grey title, right-aligned

Elementos Visuais Principais

  • •oversized numeral 3
  • •ESG title
  • •header rule
Página 26
ESG / Sustainability

APL: ESG Highlights

Conteúdo

Targets include reducing GHG emission intensity to 0.84 tCO2e/MWh by FY27 (FY26 average 0.86), 100% Single-use-Plastic-Free certification and zero health and safety related injuries. Ratings cited: 71/100 in S&P Global CSA (sector average 41/100), NSRA ESG rating 66, Sustainalytics 31.7, FTSE Russell 4.3/5.0 and CareEdge 80/100. A green 'Updated' tag marks the slide.

Estrutura do Layout

Four columns: material topic, targets, initiatives and achievements, UN SDG icon grid

Elementos Visuais Principais

  • •material topic cards with icons
  • •target KPI cards
  • •17-goal style UN SDG tile grid (goals 1-15 shown)
  • •green 'Updated' badge
Página 27
Governance / Team

APL: Board of Directors and Management Overview

Conteúdo

Governance slide with a committee matrix, stats (40% of the board comprised of only Independent Directors, 100% of statutory committees chaired by Independent Directors), four independent directors and four non-independent directors including Chairman Gautam Adani. A box lists pathways to strengthen corporate governance.

Estrutura do Layout

Left: committee checkmark matrix, stats and governance box; right: grid of director portraits with experience and skills

Elementos Visuais Principais

  • •checkbox committee matrix
  • •circular director portraits
  • •chair icons
  • •governance pathway box
Página 28
Closing / Thank You

Thank You (end of main presentation)

Conteúdo

Closing 'Thank You' slide concluding the main body before the annexures.

Estrutura do Layout

Single bold navy title on a white background, bottom-right

Elementos Visuais Principais

  • •large navy 'Thank You' text
  • •blank white background
Página 29
Section Divider

Annexures (section divider)

Conteúdo

Divider slide titled 'Annexures' introducing the appendix.

Estrutura do Layout

Bold navy title at bottom-right under a header rule

Elementos Visuais Principais

  • •navy 'Annexures' title
  • •header rule
Página 30
Financial Table

APL: Historical Financials | Profit and Loss Account

Conteúdo

Table of operating metrics and P&L from FY22 to H1 FY27 in USD Mn, for example revenue from operations 6,142 (FY26) and 4,031 (H1 FY27), EBITDA 2,653 and 1,799, and PAT 1,469 and 1,250. Side tiles highlight 18,330 MW operating capacity, 44% EBITDA margin, and 3Y CAGRs of 15% (EBITDA) and 3% (PAT).

Estrutura do Layout

Left: dense financial table with CAGR column; right: Q2 FY27 insight KPIs

Elementos Visuais Principais

  • •multi-year P&L table
  • •highlighted bold subtotal rows
  • •blue percentage rows
  • •KPI sidebar with CAGR arrows
Página 31
Financial Table

APL: Historical Financials | Balance Sheet

Conteúdo

Balance sheet from 31 Mar 2022 to 31 Sep 2026 in USD Mn, with total assets of 16,112 (Mar 2026) and 17,318 (Sep 2026), total equity of 7,519 and 8,200. Side KPIs: $15,977 Mn fixed assets incl. CWIP, $1,676 Mn cash, RoA 19.1%, RoCE 21.7% and RoE 26.5% (Sep '26 TTM).

Estrutura do Layout

Left: assets and liabilities table with ratio rows; right: Q2 FY27 insight KPIs

Elementos Visuais Principais

  • •balance sheet table
  • •red accumulated depreciation row
  • •ratio rows
  • •KPI sidebar
Página 32
Industry / Fuel Analysis

Coal is Critical for India: Coal is Key to Long-Term Reliability and Affordability of Base Load Supply

Conteúdo

Charts show installed capacity (222 GW coal and 25 GW gas in 2024-25 versus 84 and 17 in 2009-10), 2024-25 coal consumption of 1,270 MT (83% domestic) and gas consumption of 71,314 MMSCM (50% imports). Reserves: 437 Billion Tonnes of coal and 1,094 Billion Cubic Meters of gas; the banner says coal anchors baseload power.

Estrutura do Layout

Top: three chart panels; middle: four numbered reason rows with icons; bottom banner

Elementos Visuais Principais

  • •stacked bar charts with labels
  • •reserves KPI boxes
  • •numbered reason rows
  • •navy banner
Página 33
Portfolio Mix / Infographic

APL: High Quality Present Portfolio Mix: Poised to Meet India's Base Load Demand

Conteúdo

Operating capacity of 14 assets and 18,330 MW plus locked-in capacity of 13 projects and 23,720 MW equals target capacity of 18 assets and 42,050 MW. Operating mix is 59% organic and 41% inorganic with 95% PPA tie-ups; locked-in capacity is 100% organic with 62% PPA tie-ups; ongoing thermal PPA bids are 16+ GW.

Estrutura do Layout

Three columns joined by plus and equals signs, each with stacked horizontal percentage bars for asset type, technology and PPA status

Elementos Visuais Principais

  • •adani Power logo
  • •stacked percentage bars
  • •plus and equals connectors
  • •navy bottom banner
Página 34
Photo Gallery

Project Gallery: Showcasing Execution Excellence Across Large & Complex Projects

Conteúdo

Photo gallery of Mahan Phase-II (2 x 800 MW), Raipur Phase-II (2 x 800 MW), Raigarh Phase-II (2 x 800 MW) and Korba Phase-II (2 x 660 MW), each with three construction images such as boiler structures, a control room and chimney wind shield.

Estrutura do Layout

Four columns with navy project headers and three captioned photos each

Elementos Visuais Principais

  • •12 construction photographs
  • •captions above images
  • •navy header blocks
  • •dashed column dividers
Página 35
Disclaimer / Legal

Disclaimer

Conteúdo

Legal disclaimer stating the presentation contains forward-looking statements, does not constitute an offer of securities, and that APL makes no representation on accuracy; securities may not be offered in the United States without registration.

Estrutura do Layout

Single page of justified paragraph text under a header rule

Elementos Visuais Principais

  • •four dense text paragraphs
  • •page number
Página 36
Closing / Thank You

Thank You (closing slide)

Conteúdo

Final 'Thank You' closing slide.

Estrutura do Layout

Single bold navy title on a white background, bottom-right

Elementos Visuais Principais

  • •large navy 'Thank You' text
  • •blank white background

Perguntas Frequentes

Perguntas comuns sobre este slide e o conteúdo da apresentação subjacente.

What is the Adani Power Investor Presentation November 2026?

It is the 36-page investor presentation of Adani Power Ltd (BSE: 533096 / NSE: ADANIPOWER), filed with BSE and NSE on 17 November 2026. This is the USD edition; an INR version was filed the same day. It covers India's power-sector opportunity, APL's assets, investment highlights, capital structure, ESG and financials.

What are Adani Power's key capacity figures in this deck?

The deck shows 18,330 MW of installed capacity across 13 assets (slide 7), 23,720 MW of locked-in capacity and a 42,050 MW target; slide 7 also cites a 45 GW target. Slide 33 describes the operating portfolio as 14 assets, so asset counts differ between slides. Slide 24 targets 45 GW of base load capacity by FY 2031-32.

What financial results does the deck report in US dollars?

Slide 7 reports H1 FY27 revenue of $4,129 Mn, EBITDA of $1,799 Mn and PAT of $1,250 Mn, versus FY26 revenue of $6,553 Mn, EBITDA of $2,653 Mn and PAT of $1,469 Mn. Net debt is $4,820 Mn, or 1.91x continuing EBITDA (Sep'26 TTM). Slides 30 and 31 give multi-year P&L and balance sheet tables.

What are Adani Power's credit ratings?

Slide 23 lists November 2026 ratings of AA+/Stable from CareEdge, India Ratings and ICRA, and AA/Stable from Crisil. It describes a 9-notch upgrade over the last 7 years, with coverage growing from one rating agency to four.

Does the presentation cover growth beyond thermal power?

Yes. Slide 24 outlines entry into hydroelectric power in Bhutan (5,000 MW in partnership with DGPC, with agreements for two projects totalling 1,340 MW) and nuclear power through Adani Atomic Energy Ltd., targeting 10 GW by 2035.

What is the difference between the USD and INR versions?

Both were filed with the exchanges on 17 November 2026. The USD edition converts financial figures into US$ Mn or US$ Bn, using the INR/USD rates printed in the slide footnotes, while many tariff and capex items remain quoted in rupees. Use the USD edition for comparisons with international peers.

Can I use this deck as an investor presentation template?

The deck is a useful layout reference: section dividers, KPI tiles, annotated maps, bridge and combo charts, financial tables, photo galleries and a director grid. The content is Adani Power's own filed material, so use it for study and design inspiration, and replace all company content, branding and figures in your own deck.

Is this presentation investment advice?

No. Slide 35 states that the presentation contains forward-looking statements, is not an offer or recommendation to buy or sell shares, and that past performance is not indicative of future results. Readers should consult the original exchange filing and make their own assessment.

2slides

Create Your Own Slides

Turn your ideas into professional presentations in seconds with 2slides AI.

Crie Slides de Classe Mundial em Segundos

Referencie designs profissionais, escolha seu estilo e gere slides com renderização de texto perfeita. Alimentado por Nano Banana—comece a criar sua apresentação agora.

2Slides logo

Seu Agente IA para slides. Economize tempo, brilhe mais rápido com criação inteligente de apresentações.

Resumir com IA

ChatGPTClaudeGrokPerplexity
Todos os serviços online

Produtos

Recursos

Comparação

Galeria

Modelos

Integrações

Recursos

Comparação

Galeria

© 2026 2slides. Todos os direitos reservados.