West African Resources Investor Presentation October 2026 — the 24-slide deck lodged with the ASX by West African Resources Limited (ASX: WAF), a Burkina Faso gold producer, titled "West Africa's Growing Mid Tier Producer: Targeting +500,000 oz pa Gold Production from 2027". It covers 2026 production guidance of 430–490 koz, A$437 million H1 2026 NPAT, the 13.7 Moz Mineral Resource and 7 Moz Ore Reserve, a 10-year production target averaging 533,000 oz a year, the Kiaka and Sanbrado production centres, near-mine drilling results, ESG programs and the capital structure. Dollar figures are in Australian dollars (A$) or US dollars (US$) exactly as the deck states them; WAF reports on calendar years.

2 suka
0 unduhan

Menggunakan sampul presentasi ini sebagai referensi gaya untuk slide yang dibuat dari konten Anda sendiri. Atau pilih halaman mana pun di bawah untuk memakai tata letaknya sebagai referensi.

Navigasi Cepat

Tag

West African Resources
ASX WAF
Investor presentation
Gold mining presentation
ASX investor presentation

Bagikan slide

Deskripsi

Topik Utama

West African Resources Investor Presentation October 2026 — the 24-slide deck lodged with the ASX by West African Resources Limited (ASX: WAF), a Burkina Faso gold producer, titled "West Africa's Growing Mid Tier Producer: Targeting +500,000 oz pa Gold Production from 2027". It covers 2026 production guidance of 430–490 koz, A$437 million H1 2026 NPAT, the 13.7 Moz Mineral Resource and 7 Moz Ore Reserve, a 10-year production target averaging 533,000 oz a year, the Kiaka and Sanbrado production centres, near-mine drilling results, ESG programs and the capital structure. Dollar figures are in Australian dollars (A$) or US dollars (US$) exactly as the deck states them; WAF reports on calendar years.

Manfaat Utama

  • •Single-slide snapshot of a mid-tier gold miner: 2026 guidance 430–490 koz, 13.7 Moz resources, 7 Moz reserves, 5.3 Moz 10-year production target, A$3,638m market capitalisation and A$1,412m in cash and bullion
  • •Year-by-year 10-year production chart (2026–2035) split between Kiaka and Sanbrado, peaking at 596,000 oz in 2030
  • •Two parallel 'key project metrics' slides (Kiaka and Sanbrado) that show how to present a mining asset as a clean label/value fact sheet beside a site map
  • •Drill cross-sections with labelled intercepts that illustrate how exploration upside is communicated to investors
  • •Full JORC Mineral Resource and Ore Reserve tables in the appendix, plus capital structure, analyst coverage and shareholder-mix charts
  • •Original PDF plus an editable PPTX conversion available to download

Target Audiens

  • •Investors and analysts following ASX-listed gold producers and West African mining
  • •Mining company IR teams and executives building an investor or roadshow presentation
  • •Finance and geology students studying how resources, reserves and production targets are disclosed
  • •Consultants and bankers benchmarking mid-tier gold producers
  • •Presentation designers looking for a resources-sector deck structure

Kasus Penggunaan

  • •Reference structure for a mining company investor presentation or AGM deck
  • •Comparing WAF's guidance, AISC and reserve base against other mid-tier gold producers
  • •Teaching JORC Code resource/reserve tables and inferred-resource cautionary statements
  • •Template for a project fact-sheet slide (location, ownership, resources, reserves, mine life, processing, tax, royalties)
  • •Template for an ESG and local-workforce section in an extractives deck

Proposisi Nilai Unik

  • •A real, current-period investor deck from an ASX 200 gold producer, read page by page rather than summarised from a press release
  • •Shows both A$ corporate metrics (NPAT, market cap, dividend) and US$ operating metrics (AISC, cash, gold price assumptions) side by side, as Australian-listed miners typically do
  • •Covers the full investor narrative in 24 slides: scale, team, assets, growth drilling, people, safety, community, capital structure and JORC tables

Halaman Slide (24)

Tampilan detail setiap halaman slide, termasuk tata letak, konten utama dan elemen visual.

Halaman 1
Title slide

West Africa's Growing Mid Tier Producer — Investor Presentation, October 2026

Konten

Cover slide announcing West African Resources as West Africa's growing mid-tier gold producer, targeting more than 500,000 oz a year of gold production from 2027, dated Investor Presentation – October 2026.

Struktur Tata Letak

Full-bleed night photograph of a lit gold processing plant across the top two-thirds, with a navy band at the bottom carrying the white headline, a gold-coloured tagline and the presentation date, and the WAF logo boxed at bottom right.

Elemen Visual Utama

  • •Night photo of processing plant
  • •Navy title band
  • •Gold accent tagline
  • •West African Resources logo
Halaman 2
Disclaimer / legal notice

Important Notice (1 of 2)

Konten

Legal disclaimer dated 29 October 2026 for West African Resources Limited (ABN 70 121 539 375): summary information, not an offer, not financial advice, financial data in A$ or US$ as indicated, past performance, non-IFRS measures (cash costs, site sustaining costs, AISC and EBITDA defined) and forward-looking statements; directs readers to WAF's announcements lodged with the ASX.

Struktur Tata Letak

Two dense text columns under a large navy heading with bold sub-headings for each disclaimer section; navy footer bar with page number.

Elemen Visual Utama

  • •Two-column legal text
  • •Bold section sub-headings
  • •Gold vertical accent bar by title
Halaman 3
Disclaimer / legal notice

Important Notice (2 of 2)

Konten

Continuation of the disclaimer: forward-looking statement risk factors, the source of Mineral Resources, Ore Reserves and production targets (the 31 March 2026 announcement 'WAF 10-year gold production to average 533,000 oz per annum'), exploration results references, and a JORC Code note explaining the estimates may not comply with NI 43-101 or SEC Regulation S-K 1300.

Struktur Tata Letak

Left text column with bold sub-headings and a shorter right column for the JORC Code paragraph, leaving white space at right.

Elemen Visual Utama

  • •Text columns
  • •JORC Code compliance note
  • •Navy footer bar
Halaman 4
Key metrics / company snapshot

West Africa's Growing Mid-Tier Gold Producer — 100% Unhedged Mineral Resources and Ore Reserves

Konten

Headline metrics table: 2026 guidance 430–490 koz, Mineral Resources 13.7 Moz, Ore Reserves 7 Moz, 10-year production target 5.3 Moz (82% from Ore Reserves), market capitalisation A$3,638m (1,144,102,726 shares at A$3.18 as at 23 October 2026), A$1,412m in cash and bullion at 30 September 2026, all 100% unhedged; includes the inferred-resource cautionary statement.

Struktur Tata Letak

Aerial photograph of an open-pit mine and tailings dam as the background, with a translucent white metrics table across the lower third and the WAF logo top right.

Elemen Visual Utama

  • •Aerial open-pit photo
  • •Five-column KPI table
  • •Cautionary statement row
  • •Footnotes
Halaman 5
Team / leadership

West African Resources Ltd — Board and Management

Konten

Sixteen leadership profiles: Founder, CEO and Executive Chairman Richard Hyde; Executive Director and COO Lyndon Hopkins; Lead Independent Director Rod Leonard; Executive Director of HR Libby Mounsey; non-executive directors Stewart Findlay, Robin Romero and Jayde Webb; CFO and Company Secretary Padraig O'Donoghue; plus legal counsel, vice presidents for group operations and supply chain, the country manager and general managers for sustainability, finance, risk and technical services.

Struktur Tata Letak

Three rows of circular black-and-white headshots (7, 5 and 4 people) with names in blue and titles in grey beneath each photo.

Elemen Visual Utama

  • •Circular greyscale headshots
  • •Name and title captions
  • •Tiered grid layout
Halaman 6
Map / geographic overview

WAF Project Locations

Konten

Map of Burkina Faso showing WAF's mines at Sanbrado and Kiaka and the Toega project south-east of Ouagadougou, alongside other current and former gold mines, greenstone belts, towns, rail and major roads, with an inset locating Burkina Faso in Africa.

Struktur Tata Letak

Large shaded-relief country map filling most of the slide, an Africa inset at top left, and a legend with logo on the right.

Elemen Visual Utama

  • •Country map with greenstone belts
  • •Africa locator inset
  • •Mine and project icons
  • •Legend and 100 km scale bar
Halaman 7
Highlights / key achievements

Setting the Pace for Mid-Tier Producers

Konten

Six highlights: A$437 million H1 NPAT; A$0.20 special dividend per share paid 7 October 2026; group production guidance 430,000–490,000 oz; group AISC guidance under US$1,900/oz; year-to-date production of 360,857 oz at AISC US$1,725/oz; and more than 100,000 m of drilling underway at Sanbrado and Kiaka targeting depth extensions and near-surface anomalies.

Struktur Tata Letak

Bullet list on the left half, a photograph of a worker in a heat-protective suit pouring at a smelting furnace on the right, and source references in the footer.

Elemen Visual Utama

  • •Square bullet list
  • •Gold pour photograph
  • •ASX announcement references
Halaman 8
Data visualization / production forecast

Group 10-Year Production Target

Konten

Stacked bar chart of recovered gold ounces 2026–2035 split between Kiaka and Sanbrado (about 455 koz in 2026 rising to roughly 596 koz in 2030); bullets state resources increased to 13.7 Moz and reserves to 7 Moz, an average of 533,000 oz a year over 2026–2035, a 2030 peak of 596,000 oz, a target based on 82% Ore Reserves, 3% Indicated and 15% Inferred at a US$2,000/oz gold price, and a 2026 drilling program including 21,000 m underground at M5, 11,000 m at M5 North, 13,500 m at Toega, 7,500 m at Kiaka and 7,000 m at MV3.

Struktur Tata Letak

Stacked column chart on the left with inferred-resource caveat below, bullet list with dash sub-points on the right.

Elemen Visual Utama

  • •Stacked bar chart (blue Kiaka, yellow Sanbrado)
  • •Bullets with sub-bullets
  • •Cautionary statement
Halaman 9
Section divider

Kiaka Gold Production Centre

Konten

Section divider photograph of the Kiaka processing plant with conveyors, crushing circuit and stockpiles in daylight.

Struktur Tata Letak

Title and gold subtitle at top, with a full-width photograph filling the rest of the slide above the navy footer.

Elemen Visual Utama

  • •Full-width plant photograph
  • •Yellow-railed conveyors
  • •Small corner logo
Halaman 10
Project fact sheet

Kiaka Gold Production Centre — Key Project Metrics

Konten

Fact sheet: south-central Burkina Faso; WAF 85% / government 15% (with a decree to acquire a further 25%); open pit with a 1.4:1 life-of-mine strip ratio; resources 391 Mt at 0.7 g/t for 9.2 Moz (US$3,000 shell); reserves 177 Mt at 0.8 g/t for 4.7 Moz (US$2,000); 16-year mine life; 10 Mtpa CIL plus gravity rising to 12 Mtpa in 2028; 92% recovery; first production June 2025; 2026 YTD production 209,305 oz; 10-year average 277,000 oz a year; 95% Burkinabe workforce; 27.5% tax; 15% government equity, 10% royalty (at US$4,000/oz) and 1% development fund.

Struktur Tata Letak

Two-column label/value list on the left, a 3D site plan on the right showing the Kiaka main, central and south pits, plant, tailings facility, waste dumps and camp.

Elemen Visual Utama

  • •Label/value metrics list
  • •3D annotated site plan
  • •Footnotes on government stake and royalty
Halaman 11
Technical diagram / exploration results

Near Mine Growth — Kiaka Expansion Potential

Konten

Northwest–southeast drill cross-section through Kiaka Main showing wide gold intercepts such as 315 m at 1.2 g/t, 324 m at 1.0 g/t, 249 m at 1.5 g/t and 185 m at 1.7 g/t Au, mineralisation open at depth about 700 m vertically, compared against the Stage 3 pit and a US$3,000 pit optimisation shell.

Struktur Tata Letak

Large geological cross-section with callout labels for each intercept, a plan-view inset at top right and a legend at bottom right.

Elemen Visual Utama

  • •Drill-hole cross-section
  • •Red intercept traces
  • •Open-at-depth arrows
  • •Plan-view inset
  • •Legend
Halaman 12
Section divider

Sanbrado Gold Production Centre

Konten

Section divider photograph of the Sanbrado processing plant lit at dusk.

Struktur Tata Letak

Title and gold subtitle at top with a full-width dusk photograph below.

Elemen Visual Utama

  • •Dusk plant photograph
  • •Silos and conveyors
  • •Corner logo
Halaman 13
Project fact sheet

Sanbrado Gold Operations — Key Project Metrics

Konten

Fact sheet covering Sanbrado, Toega and MV3: WAF 85% / government 15%; open-pit and underground mining; resources 67 Mt at 2.0 g/t for 4.4 Moz (US$3,000); reserves 37 Mt at 1.9 g/t for 2.3 Moz (US$2,000); mine life of 11+ years; 3.2 Mtpa CIL plus gravity; 92% recovery; first production March 2020; 2026 YTD production 151,552 oz; 10-year average 256,000 oz a year; 95% Burkinabe workforce including 55% from the local region; 27.5% tax.

Struktur Tata Letak

Satellite map on the left showing Sanbrado, the 12.6 km haul road to Toega and the 4 km proposed road to MV3; label/value list on the right.

Elemen Visual Utama

  • •Satellite tenement map
  • •Haul road annotations
  • •Label/value metrics list
Halaman 14
Growth strategy / exploration

Near Mine Growth — Sanbrado Expansion Potential

Konten

More than 60,000 m of surface and underground drilling in progress; mineralisation at M1 South and M5 open at depth; M5 South underground drilling extending mineralisation about 400 m below the current resource; M5 North surface drilling has increased open-pit reserves with a cutback in the 10-year plan; M1 North drilling completed with cutback potential confirmed.

Struktur Tata Letak

Bullet list on the left and a 3D model on the right of the M5 and M1 open pits, underground development and planned drilling fans.

Elemen Visual Utama

  • •3D mine model
  • •Planned drilling fans
  • •Open-at-depth arrows
  • •Bullet list
Halaman 15
Technical diagram / exploration results

Near Mine Growth — M5 Recent Results

Konten

A 2.5 km long section from M5 South to the M5 Far North pits showing recent intercepts including 29 m at 16.4 g/t, 22 m at 13 g/t, M5SRD_0027 27 m at 6.7 g/t and SAN25-DD031 16 m at 11.2 g/t Au; bullets note thick high-grade zones beneath the M5 South underground reserve and that infill drilling for the M5 open-pit reserve is complete.

Struktur Tata Letak

Wide long-section diagram with many callouts (blue for current releases, black for previous), a grade-thickness legend, and two bullets beneath.

Elemen Visual Utama

  • •Long section with pit shells
  • •Colour-coded drill intercepts
  • •2026 resource conversion box
  • •Grade x thickness legend
Halaman 16
People / workforce

Our People — Building a Strong Local Workforce

Konten

Équipe WAF: 3,653 total workforce, 2,491 group employees of whom more than 95% are Burkinabe, 54 internships; more than 32,000 training hours and a government-recognised accreditation program; the first SOMISA scholarship cohort graduated, the SOMISA–Toega program expanded to 4 scholarships a year and a Kiaka program launched with 4 scholarships.

Struktur Tata Letak

Three headed bullet groups on the left and two stacked photos on the right (geologists underground; staff logging drill core).

Elemen Visual Utama

  • •Grouped bullets with headers
  • •Underground mapping photo
  • •Core-logging photo
Halaman 17
Health and safety

Protecting Our Workforce — Health, Safety and Security

Konten

ISO 45001-based occupational health and safety management system; WAF TRIFR of 0.87 versus a Western Australian gold industry IFR of 5.7; critical-risk assurance program, external ISO 45001 audits, dedicated OHS and emergency response teams and medical centres at Sanbrado and Kiaka; a multi-layered security strategy aligning company security, community relations and government.

Struktur Tata Letak

Bold heading and bulleted aspects on the left, a photograph of an emergency response team running a confined-space rescue drill on the right.

Elemen Visual Utama

  • •Safety KPI comparison
  • •Emergency response photo
  • •Indented sub-bullets
Halaman 18
ESG / community impact

Investing in Our Common Future — Driving Sustainable Growth and Supporting Shared Value

Konten

Contributions since mining began in 2020: US$865 million paid directly to Burkina Faso in taxes and royalties, US$19 million in community projects and donations, US$48 million to the local development mining fund (1% of revenue) and US$6 million to the mine rehabilitation and closure fund.

Struktur Tata Letak

Checkmark list at top left, the UN Sustainable Development Goals logo at lower left, and a three-photo collage of community programs on the right.

Elemen Visual Utama

  • •Checkmark list
  • •SDG logo
  • •Community photo collage
Halaman 19
ESG / sustainability

ESG — Building Lasting Value

Konten

Programs grouped under education and training (school building with solar power, IT access, vocational training), livelihoods and local economic development (agriculture, livestock, small business, climate resilience and food security), community health (nutrition, health centres, disease prevention) and environmental stewardship (revegetation, seed collection, waste diversion, recycling), mapped to SDGs 2, 3, 4, 6, 8, 10, 12, 13 and 15.

Struktur Tata Letak

Row of SDG icon tiles across the top right, four headed bullet groups on the left, and a 2x2 photo grid on the right.

Elemen Visual Utama

  • •SDG icon strip
  • •Headed bullet groups
  • •2x2 photo grid
Halaman 20
Conclusion / investment summary

Setting the Pace for Mid-Tier Producers — Investment Summary

Konten

Summary table by theme: Team (quality team aligned with shareholders, five years of meeting or beating production guidance), Gold exposure (7 Moz unhedged reserves, 13.7 Moz unhedged resources), ESG (community partnerships and international-standard programs) and Growth (strong cash flow, large land position on greenstone belts, more than 100,000 m of drilling in 2026, aiming to be a sustainable 500 koz+ producer by 2027).

Struktur Tata Letak

Four-row table with navy label cells on the left and bullet text on translucent white cells, over a faded photo of haul trucks.

Elemen Visual Utama

  • •Row-labelled summary table
  • •Haul truck background photo
  • •Bullet points
Halaman 21
Closing / contact slide

West African Resources Ltd — Closing Slide

Konten

Closing slide repeating 'West Africa's growing mid-tier gold producer' with the website www.westafricanresources.com and ticker ASX: WAF.

Struktur Tata Letak

Full-width group photo of the mine workforce celebrating between two large haul trucks, with a navy band at the bottom for the name, tagline, website and ticker.

Elemen Visual Utama

  • •Workforce group photo
  • •CAT haul trucks
  • •Navy footer band with contact details
Halaman 22
Capital structure / shareholder information

West African Resources Ltd — Capital Structure

Konten

ASX: WAF capital structure: 1,144,102,726 ordinary shares, 7,841,788 performance rights, top 20 holders 63%, cash US$830m and gold US$151m at 30 September 2026, Kiaka debt facilities US$213m, market capitalisation A$3,638m at A$3.18/share; analyst coverage from Argonaut, Barrenjoey, Canaccord, Cormark, Euroz Hartleys and Macquarie; investors by location Australia & NZ 53.3%, Europe 24.5%, North America 19.2%, Asia 2.9%; by type institutional 61.7%, retail 11.8%, Helikon Investments 11.8%, L1 Capital 6.9%, State Street 6.1%, insiders and management 1.6%.

Struktur Tata Letak

Two tables on the left (capital structure, analyst coverage), a horizontal bar chart of investor geography top right and a pie chart of investor type bottom right.

Elemen Visual Utama

  • •Capital structure table
  • •Analyst coverage table
  • •Horizontal bar chart
  • •Pie chart
Halaman 23
Appendix / data table

Mineral Resources

Konten

JORC Mineral Resource table by deposit with cut-off grades and Measured, Indicated, Inferred and Total tonnes, grade and contained gold: total 458.5 Mt at 0.9 g/t for 13.7 Moz (Measured 990 koz, Indicated 8,450 koz, Inferred 4,220 koz), led by Kiaka at 9,200 koz and M1 South Underground at 1,320 koz at 8.0 g/t.

Struktur Tata Letak

Full-width data table with a navy header row, beige unit row and grey total row.

Elemen Visual Utama

  • •Multi-level header table
  • •Deposit rows
  • •Highlighted total row
Halaman 24
Appendix / data table

Ore Reserves

Konten

JORC Ore Reserve table by deposit for Proved, Probable and Proved + Probable: total 214.5 Mt at 1.0 g/t for 6,990 koz (Proved 870 koz, Probable 6,120 koz), with Kiaka at 4,620 koz, M1 South UG at 950 koz at 5.8 g/t, Toega at 580 koz and M5 Open Pit at 460 koz.

Struktur Tata Letak

Full-width data table matching the resource table style: navy category headers, beige unit row and grey total row.

Elemen Visual Utama

  • •Reserve table by deposit
  • •Proved/Probable column groups
  • •Total row

Pertanyaan yang Sering Diajukan

Pertanyaan umum tentang slide ini dan konten presentasi yang mendasarinya.

What is the West African Resources Investor Presentation October 2026?

It is a 24-slide investor presentation from West African Resources Limited (ASX: WAF), dated 29 October 2026 and lodged with the ASX. It presents WAF as West Africa's growing mid-tier gold producer, targeting more than 500,000 oz a year from 2027, and covers guidance, financial highlights, the Kiaka and Sanbrado operations, drilling results, ESG and capital structure.

What are the key numbers in the deck?

2026 production guidance is 430,000–490,000 oz at AISC under US$1,900/oz, with 360,857 oz produced year to date at US$1,725/oz. H1 2026 NPAT was A$437 million, Mineral Resources are 13.7 Moz, Ore Reserves 7 Moz, and the 10-year target averages 533,000 oz a year (2026–2035), peaking at 596,000 oz in 2030.

Are the figures in Australian or US dollars?

Both, as labelled on each slide. Corporate figures such as NPAT (A$437m), the special dividend (A$0.20), market capitalisation (A$3,638m) and cash plus bullion (A$1,412m) are in Australian dollars. Operating and balance-sheet items such as AISC, gold price assumptions, cash (US$830m), gold (US$151m) and debt (US$213m) are in US dollars. WAF reports on calendar years, so 'H1' means January–June 2026.

Which mines does West African Resources operate?

WAF operates two production centres in south-central Burkina Faso: Sanbrado (open pit and underground, first gold in March 2020, including the Toega and MV3 deposits) and Kiaka (a large open-pit operation, first gold in June 2025). The Burkina Faso government holds a 15% stake in each.

Where can I find the original document?

The presentation was lodged with the Australian Securities Exchange (ASX) under ticker WAF and is also available from the investor centre on westafricanresources.com. This gallery page provides the original PDF and an editable PPTX conversion.

Can I use this deck as a template for my own mining investor presentation?

Yes. Its structure is a good model for a resources company: cover, legal notice, KPI snapshot, leadership, project map, highlights, production forecast chart, per-asset fact sheets with site maps, drilling sections, people, safety, ESG, investment summary and JORC appendix tables. Download the PPTX version to edit the layouts.

What is the editable PPTX version, and how accurate is it?

The PPTX is a machine conversion of the original PDF, so text boxes and tables are editable but complex diagrams such as drill sections and maps come across largely as images. Check spacing and fonts before reusing slides.

What do the JORC resource and reserve tables show?

Slide 23 lists Mineral Resources of 458.5 Mt at 0.9 g/t for 13.7 Moz of gold across ten deposits and stockpiles, and slide 24 lists Ore Reserves of 214.5 Mt at 1.0 g/t for 6.99 Moz. Kiaka holds the largest share, while M1 South Underground is the highest-grade deposit.

Sumber & bacaan lanjutan

2slides

Create Your Own Slides

Turn your ideas into professional presentations in seconds with 2slides AI.

Buat Slide Kelas Dunia dalam Hitungan Detik

Referensikan desain profesional, pilih gaya Anda, dan hasilkan slide dengan rendering teks sempurna. Didukung oleh Nano Banana—mulai buat presentasi Anda sekarang.

2Slides logo

Agen AI Anda untuk slide. Hemat waktu, bersinar lebih cepat dengan pembuatan presentasi yang cerdas.

Ringkas dengan AI

ChatGPTClaudeGrokPerplexity
Semua layanan online

© 2026 2slides. Hak cipta dilindungi.