Adani Enterprises Limited (AEL) Q2 FY27 earnings presentation (quarter ended 30 September 2026), filed with BSE/NSE on 28 October 2026. All amounts are in ₹ crore unless stated; India's FY27 runs from April 2026 to March 2027, so Q2 FY27 is July–September 2026 and H1-27 is April–September 2026. The 46-slide deck reports record half-year EBITDA of ₹11,958 crore (up 56% YoY), H1-27 total income of ₹71,569 crore (up 62%), and walks through AEL's incubation portfolio: Adani New Industries (solar and wind manufacturing), AdaniConneX data centers, Adani Airport Holdings, Adani Road Transport, mining services, IRM, commercial mining and the Mundra copper smelter, followed by debt, capex, ESG and governance detail.

9 좋아요
0 다운로드

이 프레젠테이션의 표지를 스타일 참고 자료로 사용해 내 콘텐츠로 슬라이드를 만듭니다. 아래에서 원하는 페이지를 골라 그 레이아웃을 참고로 쓸 수도 있습니다.

빠른 탐색

태그

Adani Enterprises
AEL
Adani Group
Earnings presentation
Q2 FY27

슬라이드 공유

설명

주요 주제

Adani Enterprises Limited (AEL) Q2 FY27 earnings presentation (quarter ended 30 September 2026), filed with BSE/NSE on 28 October 2026. All amounts are in ₹ crore unless stated; India's FY27 runs from April 2026 to March 2027, so Q2 FY27 is July–September 2026 and H1-27 is April–September 2026. The 46-slide deck reports record half-year EBITDA of ₹11,958 crore (up 56% YoY), H1-27 total income of ₹71,569 crore (up 62%), and walks through AEL's incubation portfolio: Adani New Industries (solar and wind manufacturing), AdaniConneX data centers, Adani Airport Holdings, Adani Road Transport, mining services, IRM, commercial mining and the Mundra copper smelter, followed by debt, capex, ESG and governance detail.

주요 이점

  • •Complete page-by-page record of an Indian conglomerate's half-year results, with consolidated and segment-level total income and EBITDA for Q2-27 and H1-27 versus the prior year
  • •Shows a clean 'Results at glance' layout splitting stacked bars into Established Businesses and Incubating (Core Infra) Businesses — a reusable pattern for holding-company reporting
  • •Operational KPI tables for airports (passengers, air traffic movements, cargo by airport), data center capacity by city, solar module and wind turbine sales, mining dispatch volumes and copper production
  • •Debt profile slide pairs a segment-wise gross / external / net debt table (Mar-26 vs Sep-26) with three coverage-ratio line charts from FY22 to H1-27
  • •Appendix and 'Standard FAQs' section with capex by vertical, solar vs wind bifurcation, quarterly finance cost movement and project lists for water, roads and mines
  • •Consistent navy-and-blue corporate template with the gradient Adani wordmark, large grey section numerals and ₹ crore unit tags — a good reference for an Indian earnings deck

대상 청중

  • •Equity and credit analysts covering Adani Group companies and Indian infrastructure
  • •Investors researching Adani Enterprises (BSE/NSE listed) quarterly results
  • •Investor relations and finance teams at Indian listed companies designing earnings presentations
  • •Students and researchers studying conglomerate incubation models and Indian airports, data centers and renewable manufacturing
  • •Presentation designers looking for a data-dense earnings deck template with segment tables and KPI charts

사용 사례

  • •Reviewing Adani Enterprises' Q2 FY27 and H1 FY27 financial and operating performance
  • •Benchmarking airport, data center, solar module and copper smelter KPIs in India
  • •Modelling AEL's segment EBITDA, capex and debt by business vertical
  • •Using the layout as a template for a holding-company or multi-segment quarterly results deck
  • •Teaching how to present established vs incubating business results side by side

고유한 가치 제안

  • •Covers an incubator structure rarely seen in earnings decks: a listed parent reporting multiple pre-IPO infrastructure platforms (airports, roads, data centers, new energy manufacturing) alongside established mining and metals businesses
  • •Rich operational disclosure — eight airports' traffic data, six data center sites, 21 road projects, 19 mining contracts and a newly ramped 500 KTPA copper complex
  • •Combines financial results, debt metrics, capex history, ESG ratings and a governance framework in one filing
  • •Written in English and filed with BSE/NSE, with all figures preserved in ₹ crore exactly as on the slides

슬라이드 페이지 (46)

레이아웃, 주요 콘텐츠 및 시각적 요소를 포함한 각 슬라이드 페이지의 상세 보기.

페이지 1
title slide

Adani Enterprises Limited Earnings Presentation Q2 FY27

콘텐츠

Cover slide titled 'Adani Enterprises Limited — Earnings Presentation — Q2 FY27' with the Adani logo and 'Growth with Goodness' tagline.

레이아웃 구조

Left half filled with a honeycomb collage of hexagonal photos (solar factory, airport, wind turbine, data center, copper cathodes, highway, the 'a' brand mark); right half carries the centered title block and logo.

주요 시각적 요소

  • •Hexagonal photo mosaic
  • •Gradient Adani wordmark
  • •'Growth with Goodness' tagline
  • •Thin divider line under the company name
페이지 2
data visualization / financial summary

AEL: Consolidated Financial Highlights H1-27 — Results at glance

콘텐츠

H1-27 vs H1-26 in ₹ crore: Total Income 71,569 vs 44,281 (up 62%), split Established 54,914 (up 103%) and Incubating Core Infra 16,656; EBITDA 11,958 vs 7,688 (up 56%), Established 5,965 (up 169%) and Incubating 5,993 (up 10%); PBT (excluding exceptional item) 3,297 vs 2,281 (up 45%), Established 2,515 vs (349) and Incubating 782 vs 2,630. Commentary: established businesses' EBITDA and PBT rose on the copper plant ramp-up and commodity prices; Core Infra EBITDA led by airports.

레이아웃 구조

Three bordered panels side by side, each with a navy header (metric name and YoY arrow) and a two-bar stacked column chart (H1-26 vs H1-27); two arrow-bullet takeaways and a footnote defining the business groupings below.

주요 시각적 요소

  • •Stacked column charts in blue and light grey
  • •Triangle badges with segment growth %
  • •Up-arrow growth tags in headers
  • •₹ crore unit label
페이지 3
executive summary / KPI comparison

AEL: Value Unlocking and Ramp up of Growth

콘텐츠

EBITDA by portfolio, H1-26 vs H1-27 (₹ crore): Core Infra Platform (new energy, airports, roads) 5,470 to 5,993 (up 10% YoY); Long-Term Contracted Services (mining services) 1,019 to 828 (down 19%); Primary Industry (metals, mining, IRM and specialist manufacturing) 1,199 to 5,137 (up 3.3x). Headline: highest half-year EBITDA of Rs. 11,958 cr, up 56% YoY. Drivers: an additional 4.3 GW module line from 1 September 2026, 55% growth in airport non-aero, higher fuel costs in mining services, copper plant utilization up to 64%, better IRM and mining price realization. Banner: full ramp-up of Navi Mumbai Airport and Ganga Expressway on the horizon.

레이아웃 구조

Three-column grid: portfolio categories with icons on the left, an H1-26/H1-27 EBITDA comparison box in the middle, and checkbox commentary boxes on the right; a navy banner across the bottom.

주요 시각적 요소

  • •Segment icons (solar panel, plane, road)
  • •Green and red YoY change indicators
  • •Chevron connectors between columns
  • •Bottom highlight banner
페이지 4
agenda

Contents

콘텐츠

Agenda: 01 Adani Portfolio Overview; 02 AEL – Largest Listed Incubator; 03 Business & Operational Highlights; 04 Financial Highlights; 05 Debt Profile; 06 ESG Highlights; Standard FAQs; Appendix.

레이아웃 구조

Right-aligned numbered list with thin divider rules between items, generous white space on the left.

주요 시각적 요소

  • •Numbered section list
  • •Light-blue 'Contents' heading
  • •Hairline separators
페이지 5
section divider

Section 01 — Adani Portfolio Overview

콘텐츠

Section divider introducing the Adani portfolio overview.

레이아웃 구조

Oversized light-grey numeral '01' with the section title in navy below; logo top right.

주요 시각적 요소

  • •Large grey section numeral
  • •Navy section title
페이지 6
organizational chart / corporate structure

Adani Portfolio: A World Class Infrastructure & Utility Portfolio

콘텐츠

Group structure chart showing Adani family stakes in listed companies — AEL (71.97%), AGEL (62.43%), APL (74.96%), AESL (73.39%), ATGL (37.40%), APSEZ (66.03%), Ambuja Cements (67.29%) with ACC (50.05%) and Orient (72.66%) — and AEL's stakes in its subsidiaries: ANIL (100%), AdaniConneX (50.00%), AAHL airports (100%), ARTL roads (100%), copper/aluminium, PVC, mining services and commercial mining (100%), NDTV (69.02%), GCC and specialist manufacturing (100%). Footnotes note AAHL's binding agreements in September 2026 to raise INR 9,825 crore (~USD 1 Bn) of primary equity, giving investors 5.54% once completed. Banner: 'A multi-decade story of high growth centered around infrastructure & utility core'.

레이아웃 구조

Org-chart style grid with column headers (Flagship, Infrastructure & Utility Core Portfolio, Primary Industry, Other) and rectangular company boxes labelled with ownership percentages; dense footnote block at bottom.

주요 시각적 요소

  • •Navy and mid-blue company tiles
  • •Percentage ownership labels
  • •Bracketed incubation zone outline
  • •Legend for listed and direct-consumer companies
페이지 7
data visualization / map

Adani Portfolio: Best-in class growth with national footprint

콘텐츠

Left: area chart of portfolio EBITDA from 24,870 in FY19 to 94,834 in FY26 (INR cr), split into tax paid, finance cost paid and cash after tax (FFO), with EBITDA CAGR of 21% and CAT (FFO) CAGR of 27%; labelled points include FFO of 67,995 (72%) in FY26. Right: India map with colored dots for AEL, APSEZ, AGEL, ATGL, AESL, APL and Ambuja Cement assets, and a callout 'Adani's Core Infra. Platform – 375 Mn Userbase'.

레이아웃 구조

Two side-by-side panels with navy title bars: stacked area chart on the left, dot map of India with legend and a blue stat card on the right.

주요 시각적 요소

  • •Stacked area chart with CAGR annotations
  • •India footprint dot map
  • •Color-coded company legend
  • •375 Mn userbase stat card
페이지 8
business model / process framework

Adani Portfolio: Repeatable, robust & proven transformative model of investment

콘텐츠

The group operating model in three stages — Development (Adani Infra, Cemindia Projects, PSP Projects: origination, site development, construction), Operations (AIMSL: life-cycle O&M, asset management) and Consumers (new C.E.O. – consumer, employees, other stakeholders). Performance examples: India's largest commercial port at Mundra, longest private HVDC line in Asia, world's largest renewable cluster at Khavda, Energy Network Operation Center. Capital management rows show long-term debt mix shifting between March 2016 and March 2026 (pie charts by PSU banks, private banks, USD bonds, NBFCs & FIs, DII, global international banks, capex LC). Enabler row covers human capital and AI-enabled digital transformation.

레이아웃 구조

Matrix with vertical row labels (Activity, Performance, Capital Management, Enabler) and three column stages separated by chevrons; photo strip in the performance row and two donut charts in the capital row.

주요 시각적 요소

  • •Chevron stage headers
  • •Infrastructure photographs
  • •Donut charts comparing Mar 2016 and Mar'26 debt mix
  • •375 Mn userbase callout
페이지 9
section divider

Section 02 — AEL – Largest Listed Incubator

콘텐츠

Section divider for AEL's role as the group's incubator.

레이아웃 구조

Large grey numeral '02' with navy section title.

주요 시각적 요소

  • •Large grey section numeral
  • •Navy section title
페이지 10
framework / strategy overview

AEL: Incubation Model

콘텐츠

Three rows (Development, Operations, Sustainable value creation) with nine boxes: incubation record (APSEZ, APL and AESL in 2015; AGEL and ATGL in 2018); new energy ecosystem (ingots, wafers, cells, modules, wind turbines, electrolysers for green hydrogen); B2B (ANIL, data center) and B2C (airports, roads) models; WTG of 5.2 MW type-certified by WINDGUARD; new 6 GW TopCon module line; capacity scaling (module line 10 GW, cell line 4 GW to 10 GW); shareholder value CAGR of 30.95% over 30 years and market cap of USD 41.0 Bn (as of 30 Sept 2026); consolidated net debt/equity of 0.70x in H1-27; S&P DJSI 2025 score of 64 and CDP Climate Change 2025 A rating.

레이아웃 구조

3×3 card grid with navy chevron row labels on the left; each card has a navy title strip and centered grey-background body text.

주요 시각적 요소

  • •Chevron row labels
  • •Uniform card grid
  • •Navy header strips
페이지 11
portfolio map / hierarchy diagram

AEL 2.0: Current incubation portfolio with long term growth potential

콘텐츠

AEL business portfolio tree: Infrastructure & Utility Core Portfolio (Energy & Utility — new energy ecosystem, data center, water; Transport & Logistics — airports, roads), Primary Industry (Services — mining services, integrated resource management; Metals — copper, aluminium, PVC; Mining — commercial mining) and Others (Specialty — media, specialist manufacturing incl. defence and aerospace). Outlined boxes mark direct consumer businesses.

레이아웃 구조

Hierarchical block diagram: full-width navy title bar, three light-blue category bars, navy sub-category tiles and grey business tiles beneath; navy banner at bottom.

주요 시각적 요소

  • •Tiered block hierarchy
  • •Outlined direct-consumer tiles
  • •Bottom tagline banner
페이지 12
section divider

Section 03 — Business & Operational Highlights

콘텐츠

Section divider for business and operational highlights.

레이아웃 구조

Large grey numeral '03' with blue section title.

주요 시각적 요소

  • •Large grey section numeral
  • •Section title
페이지 13
key highlights

AEL: Performance Highlights

콘텐츠

Airports: aero and non-aero revenue grew 9% and 57% YoY in Q2-27. New Energy: a 4.3 GW TopCon module line commissioned from September 2026, taking module capacity to 10 GW. Data Center: 19.2 MW in Pune and 10 MW in Noida handed over, taking operational capacity to 94.6 MW; a 240 MW Navi Mumbai order lifts tied-up capacity to 1.2+ GW. Credit Rating: long-term rating upgraded to AA Stable, the highest in AEL's history.

레이아웃 구조

Four horizontal rows, each with a blue chevron label on the left and checkbox bullet text on the right, separated by thin rules.

주요 시각적 요소

  • •Blue chevron category labels
  • •Checkbox bullets
  • •Bold key figures
페이지 14
segment performance / data table with charts

AEL: Energy & Utility – Adani New Industries Limited (ANIL)

콘텐츠

Solar manufacturing capacity: module 10.0 GW (8.0 GW TopCon, 2.0 GW MonoPerc), cell 4.0 GW (2.0 GW TopCon, 2.0 GW MonoPerc), a further 6.0 GW cell line expected by FY27 year-end, ingot & wafer 2.0 GW operational; module line ramp-up expected in H2-27. Wind: 2.25 GW WTG plant with four ALMM-listed models (5.2 MW 160m RD at 120m and 140m hub heights, 3.0 MW 147m RD, 3.3 MW 164m RD); prototype certificate received for a 5.0 MW model. Module sales rose 15% from 2,443 MW in H1-26 to 2,818 MW in H1-27 (Q1-27 1,340 MW, Q2-27 1,478 MW, all domestic); WTG sales rose 57% from 63 to 99 sets.

레이아웃 구조

Two stacked bands (Solar, Wind), each with a factory photo, a capacity/remarks table and a pair of quarterly stacked column charts on the right; dashed callout boxes under each table.

주요 시각적 요소

  • •Factory photographs
  • •Capacity tables
  • •Domestic vs export stacked columns
  • •Growth arrows (15%, 57%)
페이지 15
operations overview / map with table

AEL: Energy & Utility – Adani ConneX (ACX)

콘텐츠

Data center platform status by site (total growth / operational): Chennai 33 MW / 17 MW; Noida 50 MW / 20 MW (C&S complete, MEP under way); Hyderabad 406 MW / 19.2 MW; Pune 96 MW / 38.4 MW; Navi Mumbai 460 MW (Ghansoli 220 MW under execution, Taloja 240 MW new order); Vizag 400 MW (two buildings started). Totals: 94.6 MW operational, 1.2+ GW tied up, 1.4+ GW total capacity; 100% uptime; commitment to a 3 GW platform by 2031.

레이아웃 구조

India map with site pins on the left under a navy title bar; right side is a three-column table (total growth, data center status, operational capacity) with navy number tiles; callout box and bottom banner.

주요 시각적 요소

  • •Location-pin India map
  • •Navy MW tiles
  • •Status table
  • •3 GW by 2031 banner
페이지 16
operations KPI / map

AEL: Transport & Logistics – Adani Airport Holdings Ltd (AAHL)

콘텐츠

Portfolio of 8 airports (Ahmedabad, Lucknow, Jaipur, Guwahati, Thiruvananthapuram, Mumbai + Navi Mumbai, Mangaluru) serving about 23% of India's passengers, 21% of air traffic movements and 29% of cargo. H1-27 vs H1-26: passengers 45.5 Mn vs 46.0 Mn; ATMs 305.1 thousand vs 301.7 thousand; cargo 6.1 vs 5.7 lakh MT. Eight new routes and four new airlines added in the quarter; Ahmedabad and Mangaluru received ACI Level 5 accreditation.

레이아웃 구조

India map with airport pins on the left; right panel 'Aero Performance' with three stacked bar pairs (Pax, ATM, Cargo) and grey label buttons; bullet box and navy banner at bottom.

주요 시각적 요소

  • •Airport pin map
  • •Stacked quarter bars
  • •Market share bullets
  • •300 Mn+ consumer base banner
페이지 17
financial breakdown / pie and waterfall chart

AAHL: Revenue Mix, Revenue Growth and Revenue Build-up H1-27

콘텐츠

Airport total income (₹ crore) Q2-26 vs Q2-27: aero 1,145 to 1,243, non-aero 1,424 to 2,235, cargo 200 to 236, others 398 to 72, total 3,167 to 3,786; H1-26 vs H1-27: aero 2,229 to 2,501, non-aero 2,823 to 4,371, cargo 382 to 457, others 448 to 220, total 5,882 to 7,549. H1-27 mix: non-aero 58%, aero 33%, cargo 6%, others 3%. Aero up 12% with yield per pax of INR 550 (up 13%), driven by NMIA; non-aero up 55% with income per pax of INR 961 (up 56%). Waterfall from 5,882 adds 272 aero, 1,548 non-aero, 75 cargo and (228) others to reach 7,549.

레이아웃 구조

Left: large pie chart with four callout boxes; top right: revenue table; bottom right: waterfall chart labelled 'Revenue Build-up H1-27'.

주요 시각적 요소

  • •Pie chart with percentage tags
  • •Revenue growth table
  • •Waterfall bridge chart
  • •Per-pax yield callouts
페이지 18
operational KPI dashboard

AAHL: Operational Efficiency and Non-Aero Performance

콘텐츠

Monthly (Jul/Aug/Sep) service-level bar charts for seven airports (AMD, LKO, IXE, BOM, JAI, GAU, TRV) against benchmarks for security check queue, immigration, car parking and check-in (95% thresholds such as under 20 minutes for security and check-in). Non-aero revenue (₹ crore) Q2-26 vs Q2-27 and H1-26 vs H1-27: duty free 498/608 and 956/1,180; F&B and lounge 235/449 and 466/808; lease & retails 286/538 and 549/1,032; ground handling 67/183 and 126/388; car park 75/85 and 150/167; passenger services & others 263/372 and 576/796; total 1,424/2,235 and 2,823/4,371. H1-27 non-aero mix pie: duty free 27%, lease & retails 24%, F&B 18%, passenger services & others 18%, ground handling 9%, car park 4%. Prior-period mix reclassified.

레이아웃 구조

Left half: four small multiple clustered bar charts with a red benchmark line and a KPI benchmark table beneath; right half: non-aero revenue table above a pie chart.

주요 시각적 요소

  • •Small-multiple bar charts
  • •Red benchmark lines
  • •Revenue table
  • •Multi-color pie chart
페이지 19
project portfolio / map with progress chart

AEL: Transport & Logistics – Adani Road Transport Ltd (ARTL)

콘텐츠

Portfolio of 21 road projects: 14 operational, 2 under construction, 5 under development, shown on an India map. Construction progress: AVRL (HAM) 78% till Q1-27 to 82% till Q2-27; KSRL (BOT) 90% to 94%. Model summary: HAM 7 operational, 1 in progress, 3 under development; BOT 5 and 1; TOT 2 operational and 1 under development; one ropeway under development.

레이아웃 구조

India map with green, blue and yellow status pins on the left; right side a horizontal bar chart for construction progress and a project-count table by model; long abbreviation footnote.

주요 시각적 요소

  • •Color-coded project pins
  • •Progress bar chart
  • •Model count table
페이지 20
segment KPIs / tables and charts

AEL: Primary Industry – Mining Services and IRM

콘텐츠

Mining services: 18 contracts from 11 customers across 6 states; 8 operational incl. one iron ore mine; peak capacity of 145.4 MTPA from 19 contracts (pie: 55.0 current run-rate, 38.1 ramp-up, 52.3 under development; 41% growth available from operational contracts). Dispatch table: total operational 10.7 MMT in Q2-27 vs 10.5 (table shows (2%)) and 22.5 vs 22.6 MMT in H1; PEKB 2.7 vs 3.4, Talabira 3.8 vs 3.7, Parsa up 46%. IRM: sales volume 7.4 vs 11.3 MMT in Q2 (down 35%), 15.7 vs 24.1 in H1; handling volume 4.7 vs 4.3 MMT (up 9%). Q2-27 dispatch by owner: state power companies 40%, national mineral corp. 36%, state mineral corp. 25%.

레이아웃 구조

Upper left bullet box with a pie chart; lower left a wide dispatch table; right column an IRM activity table above a donut chart.

주요 시각적 요소

  • •Capacity pie chart
  • •Mine-level dispatch table
  • •IRM volume table
  • •Customer-mix donut
페이지 21
segment performance / photo with tables

AEL: Primary Industry – Commercial Mining and Metals

콘텐츠

Commercial mining: Carmichael mine in Australia, the only operational mine in this segment (peak capacity 15 MMTPA), produced 3.3 MMT in Q2-27 vs 3.2 (up 5%) and sold 3.5 vs 3.9 MMT (down 10%); H1 production 6.5 vs 6.1 MMT, sales flat at 6.2. Copper: the 500 KTPA Mundra smelter and refinery ran at about 64% of annual capacity in Q2; production 80.2 KT vs 12.9 (5.2x) and sales 80.6 vs 11.8 KT (5.8x); H1 production 145.6 vs 24.5 KT (4.9x), sales 145.3 vs 23.3 KT (5.2x).

레이아웃 구조

Two-column split with navy headers: a mining truck photo and volume table on the left; copper cathode and warehouse photos with volume table on the right.

주요 시각적 요소

  • •Haul truck photo
  • •Copper cathode photos
  • •Quarter and half-year volume tables
페이지 22
section divider

Section 04 — Financial Highlights

콘텐츠

Section divider for financial highlights.

레이아웃 구조

Large grey numeral '04' with section title.

주요 시각적 요소

  • •Large grey section numeral
  • •Section title
페이지 23
segment financial comparison / small multiples

AEL: Consolidated Financial Highlights H1-27 YoY

콘텐츠

Segment total income and EBITDA, H1-26 vs H1-27 (₹ crore): ANIL ecosystem income 7,233 to 7,606 (up 5%), EBITDA 2,384 to 2,066 (down 13%, low realization); airports income 5,882 to 7,549 (up 28%), EBITDA 2,157 to 3,275 (up 52%); IRM income 14,899 to 14,593 (down 2%), EBITDA 1,331 to 1,548 (up 16%); mining services income 2,247 to 2,171 (down 3%), EBITDA 1,019 to 828 (down 19%, higher fuel cost); copper income 1,961 to 25,764 (up 12x), EBITDA (320) to 2,033.

레이아웃 구조

Five columns (one per segment) × two rows (Total Income, EBITDA) of mini paired bar charts with grey prior-year and blue current-year bars, each with a captioned change box; navy vertical row labels.

주요 시각적 요소

  • •Small-multiple bar pairs
  • •Green/red change percentages
  • •Explanatory caption boxes
페이지 24
data visualization / financial summary

AEL: Consolidated Financial Highlights Q2-27 — Results at glance

콘텐츠

Q2-27 vs Q2-26 (₹ crore): Total Income 38,023 vs 21,844 (up 74%), Established 29,982 (up 119%) and Incubating 8,041 vs 8,154; EBITDA 6,316 vs 3,902 (up 62%), Established 3,217 vs 1,232 (up 161%) and Incubating 3,099 vs 2,670 (up 16%); PBT 2,002 vs 814 (prior year excluding exceptional item; up 146%), Established 1,573 vs (378) and Incubating 429 vs 1,192.

레이아웃 구조

Same three-panel stacked column layout as page 2, applied to the quarter.

주요 시각적 요소

  • •Stacked column charts
  • •Growth triangle badges
  • •Header growth arrows
페이지 25
segment financial comparison / small multiples

AEL: Consolidated Financial Highlights Q2-27 YoY

콘텐츠

Quarterly segment results (₹ crore), Q2-26 vs Q2-27: ANIL income 3,199 to 3,669 (up 15%), EBITDA 1,172 to 1,094 (down 7%); airports income 3,167 to 3,786 (up 20%), EBITDA 1,062 to 1,641 (up 55%); IRM income 6,843 to 7,169 (up 5%), EBITDA 726 to 654 (down 10%, low volume); mining services income 1,088 to 998 (down 8%), EBITDA 535 to 407 (down 24%, fuel cost); copper income 1,400 to 14,843 (up 9.6x), EBITDA (151) to 1,283.

레이아웃 구조

Same 5×2 small-multiple bar chart grid as page 23 for the quarter.

주요 시각적 요소

  • •Paired bar charts
  • •Change captions
  • •Navy row labels
페이지 26
section divider

Section 05 — Debt Profile

콘텐츠

Section divider for debt profile.

레이아웃 구조

Large grey numeral '05' with section title.

주요 시각적 요소

  • •Large grey section numeral
  • •Section title
페이지 27
financial table / debt analysis

AEL: Consolidated Debt Details

콘텐츠

Segment debt (₹ crore) as at Mar-26 vs Sep-26: gross debt 86,702 to 97,294 (long-term 78,596 to 86,694; working capital 8,107 to 10,600); airport 29,746 to 35,009; road 17,179 to 16,949; copper 8,844 to 11,461; PVC 7,278 to 10,093; Australia project 10,244 to 10,289; new energy 3,104 to 5,334. Less shareholder's loan 10,842 to 8,203; external debt 75,860 to 89,090; cash & bank 11,809 to 16,857; net external debt 64,051 to 72,233. The rise in long-term external debt reflects capex in airports and the PVC project. Line charts FY22–H1-27: interest coverage 2.3, 3.1, 3.6, 3.4, 2.6, 2.8; debt service coverage 1.8, 2.5, 2.5, 2.6, 1.9, 2.2; net external debt/EBITDA 5.2, 2.2, 2.3, 2.9, 3.9, 3.0.

레이아웃 구조

Large navy-headed debt table on the left with bold subtotal rows; three dashed-border line charts stacked on the right; callout strip under the table.

주요 시각적 요소

  • •Segment debt table
  • •Coverage-ratio line charts
  • •Bold navy subtotal rows
페이지 28
section divider

Section 06 — ESG Highlights

콘텐츠

Section divider for ESG highlights.

레이아웃 구조

Large grey numeral '06' with section title.

주요 시각적 요소

  • •Large grey section numeral
  • •Section title
페이지 29
ESG scorecard

AEL: ESG Rating & Performance Highlights

콘텐츠

Ratings: DJSI CSA (2025) 64, top 5 in sector and 98th percentile; CDP Climate Change (2025) A; CDP Water Stewardship (2025) A; Sustainalytics 35.8 (reflecting reclassification from T&D to conglomerates); Care Edge 83.1 'Leadership'; CRISIL 60 'Adequate' (up from 51); TPI Level 3; ESG Risk Assessment & Insight 67.5 'Strong'. H1-FY27 performance vs H1-FY26: ANIL 18% renewable electricity and 100% water from non-competing sources; data center 90% renewable and 29% lower Scope 1 & 2 intensity per MWh of IT load; airports 53% renewable and 20% less waste; mining services 35% renewable and 100% ZLD across operational mines; AEL 46% water from non-competing sources and 4,54,166 trees planted.

레이아웃 구조

Left: ratings table with agency logos, scores and descriptions; right: performance grid with chevron business labels and icon-led metrics.

주요 시각적 요소

  • •Rating agency logos
  • •Sun, water-drop and tree icons
  • •Chevron business labels
  • •Large percentage figures
페이지 30
closing slide

Thank You

콘텐츠

Closing slide with the Adani logo, 'Thank You' and a colorful illustrated banner of people, a container ship, wind turbines, a mining truck and power lines.

레이아웃 구조

Logo top left, centered heading, full-width illustration across the lower half.

주요 시각적 요소

  • •Illustrated infrastructure banner
  • •Large 'Thank You' heading
  • •Adani logo
페이지 31
section divider / sub-agenda

Standard FAQs

콘텐츠

Divider listing the supplementary FAQ slides: Capex Breakup H1-27; New Energy Ecosystem – Solar and Wind Bifurcation; Finance Cost Movement – Sequential Quarter.

레이아웃 구조

Left-aligned heading with three underlined list items.

주요 시각적 요소

  • •Blue heading
  • •Divider-separated list
페이지 32
financial table

Capex Breakup: H1-27

콘텐츠

Capex incurred by business vertical (₹ crore), H1 FY27 / FY26 / FY25: new energy ecosystem 2,684 / 2,962 / 1,615; airport 4,245 / 13,059 / 10,887; road 1,737 / 6,604 / 8,617; PVC 4,319 / 7,979 / 3,895; mining services & others 3,028 / 5,296 / 6,753; total 16,013 / 35,900 / 31,767.

레이아웃 구조

Single wide table with navy header and total rows; the H1 FY27 column shaded grey.

주요 시각적 요소

  • •Navy header row
  • •Highlighted current-period column
  • •Bold total row
페이지 33
financial table

New Energy Ecosystem: Solar and Wind Bifurcation

콘텐츠

Solar manufacturing total income (₹ crore): Q1-26 3,493, Q2-26 2,719, H1-26 6,212, Q1-27 3,071, Q2-27 3,135, H1-27 6,206; EBITDA 1,129, 1,023, 2,152, 787, 1,001, 1,788. WTG manufacturing total income 542, 480, 1,022, 866, 516, 1,382; EBITDA 83, 149, 232, 185, 93, 278.

레이아웃 구조

Grid table with merged vertical labels and grey-shaded half-year columns.

주요 시각적 요소

  • •Merged row headers
  • •Shaded H1 columns
  • •Navy header
페이지 34
financial table

Finance Cost Movement: Q-o-Q

콘텐츠

Gross debt and interest cost (₹ crore), Q1-27 vs Q2-27: airport 32,843/757 to 35,009/745; road 18,024/339 to 16,949/426; copper 10,542/336 to 11,461/383; corporate & others 36,213/982 to 33,875/814; gross debt 97,622/2,414 to 97,294/2,368; less shareholder's loan interest 244 to 224 and notional lease interest 398 to 394; external debt 83,982/1,772 to 89,091/1,750. Note: road finance cost rose on the full-quarter impact of the Ganga Expressway project.

레이아웃 구조

Table with two-level column headers and navy-highlighted total rows; pointing-hand note below.

주요 시각적 요소

  • •Two-tier header
  • •Navy subtotal rows
  • •Pointer annotation
페이지 35
section divider

Appendix

콘텐츠

Divider introducing the appendix of project-level detail.

레이아웃 구조

Mostly white slide with 'Appendix' in blue at lower left.

주요 시각적 요소

  • •Section title
  • •White space
페이지 36
project list table

AEL: Energy & Utility – Water

콘텐츠

Water projects: HAM — Prayagraj Water (Uttar Pradesh, 326 MLD, COD achieved, 2+15 years), Bhagalpur Waste Water (Bihar, 45 MLD, pre-COD achieved, 2+15), Morsagar Bisalpur Water (Rajasthan, 200 MCM, under development, 2.75+20), Brahmani Barrage Water (Rajasthan, 55 MCM, under development, 2.75+20); EPC — Shakkar Pench Micro Lift Irrigation (Madhya Pradesh, 95,000 Ha, execution in progress, 6+5) and Mithi River Development Package III (Maharashtra, 18 gate pump areas, pre-engineering, 6+10).

레이아웃 구조

Five-column project table with merged model cells and grey shading for operational projects.

주요 시각적 요소

  • •Grey operational shading
  • •Merged HAM/EPC labels
  • •Concession period column
페이지 37
data table

AEL: Transport & Logistics – AAHL (Airports) Volume Details

콘텐츠

Airport-level passengers, ATMs and cargo for Q2-26, Q2-27, H1-26 and H1-27. Mumbai 13.3 to 12.0 Mn passengers in Q2 (26.9 to 24.8 in H1); Ahmedabad 3.1 to 2.7 (6.6 to 6.3); Navi Mumbai 1.1 Mn in Q2-27 and 2.7 in H1-27; total 22.6 to 21.3 Mn in Q2 and 46.0 to 45.5 in H1. Total ATMs 148.2 to 145.7 thousand (Q2) and 301.7 to 305.1 (H1); cargo 2.9 to 3.0 and 5.7 to 6.1 lakh MT. Q2-27 figures are aligned to AAI data; September 2026 data not yet on the AAI website.

레이아웃 구조

Wide 13-column data table with a navy total row and footnote.

주요 시각적 요소

  • •Grouped column headers
  • •Navy total row
  • •Asterisk footnote
페이지 38
project list table

AEL: Transport & Logistics – ARTL (Roads) — HAM and Ropeway

콘텐츠

Hybrid annuity road projects with length and status: Bilaspur Pathrapali (53.3 km), Suryapet Khammam (58.6), Mancherial Repallewada (42.0), Vijayawada Bypass (17.9), Nanasa Pidgaon (47.4), Kodad Khammam (31.8) and Badakumari Karki (47.5) operational; Azhiyur Vengalam (40.8 km) 82% complete; Munger Sultanganj (41.8), Sultanganj Sabour (41.1) and Sree Vishwa Varadhi (35.2) under development; Shri Kedarnath Ropeway (12.9 km, 6+29 years) under development.

레이아웃 구조

Five-column table with grey-shaded operational rows and merged model labels.

주요 시각적 요소

  • •Grey operational rows
  • •Concession period column
  • •Model grouping
페이지 39
project list table

AEL: Transport & Logistics – ARTL (Roads) — BOT and TOT

콘텐츠

BOT: Kagal Satara (65.1 km, 94.0%), Maharashtra Border Check Post Network (24 BCPs; 21 operating, 2 COD achieved), Panagarh Palsit (67.8 km), Budaun Hardoi (151.7), Hardoi Unnao (155.7), Unnao Prayagraj (156.8) and Indore Gujarat Road (155.2) operational. TOT: DPJ TOT (105.9 km) and PRS Tolls (49.5 km) operational; CORR Tollways (60.15 km, 0+25) under development.

레이아웃 구조

Same table format as page 38.

주요 시각적 요소

  • •Grey operational rows
  • •Model grouping
  • •Abbreviation footnote
페이지 40
project list table

AEL: Primary Industries – Mining Services

콘텐츠

List of mine service contracts with state, peak capacity, owner and SPV: coal contracts including PEKB (18.0 MMT, RRVUNL), Gare Pelma III (5.0, CSPGCL), Talabira II & III (23.0, NLCIL), Suliyari (6.0, APMDC), Parsa (5.0), Gare Pelma II (23.6, MAHAGENCO), Dhirauli (6.5, MEL), Kente Extension (9.0), Pelma (15.0, SECL) and smaller blocks; other contracts Srikurmam South mineral deposit (10 MMT), Kurmitar iron ore (6.0, OMC) and Taldih (7.0, SAIL).

레이아웃 구조

Long five-column table with grey operational shading and merged contract-type labels; abbreviation footnote.

주요 시각적 요소

  • •Dense contract table
  • •Operational shading
  • •Owner abbreviations
페이지 41
project list table

AEL: Primary Industries – Commercial Mining

콘텐츠

Domestic commercial mining contracts: Tara Coal Block (6.0 MMT, CG Syn-Gas and Chemicals Ltd, new this quarter), Gondulpura, Jharkhand (4.0), Bijahan, Odisha (5.3), Gondbahera Ujheni, Madhya Pradesh (4.1), Rampia & Dip side of Rampia, Odisha (15.0), and Jhigador and Khargaon, Chhattisgarh (capacity TBD).

레이아웃 구조

Four-column table with a merged left label and white space below.

주요 시각적 요소

  • •Simple bordered table
  • •Footnote on new mine
페이지 42
section divider

ESG Framework

콘텐츠

Divider introducing the ESG framework slides.

레이아웃 구조

White slide with blue title at lower left.

주요 시각적 요소

  • •Section title
페이지 43
framework diagram

AEL: ESG backed by Assurance

콘텐츠

ESG framework built on policies, guiding principles, commitments and assurance. Commitments: no-net-loss to biodiversity (IBBI/TNFD), net water positive, UNGC signatory, airport and data center businesses to reach operational net zero by 2029 and 2030, and 'zero harm'. Guiding principles: UNGC, SDG, SBTi, GRI, BRSR, DJSI, TCFD, IBBI/TNFD, CDP. Policy structure by E, S and G, plus focus areas from climate action to industry and infrastructure. Vision: to be a world-class leader in businesses that enrich lives.

레이아웃 구조

Hexagon cluster around a central 'ESG' hexagon on the left; right side boxes for commitments, guiding-principle tiles, E/S/G policy rows and focus areas.

주요 시각적 요소

  • •Hexagon diagram with arrows
  • •Principle tiles
  • •E/S/G letter markers
페이지 44
CSR / sustainability mapping

AEL: Adopted UN Sustainable Development Goals

콘텐츠

Maps social initiatives to UN SDGs: women's education (own and upgraded schools, Project Suposhan), women's health in Sarguja (sanitary pads via self-help groups), women's empowerment in Sarguja and Tamnar (non-timber forest produce), ecology at Mundra (mangrove conservation with GUIDE), local and rural infrastructure (organic farming) and water security (pond deepening, rooftop rainwater harvesting).

레이아웃 구조

Left: grid of the 17 colored SDG tiles; right: rows of focus area, SDG numbers, location and initiative bullets separated by dashed lines.

주요 시각적 요소

  • •UN SDG icon grid
  • •Location tags
  • •Dashed separators
페이지 45
governance / org chart

AEL: Strong Governance Framework

콘텐츠

Governance highlights: 50% independent and 25% women directors; Corporate Responsibility, Nomination & Remuneration and Audit Committees with 100% independent directors; CSR committee 67% independent; Risk Management Committee 50% independent with M&A, legal/regulatory/tax, commodity price and reputation risk sub-committees (67% independent); related party transaction policy; stakeholders relationship committee 75% independent; anti-bribery policy and insider trading code; statutory auditors Shah Dhandharia & Co. LLP. ESG governance chart from the board through CSR, CRC, RMC and stakeholder committees to corporate and BU ESG heads, with their roles.

레이아웃 구조

Left: two-column checklist table; right: small org chart above two role boxes.

주요 시각적 요소

  • •Checkmark table
  • •ESG governance org chart
  • •Light-blue cell shading
페이지 46
closing slide

Thank You

콘텐츠

Final closing slide repeating the illustrated 'Thank You' banner after the appendix.

레이아웃 구조

Same as page 30: logo top left, centered heading, full-width illustration.

주요 시각적 요소

  • •Illustrated banner
  • •Thank You heading

자주 묻는 질문

이 슬라이드 및 기본 프레젠테이션 콘텐츠에 대한 일반적인 질문.

What does the Adani Enterprises Q2 FY27 earnings presentation cover?

It is AEL's 46-slide results deck for the quarter ended 30 September 2026. It covers consolidated Q2-27 and H1-27 results, the Adani portfolio and AEL's incubation model, operating updates for ANIL (solar and wind manufacturing), AdaniConneX data centers, airports, roads, mining services, IRM, commercial mining and copper, plus debt, capex, ESG and governance.

What were the headline numbers?

For H1-27 the deck reports total income of ₹71,569 crore (up 62%), EBITDA of ₹11,958 crore (up 56%, the highest half-year EBITDA it has reported) and PBT excluding exceptional items of ₹3,297 crore (up 45%). For Q2-27 alone, total income was ₹38,023 crore (up 74%) and EBITDA ₹6,316 crore (up 62%).

What period is Q2 FY27, and what currency are the figures in?

Indian companies use an April–March fiscal year, so FY27 runs from April 2026 to March 2027. Q2 FY27 is July–September 2026 and H1-27 is April–September 2026. Amounts are in Indian rupees, mostly ₹ crore (1 crore = 10 million), and the page-by-page notes keep the deck's own units.

Where was this presentation originally published?

Adani Enterprises filed it with BSE and NSE on 28 October 2026 as part of its quarterly results disclosure. It is an English-language deck; the cover letter that came with the exchange filing has been removed from this copy.

Which businesses drove the growth?

Mostly the copper smelter at Mundra, whose H1 income rose from ₹1,961 crore to ₹25,764 crore as utilization reached about 64%, and airports, where EBITDA rose 52% to ₹3,275 crore on 55% growth in non-aero revenue. Mining services EBITDA fell 19% on higher fuel costs, and ANIL EBITDA fell 13% on lower realization.

How much debt does Adani Enterprises carry according to the deck?

As at September 2026, gross debt was ₹97,294 crore, external debt ₹89,090 crore and net external debt ₹72,233 crore, up from ₹64,051 crore in March 2026. The deck attributes the increase to capex in airports and the PVC project. Net external debt/EBITDA was 3.0x for H1-27, versus 3.9x in FY26.

Can I download this deck as an editable PowerPoint?

Yes. The page offers the original PDF and a PPTX converted from it. The PPTX lets you reuse the stacked-column 'Results at glance' panels, segment small-multiple charts, debt tables and section dividers as a starting point for your own earnings presentation. Converted files may need some layout clean-up.

What design elements make this deck a useful template?

It uses a clean white background with navy and mid-blue accents, the gradient Adani wordmark, oversized grey numerals on section dividers, ₹ crore unit tags on financial slides, and consistent navy title bars. Charts include stacked columns, waterfall, pie and donut charts, small-multiple bar pairs and line charts, along with dense project tables and India footprint maps.

출처 및 참고 자료

2slides

Create Your Own Slides

Turn your ideas into professional presentations in seconds with 2slides AI.

몇 초 만에 세계적 수준의 슬라이드 만들기

전문 디자인을 참조하고, 스타일을 선택하며, 완벽한 텍스트 렌더링으로 슬라이드를 생성하세요. Nano Banana로 구동—지금 프레젠테이션 만들기를 시작하세요.

2Slides logo

슬라이드를 위한 AI 에이전트. 지능형 프레젠테이션 생성으로 시간을 절약하고 더 빠르게 빛나세요.

AI로 요약하기

ChatGPTClaudeGrokPerplexity
모든 서비스 정상 운영 중

제품

기능

갤러리

템플릿

연동

리소스

비교

© 2026 2slides. 모든 권리 보유.