شعار 2Slides
Preview

IGO Q1 FY2027 Results Presentation

15 شرائح

ضمن مجموعة أمثلة عروض المستثمرين

IGO Limited 1Q27 Results Presentation (Q1 FY2027, July–September 2026), lodged with the ASX: Nova nickel-copper operation's final full quarter, record spodumene production at Greenbushes, the Kwinana lithium hydroxide refinery, Group financial results and strategic priorities. Amounts are in Australian dollars (A$) unless noted.

6 إعجاب
0 تحميل

يستخدم غلاف هذا العرض مرجعًا للنمط لإنشاء شرائح من محتواك الخاص. أو اختر أي صفحة أدناه لاستخدام تخطيطها مرجعًا.

التنقل السريع

العلامات

IGO Limited
IGO 1Q27 results
Quarterly results presentation
ASX investor presentation
Australia investor presentation

مشاركة الشرائح

الوصف

الموضوع الرئيسي

IGO Limited 1Q27 Results Presentation (Q1 FY2027, July–September 2026), lodged with the ASX: Nova nickel-copper operation's final full quarter, record spodumene production at Greenbushes, the Kwinana lithium hydroxide refinery, Group financial results and strategic priorities. Amounts are in Australian dollars (A$) unless noted.

الفوائد الرئيسية

  • •Real ASX-lodged quarterly results deck from an Australian battery-metals miner, 15 slides in a clean navy-and-orange corporate style
  • •Shows how to pair a headline KPI panel with a 1Q27 vs 4Q26 quarter-on-quarter table on every operating-asset slide
  • •Covers the full quarterly narrative arc: results summary, safety, each asset, financials, priorities, summary, contacts and disclaimer
  • •Includes a life-of-mine legacy slide celebrating the closure of the Nova operation, a useful model for asset wind-down communication
  • •Downloadable as both the original PDF and an editable PPTX conversion

الجمهور المستهدف

  • •Investor relations teams at ASX-listed mining and resources companies
  • •Equity analysts and investors covering lithium, nickel and battery-metals stocks
  • •Finance and strategy professionals preparing quarterly results presentations
  • •Students and researchers studying the Australian lithium sector (Greenbushes, Kwinana, Tianqi Lithium Energy Australia)

حالات الاستخدام

  • •Quarterly activities or results presentation for a listed miner
  • •Asset-by-asset operating update with production, cost and EBITDA tables
  • •Safety performance reporting with a TRIFR trend line chart
  • •Mine closure or divestment legacy slide with life-of-mine statistics
  • •Reference for how a joint-venture (equity-accounted) interest is presented alongside wholly owned operations

عروض القيمة الفريدة

  • •Consistent slide grammar: navy title, grey subtitle line, gradient rule, left column of orange-tabbed KPI cards, right column of navy-header data table with the current quarter shaded light blue
  • •Combines hard numbers (record 435kt spodumene, $2.00/lb Nova cash cost, A$376M cash) with full-bleed people photography celebrating the Nova workforce
  • •Clear separation of 100%-basis joint venture data (TLEA: Greenbushes, Kwinana) from IGO's own results

صفحات الشرائح (15)

عرض تفصيلي لكل صفحة شريحة، بما في ذلك التخطيط والمحتوى الرئيسي والعناصر المرئية.

الصفحة 1
Title slide

1Q27 Results Presentation – IGO Limited

المحتوى

Cover slide titled '1Q27 Results Presentation, IGO Limited', dated 'IGO Limited | 29 October 2026', over a photograph of an orange underground haul truck (TRZ0323) loaded with ore on a dirt haul road.

هيكل التخطيط

Full-bleed landscape photograph with a white rounded pill-shaped band across the lower third carrying the navy title and subtitle; circular navy IGO logo in the top-right corner; date in white at bottom-left; faint vertical 'personal use only' watermark along the left edge (ASX lodgement stamp).

العناصر المرئية الرئيسية

  • •Full-bleed mining photo
  • •Rounded white title band
  • •Circular navy logo badge
  • •Large bold navy headline
الصفحة 2
Executive summary / key highlights

Results summary

المحتوى

Strong operational performance from Nova and Greenbushes. Four themes: Safety (50% reduction in TRIFR over 12 months; focus on critical risk management as Nova ramps down and demobilises); Nova recorded strong final quarter (nickel production up 19%, copper production up 27%, Nova EBITDA of $56M, production at top end of LOM guidance and cash cost below the bottom end of LOM guidance); Greenbushes delivered record production (record quarterly spodumene concentrate production of 435kt, CGP3 achieved nameplate, 83% EBITDA margin); Strong financial results (Group underlying EBITDA of $176M, up 49% QoQ; net cash of A$376M).

هيكل التخطيط

Title and subtitle above a navy-to-grey gradient rule, then four equal light-grey cards each topped by an orange bar, a site photograph, an orange uppercase headline and orange-bulleted text.

العناصر المرئية الرئيسية

  • •Four-column card grid
  • •Orange top accent bars
  • •Site photographs per card
  • •Uppercase orange card headings
الصفحة 3
Data visualization / KPI slide

Safety

المحتوى

Sustained focus on safety performance. YoY improvement: 50% lower Group 12-month TRIFR. September quarter result: 2 recordable injuries at Nova; TRIFR rose to 4.0 during the quarter. Focus: maintaining critical risk management while completing ramp-down and demobilisation from Nova. Line chart 'TRIFR Performance to 30 September 2026' – Nova Operation 12.5, 9.9, 7.1, 5.3, 5.5 and IGO Group 8.0, 6.5, 4.9, 3.7, 4.0 for Sep-25, Dec-25, Mar-26, Jun-26, Sep-26.

هيكل التخطيط

Left half: three stacked grey KPI cards with orange left border (large navy number plus description). Right half: two-series smoothed line chart with data labels and legend.

العناصر المرئية الرئيسية

  • •Big-number callouts (50%, 2)
  • •Two-line trend chart in orange and navy
  • •Data point labels
  • •Orange left-border cards
الصفحة 4
Operational performance / data table

Nova

المحتوى

Outstanding final full quarter from Nova. Production 4,635t nickel (up 19% QoQ) and 2,144t copper (up 27% QoQ), reflecting stronger mining performance and higher mill runtime. Cash cost (payable) $2.00/lb, down 55% QoQ on higher production and by-product prices and lower costs. Underlying EBITDA $56M; free cash flow $67M. Table 1Q27 vs 4Q26: nickel production 4,635 vs 3,882t (+19%); nickel sales 4,576 vs 3,372t (+36%); copper production 2,144 vs 1,694t (+27%); copper sales 1,845 vs 2,645t (−30%); cash cost (payable) A$2.00 vs 4.49/lb Ni (−55%); underlying EBITDA A$56M vs 31M (+83%); realised nickel price A$22,961 vs 24,702/t (−7%); realised copper price A$22,494 vs 18,889/t (+19%). Footnotes define payable cash cost and note underlying EBITDA is non-IFRS.

هيكل التخطيط

Left column of three KPI cards (production, cash cost, EBITDA/free cash flow side by side); right column a five-column data table with navy header row and the 1Q27 column shaded light blue; colour-coded up/down triangles in the % change column; footnotes beneath.

العناصر المرئية الرئيسية

  • •Large tonnage callouts
  • •QoQ comparison table
  • •Highlighted current-quarter column
  • •Up/down arrow indicators
الصفحة 5
Image / team celebration slide

Nova workforce celebration (photo slide)

المحتوى

Photo-only slide marking the end of Nova: a large group of workers in hi-vis orange and navy cheering in front of a haul truck at the mine portal, plus two smaller images – a haul truck climbing the open-cut ramp, and two workers posing in front of truck TRZ0323 at the portal.

هيكل التخطيط

Photo collage: one large image filling the left two-thirds and two stacked images on the right; logo top-right; page number bottom-right; no text.

العناصر المرئية الرئيسية

  • •Group photo of workforce
  • •Three-image collage
  • •Hi-vis orange colour echoing brand accent
الصفحة 6
Image / people and culture slide

Nova team (photo slide)

المحتوى

Second photo-only slide showing Nova crews clapping and smiling at the portal under a yellow gantry structure – four candid crowd shots celebrating the operation's final period.

هيكل التخطيط

2×2 grid of equal photographs centred on a white page, logo top-right, no text.

العناصر المرئية الرئيسية

  • •2×2 photo grid
  • •Candid workforce portraits
  • •Hi-vis PPE colours
الصفحة 7
Milestone / legacy summary with statistics strip

Nova's Legacy

المحتوى

A decade of contribution to IGO, with sustained performance to the end. Four cards: high-quality, low-cost operation (maintained strong production and cost performance despite the nickel price downturn in 2023/24); strong performance to the end (on track to beat life-of-mine production and cost guidance); contribution to people and partners (created over 480 direct jobs, developed and operated in partnership with the Ngadju Traditional Owners); Nova to continue under new ownership (secured divestment to Global Lithium Resources post closure, enabling future lithium production). Life of mine statistics: 14Mt ore mined, 221kt nickel produced, 99kt copper produced, $5.4B cumulative revenue, $2.9B free cash flow, $242M royalties paid.

هيكل التخطيط

Four icon cards in a row (orange line icons: shield, target, handshake, recycle bin) above a full-width grey band with six large navy statistics and grey labels.

العناصر المرئية الرئيسية

  • •Orange line icons
  • •Four-column card row
  • •Six-figure statistics band
  • •Large navy numerals
الصفحة 8
Operational performance / joint venture asset

Greenbushes

المحتوى

Record production and lower costs as CGP3 reaches sustained nameplate (TLEA and IGO logos shown). 1Q27 production 435kt, up 12% QoQ on higher grade and improved recovery; cash costs $418/t, down 7% QoQ, EBITDA margin increased to 83%; CGP3 ramp-up – nameplate production achieved in September; dividend A$680M quarterly dividend to shareholders (100%) reflecting strong cash generation. Table (100% basis) 1Q27 vs 4Q26: spodumene production 435 vs 387kt (+12%); spodumene sales 376 vs 391kt (−4%); mined grade 1.77 vs 1.68% Li2O (+5%); cash cost (production) A$418 vs 448/t (−7%); average realised price US$2,130 vs 2,286/t (−7%); EBITDA margin 83% vs 80%; capex A$51M vs 42M. Footnotes define cash cost (production) and capex.

هيكل التخطيط

Same template as the Nova slide: four orange-tabbed KPI cards on the left, navy-header comparison table with shaded 1Q27 column on the right, footnotes below; dual logo lock-up (TLEA wordmark + IGO badge) top-right.

العناصر المرئية الرئيسية

  • •Dual partner logos
  • •KPI cards with big numbers
  • •QoQ data table
  • •Record-production callout
الصفحة 9
Operational performance / turnaround update

Kwinana

المحتوى

Production performance improving; conversion costs remain elevated. 1Q27 production: major shutdown complete, production has resumed. Conversion costs 17% lower at A$33,677/t due to shutdown. EBITDA: A$65M loss, driven by NRV adjustment and lower hydroxide prices. Table (100% basis) 1Q27 vs 4Q26: lithium hydroxide production 918 vs 897t (+2%); lithium hydroxide sales 926 vs 864t (+7%); conversion cost (production) A$33,677 vs 40,670/t (−17%); sales revenue A$23.1M vs 23.9M (−3%); EBITDA A$(65.4)M vs (88.4)M (+26%); capex A$14.2M vs 26.7M. Footnotes define conversion cost (excluding spodumene purchases and Lithium Industry Support Program funding) and capex.

هيكل التخطيط

Three KPI text cards on the left (text statements rather than big numbers), navy-header table on the right with shaded current-quarter column, footnotes beneath; TLEA and IGO logos top-right.

العناصر المرئية الرئيسية

  • •Bracketed negative values
  • •QoQ comparison table
  • •Orange left-border text cards
الصفحة 10
Financial summary / data table

Financial results

المحتوى

Strong earnings performance; balance sheet remains strong with A$376M cash. Underlying EBITDA $176M, up 49%, supported by Nova and positive investment revaluations; revenue $158M, up 12% on higher Nova nickel sales and copper price; balance sheet $376M, strong cash balance to fund growth. Table 1Q27 vs 4Q26 (A$M): sales revenue 158 vs 141 (+12%); Nova EBITDA 56 vs 31 (+83%); share of net profit/(loss) of TLEA 114 vs 121 (−5%); EBITDA 176 vs 118 (+50%); underlying EBITDA 176 vs 118 (+49%); underlying free cash flow 40 vs 70 (−43%); cash 376 vs 387 (−3%). Footnotes: results are unaudited and underlying measures are non-IFRS; TLEA is the JV between IGO (49%) and Tianqi Lithium Corporation (51%); underlying EBITDA includes a $31.9M mark-to-market gain on listed investments in 1Q27 (4Q26: $9.6M loss); free cash flow before exclusions was a net inflow of $39.8M (1Q27) and $64.0M (4Q26).

هيكل التخطيط

Three big-number KPI cards on the left, seven-row navy-header financial table on the right, and a full-width block of four numbered footnotes at the bottom.

العناصر المرئية الرئيسية

  • •Large A$ figures with small 'M' suffix
  • •Financial comparison table
  • •Detailed footnotes on non-IFRS measures
الصفحة 11
Strategy / priorities slide

Priorities

المحتوى

Optimise our existing portfolio and position for growth. 1) Unlock value from our lithium business – support JV partners to deliver full value from Greenbushes; agree a pathway for Kwinana with Tianqi Lithium Corporation. 2) Maximise value from non-core assets – complete the divestment of Nova to Global Lithium Resources; assess value realisation opportunities from Cosmos; continue to rationalise non-core exploration assets. 3) Advance growth opportunities – build a pipeline of advanced copper and lithium exploration projects; progress technical and commercial development of BioHeap copper leach technology; consider selective copper and lithium M&A with discipline.

هيكل التخطيط

Three numbered columns, each headed by a navy circle with a white numeral and an orange uppercase heading, over a tall grey panel with an orange left border and bulleted text.

العناصر المرئية الرئيسية

  • •Numbered navy circles
  • •Three-column priority framework
  • •Orange bullets
الصفحة 12
Conclusion / recap

Summary

المحتوى

Strong performance from Nova and Greenbushes; IGO well positioned for growth. Safety: Group TRIFR of 4.0, down 50% year on year; quarterly increase reinforces focus on critical risks. Nova: nickel production rose 19% in the final full quarter; cash costs fell 55% to $2.00/lb. Greenbushes: record 435kt production, up 12% quarter on quarter; CGP3 reached nameplate in September. Financial: underlying EBITDA of $176M, up 49%; net cash of $376M and underlying free cash flow of $40M. Kwinana: 918t production following completion of major shutdown; conversion costs fell 17% to $33,677/t. Growth: disciplined growth focused on copper and lithium; BioHeap testing continues towards a trial heap.

هيكل التخطيط

2×3 grid of horizontal cards, each with a thumbnail photo on the left, an orange uppercase heading and two bullets; orange left border on each card.

العناصر المرئية الرئيسية

  • •Six thumbnail-and-text cards
  • •Site and people photography
  • •Consistent orange accents
الصفحة 13
Contact / closing slide

Investors & Media

المحتوى

Contact slide: Richard Glass, Head of Strategy and Investor Relations, T: +61 8 9238 8300, E: investor.relations@igo.com.au. 'Authorised for release to the ASX by Managing Director and CEO, Ivan Vella.'

هيكل التخطيط

Strip of four equal portrait photographs of IGO employees (lab, control room, drill site, underground) across the middle, with the contact block and an orange vertical rule below.

العناصر المرئية الرئيسية

  • •Four-photo people strip
  • •Contact details block
  • •ASX release authorisation line
الصفحة 14
Disclaimer / legal

Cautionary Statements & Disclaimer

المحتوى

Legal disclaimer: prepared by IGO Limited (ABN 46 092 786 304); not an offer of securities; forward-looking statements and risk factors; quarterly financial results are unaudited and all currency amounts are in Australian dollars unless noted; definitions of net cash, nickel cash costs, lithium cash costs (COGS and production), underlying EBITDA and free cash flow; IGO holds a 49% interest in Tianqi Lithium Energy Australia Pty Ltd (TLEA) and recognises its share of TLEA net profit after tax.

هيكل التخطيط

Dense three-column bulleted small-text layout under a large navy heading.

العناصر المرئية الرئيسية

  • •Three-column body text
  • •Bold navy heading
الصفحة 15
Closing / brand statement

Making a Difference

المحتوى

Brand back-cover: IGO's purpose statement about people power, clean energy and battery storage technology enabling renewable energy, ending with 'We are the IGO Difference.'

هيكل التخطيط

Soft blue-to-lavender gradient background; large two-line navy headline on the left, two columns of grey body copy on the right; logo top-right.

العناصر المرئية الرئيسية

  • •Pastel gradient background
  • •Oversized headline
  • •Two-column manifesto text

الأسئلة الشائعة

أسئلة شائعة حول هذه الشريحة ومحتوى العرض التقديمي الأساسي.

What is the IGO 1Q27 Results Presentation?

It is IGO Limited's 15-slide results presentation for the first quarter of its 2027 financial year (July–September 2026), lodged with the ASX and dated 29 October 2026. It covers safety, the Nova nickel-copper operation, the Greenbushes lithium mine, the Kwinana lithium hydroxide refinery, Group financial results and strategic priorities.

What period does Q1 FY2027 cover for an Australian company like IGO?

IGO's financial year runs from July to June, so FY27 covers July 2026 to June 2027 and the first quarter (1Q27) is July–September 2026. The comparison quarter shown in the tables, 4Q26, is April–June 2026.

What were the headline numbers in the deck?

Group underlying EBITDA was A$176M (up 49% QoQ), sales revenue A$158M, cash A$376M and underlying free cash flow A$40M. Greenbushes produced a record 435kt of spodumene concentrate, and Nova produced 4,635t of nickel at a payable cash cost of $2.00/lb.

Are Greenbushes and Kwinana figures IGO's share?

No. The Greenbushes and Kwinana tables are on a 100% basis. IGO holds 49% of Tianqi Lithium Energy Australia (TLEA), the joint venture with Tianqi Lithium Corporation (51%), and recognises its share of TLEA's net profit (A$114M in 1Q27) in its own results.

What currency are the figures in?

All amounts are in Australian dollars (A$) unless otherwise noted, per the disclaimer. The exception is the Greenbushes average realised spodumene price, quoted in US$/t (US$2,130/t in 1Q27).

Can I download and edit this presentation?

Yes. The page offers the original PDF as lodged with the ASX and an editable PPTX version converted from it, so you can reuse the navy-and-orange KPI-card plus data-table layout for your own quarterly results deck. The PPTX is a machine conversion, so check fonts and alignment after opening.

Why does the deck include photo-only slides about Nova?

1Q27 was Nova's final full quarter before closure. IGO used two photo slides and a 'Nova's Legacy' slide to recognise the workforce and summarise life-of-mine results: 14Mt ore mined, 221kt nickel, 99kt copper, $5.4B cumulative revenue and $2.9B free cash flow. Nova is being divested to Global Lithium Resources.

What does the 'personal use only' text on every slide mean?

It is a watermark stamped by the ASX announcements platform on lodged documents. It is not part of IGO's own design and can be ignored when using the layout as a template.

المصادر وقراءات إضافية

2slides

Create Your Own Slides

Turn your ideas into professional presentations in seconds with 2slides AI.

أنشئ شرائح من الطراز العالمي في ثوانٍ

راجع التصاميم الاحترافية، اختر أسلوبك، وأنشئ شرائح بعرض نصي مثالي. مدعوم بـ Nano Banana—ابدأ في إنشاء عرضك التقديمي الآن.

2Slides logo

وكيل الذكاء الاصطناعي الخاص بك للشرائح. وفر الوقت، أشرق بشكل أسرع مع إنشاء عروض تقديمية ذكية.

تلخيص باستخدام الذكاء الاصطناعي

ChatGPTClaudeGrokPerplexity
جميع الخدمات تعمل

المنتجات

الميزات

المعرض

القوالب

التكاملات

الموارد

مقارنة

© 2026 2slides. جميع الحقوق محفوظة.