2Slides 로고
Preview

Bellevue Gold Investor Presentation November 2026

24 슬라이드

수록 모음: 투자자 발표자료 사례 · 호주 기업 IR 자료 예시

Bellevue Gold Investor Presentation November 2026 — Bellevue Gold Limited (ASX: BGL) presentation "Delivering, De-Risked & Unlocking Upside", given at the UBS Mining Conference in November 2026 and lodged with the ASX. It presents the Western Australian high-grade underground gold producer's FY27 guidance of 150–170koz at an AISC of A$2,800–A$3,100/oz (all amounts in Australian dollars unless stated), A$213M cash and gold against A$100M bank debt, a hedge book cut to 57.5koz, a 2.7Moz Mineral Resource and 1.0Moz Ore Reserve, and plans for exploration and disciplined growth.

7 좋아요
0 다운로드

이 프레젠테이션의 표지를 스타일 참고 자료로 사용해 내 콘텐츠로 슬라이드를 만듭니다. 아래에서 원하는 페이지를 골라 그 레이아웃을 참고로 쓸 수도 있습니다.

빠른 탐색

태그

Investor presentation
Gold mining
Mining conference
Bellevue Gold
Australia

슬라이드 공유

설명

주요 주제

Bellevue Gold Investor Presentation November 2026 — Bellevue Gold Limited (ASX: BGL) presentation "Delivering, De-Risked & Unlocking Upside", given at the UBS Mining Conference in November 2026 and lodged with the ASX. It presents the Western Australian high-grade underground gold producer's FY27 guidance of 150–170koz at an AISC of A$2,800–A$3,100/oz (all amounts in Australian dollars unless stated), A$213M cash and gold against A$100M bank debt, a hedge book cut to 57.5koz, a 2.7Moz Mineral Resource and 1.0Moz Ore Reserve, and plans for exploration and disciplined growth.

주요 이점

  • •Shows a complete mining-company investor story in 24 slides: compliance pages, capital structure, investment case, FY27 priorities, operations, balance sheet, exploration, growth, sustainability and a JORC resource appendix
  • •Real operating and financial figures to learn from: FY27 guidance, Q1 FY27 production of 35.6koz, processing recovery of about 95%, net cash of A$113.2M and a hedge book reduction schedule
  • •Strong examples of mining visuals: a regional geology map, a colour-coded long-section mine plan out to FY35, drill-hole intercept diagrams and line-of-lode exploration sections
  • •Combines charts of net cash, underlying free cash flow and hedge book trends with clear Delivering / De-Risked / Unlocking Upside message framing
  • •Includes ESG content: net zero (Scope 1 and 2) emissions at the Bellevue Gold Project, the 2026 Golden Gecko Award and supplying gold to regild St Paul's Cathedral

대상 청중

  • •Investor relations teams at ASX-listed mining and resources companies
  • •Gold mining executives preparing materials for broker and mining conferences
  • •Equity analysts and institutional investors covering Australian gold producers
  • •Corporate finance and strategy professionals in the resources sector
  • •Presentation designers building decks for industrial or natural-resources clients

사용 사례

  • •Investor presentation at a broker-hosted mining conference
  • •Quarterly or half-year update for shareholders of a gold producer
  • •Showing a mining company's shift from development to steady production and free cash flow
  • •Reporting balance sheet strength and hedge book reduction to the market
  • •Presenting exploration targets and resource-to-reserve conversion potential
  • •Reference for laying out JORC-compliant Mineral Resource and Ore Reserve tables

고유한 가치 제안

  • •A real ASX-lodged deck from a producing gold miner, not a generic template
  • •A three-part narrative (Delivering, De-Risked, Unlocking Upside) that runs from the cover through to the summary slide
  • •Technical mining visuals (long sections, DHEM plates, mined-versus-planned colour coding) sit alongside clean financial tables
  • •Shows how a miner can tell a story of becoming hedge-free with a combined bar-and-trend chart
  • •Gold-and-cream brand palette with photographic section slides that suit premium resources branding

슬라이드 페이지 (24)

레이아웃, 주요 콘텐츠 및 시각적 요소를 포함한 각 슬라이드 페이지의 상세 보기.

페이지 1
title slide

Delivering, De-Risked & Unlocking Upside

콘텐츠

Cover slide for Bellevue Gold's UBS Mining Conference presentation, November 2026, with the tagline "Delivering, De-Risked & Unlocking Upside" and the company values Passion, Accountability, Care and Excellence.

레이아웃 구조

Diagonal split: a full-bleed underground photo on the left and a cream panel on the right holding the logo, headline, event name and date

주요 시각적 요소

  • •Underground mine face photo with two geologists in hi-vis
  • •Gold-bar Bellevue Gold logo
  • •Large three-line headline
  • •Gold serif event name
  • •Values strip at the bottom
페이지 2
disclaimer / legal

Disclaimers & Compliance Statements

콘텐츠

Legal disclaimer stating the presentation was prepared by Bellevue Gold Limited (ABN 99 110 439 686, ASX: BGL) and authorised by the Managing Director & CEO. It covers the general disclaimer, not an offer, summary information and not investment advice.

레이아웃 구조

Two-column text layout under a serif title, with a full-width authorisation line above

주요 시각적 요소

  • •Bold section subheadings
  • •Faint repeating logo watermark pattern
  • •Logo in the top-right corner
페이지 3
disclaimer / legal

Disclaimers & Compliance Statements (Forward-Looking & Net Zero)

콘텐츠

Forward-looking statements notice, including that FY27 guidance assumes a gold price of A$5,700/oz to value royalties. Also explains how net zero (Scope 1 and 2) emissions for CY25 and FY26 were achieved at the Bellevue Gold Project using on-site renewables, LGCs and ACCUs.

레이아웃 구조

Dense two-column text, with forward-looking information on the left and the net zero statement on the right

주요 시각적 요소

  • •Bulleted list of forward-looking topics
  • •Section subheadings
  • •Watermark pattern
페이지 4
disclaimer / legal

Disclaimers & Compliance Statements (JORC, Risk & Financial Data)

콘텐츠

JORC Code compliance statement referencing the 21 September 2026 Annual Resource & Reserve Statement, plus investment risk, past performance and rounding notes. It confirms all dollar values are Australian dollars (A$) unless otherwise stated and that the financial data is unaudited.

레이아웃 구조

Two-column text, with JORC on the left and risk, financial data and rounding on the right

주요 시각적 요소

  • •Bold subheadings
  • •Watermark pattern
  • •Page number
페이지 5
company overview / capital structure

Capital Structure | Board & Management

콘텐츠

Market capitalisation of A$2,103M (US$1,472M) at a A$1.41 share price on 6 November 2026, with A$213M cash and gold and A$100M bank debt. Australian institutions hold 34% of the register and retail/other 22%. The company is in the ASX200, GDX and GDXJ, and the slide lists the board, management and covering analysts.

레이아웃 구조

Split screen: on the left a capital table, shareholder donut chart and analyst logos; on the right lists of board and management names and roles over a dark gold photo

주요 시각적 요소

  • •A$/US$ capital table
  • •Shareholder donut chart with legend
  • •Grid of analyst broker logos
  • •Board and management name lists
  • •Index inclusions line
페이지 6
investment highlights

Bellevue: A high-quality gold business built for growth

콘텐츠

Investment case for a long-life, high-grade producer in Western Australia's Yilgarn Craton: a 1.0Moz Ore Reserve and 2.7Moz Mineral Resource, A$213 million cash and gold, record production and free cash flow in FY26, and net zero (Scope 1 and 2) emissions achieved in FY26.

레이아웃 구조

Large regional map on the left, with five icon-led value pillars stacked on the right

주요 시각적 요소

  • •Regional geology map showing nearby gold mines and the Yandal Project
  • •Western Australia inset map
  • •Five gold icon tiles
  • •Yellow highlight headings
페이지 7
strategy / priorities

FY27 Priorities: Delivering, De-Risked & Unlocking Upside

콘텐츠

Bellevue has moved from building the operation to generating sustainable production and cash flow. Six FY27 priorities sit in three columns (Delivering, De-Risking, Growth & Returns), including becoming hedge-free during FY27.

레이아웃 구조

Three-column grid with two icon-led priorities per column and an arrow flow along the bottom

주요 시각적 요소

  • •Dark photo background of a hand holding a gold bar
  • •Gold serif column headers
  • •Six icon blocks
  • •Arrow flow: Operational Delivery → Financial Strength → Shareholder Returns
페이지 8
guidance / operational update

Growing Production | Q1: Contractor Transition

콘텐츠

FY27 guidance is 150–170koz of production at an AISC of A$2,800–A$3,100/oz, with growth capex of $90–100M and an exploration budget of $25–30M. Q1 produced 35.6koz during the changeover to underground contractor Barminco on 1 August 2026, and guidance is on track with production rising in H2 FY27.

레이아웃 구조

Two panels: on the left a trapezoid guidance callout with supporting bullets; on the right Q1 performance and operational focus bullets

주요 시각적 요소

  • •Gold trapezoid FY27 guidance box
  • •Centred bullet list
  • •Gold square bullets with section headers
  • •Footnoted ASX announcement references
페이지 9
technical diagram / mine plan

Delivering: Established in key mining areas

콘텐츠

Five established mining areas, with mine designs extending to about 2035, provide operational visibility. The long section colour-codes mined areas and planned stoping for FY27, FY28–29 and FY30–35 across Tribune, Viago, Southern Belle, Deacon Main, Deacon North, Marceline and Armand, with the orebody marked as open.

레이아웃 구조

Three bullets across the top, a full-width 3D mine long section in the middle and a closing tagline at the bottom

주요 시각적 요소

  • •3D underground mine long section
  • •Colour legend for mined, FY27, FY28–29 and FY30–35
  • •Mining area name labels
  • •"OPEN" arrows and a 1km scale bar
페이지 10
technical results / drilling

Delivering: Deacon North established

콘텐츠

The new high-grade Deacon North mining area is delivering ore on schedule, with stoping ramping up through FY27. Recent infill results include 9.3m @ 62.1g/t, 4.6m @ 50.3g/t and 5.2m @ 32.1g/t gold.

레이아웃 구조

Two technical diagrams side by side, with a boxed strip of eight drill intercepts below

주요 시각적 요소

  • •Long section of Deacon and Deacon North stope outlines
  • •High-grade shoot plan with grade-control intercept labels
  • •Legend for established and potential shoots
  • •Eight-result intercept panel
페이지 11
data visualization / operations

Delivering: Processing

콘텐츠

A standard gravity-CIL plant with 3-stage crushing and ball milling achieves about 95% recovery (about 70% by gravity) while using roughly 1.2Mtpa of its 1.35Mtpa capacity. Quarterly recovery rose from 89.8% in Mar-24 to a peak of 96.1% in Dec-25 and was 94.9% in Sep-26.

레이아웃 구조

Dark overlay on the left with bullets and a bar chart; an aerial plant photo on the right with labelled circuits

주요 시각적 요소

  • •Quarterly recovery bar chart from Mar-24 to Sep-26
  • •Aerial processing plant photo
  • •Callout tags for FOB, Crushing Circuit, Gravity Circuit, Ball Mill and CIL
  • •Gold banner headline
페이지 12
financial table / balance sheet

De-Risked: Strong balance sheet with growing flexibility

콘텐츠

At 30 September 2026 the company held A$213.2M cash and gold against A$100.0M bank debt, giving net cash of A$113.2M. Remaining forward contracts total 57,500oz at an average A$3,061/oz, due between 30 September 2027 and 31 March 2028, and the company is targeting a hedge-free position during FY27.

레이아웃 구조

Two columns with gold banner headers, each with a data table and bullets underneath

주요 시각적 요소

  • •Cash, debt and hedges summary table
  • •Hedge delivery schedule table
  • •Gold banner section headers
  • •Bold key takeaway bullet
페이지 13
data visualization / trend chart

De-Risked: Growing balance sheet, shrinking liabilities

콘텐츠

Six quarters of underlying free cash flow, from 4QFY25 to 1QFY27: A$67M, A$33M, A$62M, A$158M, A$110M and A$48M. Over the same period the hedge book fell from 152koz to 57.5koz while net cash rose. Lower Q1 FY27 FCF is attributed to the contractor change and paste plant funding.

레이아웃 구조

Full-width combination chart with a highlighted target box and annotated latest quarter

주요 시각적 요소

  • •Clustered bars for FCF, net cash and hedge book
  • •Hedge book and net cash trend lines with dashed extensions
  • •"Target: Hedge free during FY27" callout
  • •Dashed highlight around 1QFY27
페이지 14
exploration / geology

Growth: Exploration has recommenced at Bellevue

콘텐츠

Roughly 4Moz has been mined and defined to date, and mineralisation is open down plunge. Diamond drilling hit 3.4m at 18.45g/t Au at Westralia, about 140m from Marceline, and 3.5m at 44.96g/t Au at Tribune South, with targeting aided by DHEM surveys.

레이아웃 구조

Bullets and a cross-section diagram on the left; a tall exploration domains plan map on the right

주요 시각적 요소

  • •Geological cross section with DHEM plates and mineralised trends
  • •Exploration domains plan map
  • •Circled Westralia and Tribune South targets
  • •Gold banner map title
페이지 15
exploration / technical diagram

Exploration Upside: Bellevue Line of Lode

콘텐츠

The Bellevue Lode extends down plunge under Lake Miranda, and untested DHEM plates sit up plunge from the Southern Belle Resource. The Southern Belle Decline and Viago Drill Drive will test these extensions.

레이아웃 구조

Two bullet columns above a full-width geological long section, with a legend strip below

주요 시각적 요소

  • •Long section from Armand through Historic Bellevue to Southern Belle
  • •Resource outlines and interpreted extensions
  • •Viago Lode dashed flat-lode line
  • •DHEM plates and planned decline paths
페이지 16
exploration / technical diagram

Exploration Upside: Deacon Line of Lode

콘텐츠

Deacon and Deacon North are the highest-grade mining areas at Bellevue. Deacon South is defined by a DHEM target and historical surface drilling beyond the Conn Selmer Fault.

레이아웃 구조

Two bullets above a full-width long section, with a legend strip below

주요 시각적 요소

  • •Long section of Marceline, Deacon Main, Deacon North and Deacon South
  • •Lucien Lode dashed line
  • •Conn Selmer Fault
  • •Viago Production Decline path
페이지 17
exploration / technical diagram

Exploration Upside: Tribune Line of Lode

콘텐츠

Underground drilling has restarted at Tribune South and a sixth underground rig is arriving. June 2026 quarter extensional drilling returned 3.50m @ 44.96g/t and 1.71m @ 7.80g/t, with the Southern Belle Decline enabling staged exploration under Lake Miranda.

레이아웃 구조

Bullets in two columns above a full-width long section with a highlighted drilling box

주요 시각적 요소

  • •Long section of Tribune North, Main and South
  • •Dashed yellow box marking June quarter drilling
  • •Red drill-hole markers with grade labels
  • •Vlad Lode and SOB Decline
페이지 18
strategy / roadmap

Unlocking Upside: Disciplined Growth

콘텐츠

A three-step growth plan: optimise the current operation to fill the mill at 1.35Mtpa, develop expansion opportunities (plant and underground capacity, infrastructure), and grow the mine through exploration and resource-to-reserve conversion.

레이아웃 구조

Photo on the left with a diagonal gold divider; numbered steps with sub-bullets on the right and a gold banner conclusion

주요 시각적 요소

  • •Conveyor belt photo with a worker in hi-vis
  • •Three numbered gold headings
  • •Gold banner takeaway
페이지 19
ESG / sustainability

Sustainability: Better for business

콘텐츠

Positions Bellevue as a net zero (Scope 1 and 2) gold producer and lists six business benefits around "Building a more resilient business": next-generation workforce, investor appetite, lower fuel cost and supply risk, green gold premium, lower emissions, and energy security.

레이아웃 구조

Radial layout: a central statement surrounded by six icon-and-label benefits, with a closing tagline

주요 시각적 요소

  • •Sunset sky background
  • •Six gold-bar icons
  • •Large central serif statement
  • •"A net zero gold producer" tagline
페이지 20
achievements / recognition

Sustainability: Better for business (Recognition)

콘텐츠

Bellevue Gold won the 2026 Golden Gecko Award for net zero and renewable power at the Bellevue gold mine, and was chosen to supply gold to regild London's St Paul's Cathedral.

레이아웃 구조

Diagonal split: award trophy and certificate photo on the left, St Paul's Cathedral dome photo with a statement on the right

주요 시각적 요소

  • •Golden Gecko trophy and certificate
  • •St Paul's Cathedral dome photo
  • •Large serif statements
  • •Gold foil diagonal divider
페이지 21
conclusion / summary

Summary: Delivering, De-Risked, Unlocking upside

콘텐츠

Closing summary in three pillars. Delivering: consistent execution and guidance delivered. De-Risked: established platform, strong balance sheet and reduced execution risk. Unlocking upside: growing free cash flow, disciplined growth and exploration upside.

레이아웃 구조

Three icon-headed columns over a dark band, above a team photo

주요 시각적 요소

  • •Site team group photo in front of the processing plant
  • •Three gold-bar icons
  • •Yellow pillar headings with bullets
페이지 22
section divider

Appendices: Mineral Resource & Ore Reserve

콘텐츠

Section divider introducing the appendix on Mineral Resource and Ore Reserve estimates.

레이아웃 구조

Left-aligned section title over a faded site photo with large logo outline shapes

주요 시각적 요소

  • •Faded haul truck photo
  • •Oversized gold-bar logo outlines
  • •Gold serif "Appendices" title
페이지 23
data table / appendix

Mineral Resource & Ore Reserve Estimates

콘텐츠

Probable Ore Reserve of 6.8Mt @ 4.5g/t for 1.0Moz, using an A$3,250/oz gold price for cutoff. Total Mineral Resource of 9.8Mt @ 8.6g/t for 2.7Moz (Indicated 5.5Mt @ 9.3g/t for 1.6Moz; Inferred 4.3Mt @ 7.8g/t for 1.1Moz) at a 2.5g/t cutoff, with depletion to 1 March 2026.

레이아웃 구조

Two side-by-side tables (Reserves left, Resources right) over a dark photo

주요 시각적 요소

  • •Ore Reserve table
  • •Mineral Resource table
  • •Loader bucket photo background
  • •Footnotes on cutoff and depletion
페이지 24
closing / contact

Investor Contact

콘텐츠

Closing slide with the Bellevue Gold logo and investor contact details for Duncan Hughes, Chief Corporate Development Officer, on +61 8 6373 9000 or investors@bgl.gold.

레이아웃 구조

Full-bleed sky and plant photo with a centred logo and contact block in the bottom-right

주요 시각적 요소

  • •Large Bellevue Gold logo
  • •Blue sky photo with a worker and plant structure
  • •Gold foil diagonal edge
  • •Contact details block

자주 묻는 질문

이 슬라이드 및 기본 프레젠테이션 콘텐츠에 대한 일반적인 질문.

What is the Bellevue Gold Investor Presentation November 2026?

It is a 24-slide deck from Bellevue Gold Limited (ASX: BGL), titled "Delivering, De-Risked & Unlocking Upside", presented at the UBS Mining Conference in November 2026 and lodged with the ASX. It covers FY27 guidance, operations, the balance sheet and hedge book, exploration, growth plans, sustainability and the JORC Mineral Resource and Ore Reserve.

What does FY27 mean in this deck?

Bellevue reports on the Australian financial year, which runs July to June. FY26 is July 2025 to June 2026 and FY27 is July 2026 to June 2027, so "1QFY27" is the September 2026 quarter, and "hedge-free during FY27" means by 30 June 2027.

What currency are the figures in?

All dollar amounts are Australian dollars (A$) unless otherwise stated, and the deck keeps A$ and $M notation throughout. Some headline figures are also shown in US dollars at 1 AUD = 0.70 USD; for example, market capitalisation is A$2,103M, or US$1,472M.

What is Bellevue Gold's FY27 guidance?

Production of 150–170koz at an all-in sustaining cost of A$2,800–A$3,100/oz, growth capex of $90–100M and an exploration budget of $25–30M. Q1 FY27 delivered 35.6koz during the underground contractor changeover, and the company says guidance is on track, with production rising and capex falling in H2 FY27.

How strong is the balance sheet and hedge position?

At 30 September 2026 Bellevue had A$213.2M in cash and gold, A$100.0M of bank debt and net cash of A$113.2M. Remaining forward contracts total 57,500oz at an average A$3,061/oz, down from 152koz at 4QFY25, and the company is targeting a hedge-free position during FY27.

How large are the Mineral Resource and Ore Reserve?

The global Mineral Resource is 9.8Mt @ 8.6g/t for 2.7Moz (1.6Moz Indicated, 1.1Moz Inferred), reported at a 2.5g/t cutoff. The Ore Reserve is 6.8Mt @ 4.5g/t for 1.0Moz, using an A$3,250/oz gold price for cutoff grades. Both are reported under the JORC Code.

Which slides are most useful as design references?

The colour-coded mine-plan long section (slide 9), the drill intercept diagrams (slide 10), the combined net cash, FCF and hedge book trend chart (slide 13) and the hedge delivery table (slide 12). They show how to make technical mining data and financial de-risking easy for investors to read.

Who should use this deck as a template?

Investor relations and corporate teams at ASX-listed miners, resources analysts and presentation designers who need a model for a conference deck that combines guidance, balance sheet, exploration and ESG content under one clear three-part message.

2slides

Create Your Own Slides

Turn your ideas into professional presentations in seconds with 2slides AI.

몇 초 만에 세계적 수준의 슬라이드 만들기

전문 디자인을 참조하고, 스타일을 선택하며, 완벽한 텍스트 렌더링으로 슬라이드를 생성하세요. Nano Banana로 구동—지금 프레젠테이션 만들기를 시작하세요.

2Slides logo

슬라이드를 위한 AI 에이전트. 지능형 프레젠테이션 생성으로 시간을 절약하고 더 빠르게 빛나세요.

AI로 요약하기

ChatGPTClaudeGrokPerplexity
모든 서비스 정상 운영 중

제품

기능

갤러리

템플릿

연동

리소스

비교

© 2026 2slides. 모든 권리 보유.