Logo 2Slides
Preview

Regis Resources Duketon Site Visit Presentation November 2026

39 slide

Bagian dari Contoh presentasi investor Β· Contoh presentasi investor Australia

Regis Resources Duketon Site Visit Presentation (November 2026): a 39-slide analyst site-visit deck from the ASX-listed Australian gold producer (ASX: RRL), lodged with the ASX on 2 November 2026, covering FY27 guidance, Q1 FY27 results, the Duketon operations in Western Australia, underground reserve growth, Tropicana and the McPhillamys project.

4 suka
0 unduhan

Menggunakan sampul presentasi ini sebagai referensi gaya untuk slide yang dibuat dari konten Anda sendiri. Atau pilih halaman mana pun di bawah untuk memakai tata letaknya sebagai referensi.

Navigasi Cepat

Tag

Regis Resources
RRL
ASX
Gold mining
Investor presentation

Bagikan slide

Deskripsi

Topik Utama

Regis Resources Duketon Site Visit Presentation (November 2026): a 39-slide analyst site-visit deck from the ASX-listed Australian gold producer (ASX: RRL), lodged with the ASX on 2 November 2026, covering FY27 guidance, Q1 FY27 results, the Duketon operations in Western Australia, underground reserve growth, Tropicana and the McPhillamys project.

Manfaat Utama

  • β€’A complete, real-world mining site-visit deck: corporate snapshot, guidance, cash build, operating model, geology, operations, contractors, exploration and growth pipeline in one flow
  • β€’Shows how a mid-tier gold producer presents reserve replacement and underground growth with long-section drill images and stacked reserve/depletion charts
  • β€’Clean gold-and-white visual system with section dividers, KPI callouts and appendix tables of Ore Reserves and Mineral Resources
  • β€’All amounts are in Australian dollars (A$) unless stated; Australian financial year FY27 covers July 2026 to June 2027

Target Audiens

  • β€’Mining and resources equity analysts and fund managers
  • β€’Investor relations teams at mining companies preparing site visits or investor days
  • β€’Students and researchers studying gold producers and ASX-listed resources companies
  • β€’Presentation designers looking for a resources-sector investor deck reference

Kasus Penggunaan

  • β€’Building an analyst site-visit or operations tour presentation
  • β€’Benchmarking how a gold miner communicates guidance, AISC, reserves and dividends
  • β€’Research on Regis Resources, the Duketon Greenstone Belt, Tropicana and McPhillamys
  • β€’Template reference for reserve tables, long-section drilling slides and operating-model diagrams

Proposisi Nilai Unik

  • β€’Original deck lodged with the ASX, not a summary or reconstruction
  • β€’Covers both the investment case (FCF per share, fully franked dividends, A$1.28B cash and bullion) and the technical story (geology, mills, fleets, drilling)
  • β€’Includes peer comparisons of FY26 free cash flow per share and dividend yield across ASX gold producers with source tables

Halaman Slide (39)

Tampilan detail setiap halaman slide, termasuk tata letak, konten utama dan elemen visual.

Halaman 1
title slide

Analyst Duketon Site Visit – Continuing to Deliver and Grow Value

Konten

Cover slide for the 2 November 2026 analyst site visit to Regis Resources' Duketon operations (ASX: RRL).

Struktur Tata Letak

Logo and title block on the left, large gold-and-aerial-photo 'R' brand graphic sweeping across the right.

Elemen Visual Utama

  • β€’Regis Resources logo
  • β€’Gold metallic brand mark filled with open-pit imagery
  • β€’Date and ticker
Halaman 2
disclaimer

Cautionary statement

Konten

Forward-looking statement and JORC Code disclaimers; notes Tropicana is reported at Regis' 30% share and that USD figures convert at 0.72 AUD:USD.

Struktur Tata Letak

Two dense columns of small legal text under a gold title.

Elemen Visual Utama

  • β€’Two-column legal text
Halaman 3
company overview

Corporate Snapshot

Konten

~758.7M shares, A$6.25 share price, ~A$4.7B market cap, nil debt and A$1.3B cash and bullion; lists the board, key management, broker coverage and a register-by-geography donut (35.6% Australia, 39.5% North America).

Struktur Tata Letak

Left panel with board and management lists; right panels with capital structure plus donut chart and a broker logo grid, all in dashed gold boxes.

Elemen Visual Utama

  • β€’Donut chart of shareholder geography
  • β€’Broker logo grid
  • β€’Dashed panel borders
Halaman 4
asset portfolio map

Unhedged, Dividend Paying Producer With Long Life Assets

Konten

Portfolio map: Duketon (100%, 10Mtpa, FY27 guidance 240-270koz, 4.0Moz resources), Tropicana (30%, 120-130koz) and McPhillamys in NSW (1.9Moz reserve, FID targeted H1 CY28); group resources 8.3Moz and reserves 3.9Moz.

Struktur Tata Letak

Map of Australia with WA and NSW highlighted in yellow, asset callouts placed around it, group totals at bottom right.

Elemen Visual Utama

  • β€’Australia map
  • β€’Asset callouts with bullet icons
  • β€’Large group resource and reserve figures
Halaman 5
guidance table

FY27 Guidance – Delivering Growth Today

Konten

Group FY27 guidance of 360-400koz at AISC A$2,990-3,390/oz, growth capital A$250-270M, exploration A$80-90M; Duketon production skewed to H2 and a ~A$220-240M catch-up tax payment in the December quarter.

Struktur Tata Letak

Guidance table with the Duketon column outlined, stacked bar showing Duketon and Tropicana contribution on the right.

Elemen Visual Utama

  • β€’Guidance table
  • β€’Stacked production bar
  • β€’Highlighted Duketon column
Halaman 6
quarterly highlights

Q1 FY27 Highlights

Konten

LTIFR of 0.0; cash and bullion up A$93M to A$1.28B; final FY26 dividend of 20c (A$152M) paid; group production 83.0koz at AISC A$3,617/oz; gold sales 74.5koz at A$6,088/oz; Federal Court ruled the McPhillamys Section 10 declaration invalid.

Struktur Tata Letak

Bulleted list with bold lead-ins and indented operating-site sub-bullets.

Elemen Visual Utama

  • β€’Gold bullet icons
  • β€’Bold key figures
Halaman 7
peer comparison chart

Sector leading free cash flow per share

Konten

Ranks ASX gold producers by FY26 free cash flow per fully diluted share; Regis at A$1.06/share, described as the highest of any dividend-paying ASX gold producer.

Struktur Tata Letak

Horizontal bar chart with company logos as labels; the Regis bar is gold and boxed.

Elemen Visual Utama

  • β€’Horizontal bar chart
  • β€’Peer logos
  • β€’Highlighted Regis bar
Halaman 8
shareholder returns

Delivering consistent, fully franked dividends

Konten

Dividends resumed in 2H FY25 (5cps, A$38M); FY26 total 35cps (A$265M) for a 6.5% grossed-up yield; ~A$850M declared since 2013; FY26 dividend yield compared with peers including franking value.

Struktur Tata Letak

Photo of gold pour on the left, three gold circles with dividend milestones, peer yield bar chart on the right.

Elemen Visual Utama

  • β€’Gold pour photo
  • β€’Circular KPI badges
  • β€’Stacked yield bar chart
Halaman 9
data visualization

Delivered ~$1.2B net cash and bullion build in 24 months

Konten

Quarterly cash and bullion grew from A$80M (Sep-24) to A$1,277M (Sep-26), with dividend payments of A$38M and A$114M marked along the way.

Struktur Tata Letak

Column chart with curved arrows showing quarterly increments and red arrows for dividend outflows; note box upper left.

Elemen Visual Utama

  • β€’Waterfall-style column chart
  • β€’Increment arrows
  • β€’Callout box
Halaman 10
business model diagram

The Regis Operating Model

Konten

Cycle of low-cost ounce replacement (~A$76/oz at Duketon), strong free cash flow, and reinvestment for growth, feeding fully franked dividends (+A$300M in 18 months, 6.5% yield).

Struktur Tata Letak

Central ring diagram around 'Duketon infrastructure' with three numbered segments and side text panels; arrows down to shareholder returns.

Elemen Visual Utama

  • β€’Ring diagram
  • β€’Numbered segments
  • β€’Arrow flow
Halaman 11
geology overview

Duketon Regional Geology

Konten

The Archean Duketon Greenstone Belt is a 100 x 50km domain similar to the Laverton belt; mineralisation styles include shear-related, quartz dolerite, intrusion-related, stockwork and BIF-hosted deposits.

Struktur Tata Letak

Geology map on the left, bulleted explanation on the right.

Elemen Visual Utama

  • β€’Regional geology map with mills marked
  • β€’Bullet list
Halaman 12
operations comparison table

Duketon Operational Footprint

Konten

A 2,500km2 land package split into Duketon South and North: reserves by open pit, underground and stockpiles, active pits and underground mines, Garden Well, Rosemont and Moolart Well mills, plus a 9MW solar array.

Struktur Tata Letak

Map on the left and a comparison table of Duketon South vs North on the right.

Elemen Visual Utama

  • β€’Geology map
  • β€’Two-column comparison table
Halaman 13
safety/ESG data

Safety Performance

Konten

Historical LTIFR and TRIFR trends since 2017 and growth in safety interactions since FY21, with programs like My Choices and 'Stuff That Can Kill You'.

Struktur Tata Letak

Line chart and column chart stacked on the left, bullet list on the right.

Elemen Visual Utama

  • β€’Line chart
  • β€’Column chart
  • β€’Bullet list
Halaman 14
ESG

ESG Priorities

Konten

FY26 targets for emissions, rehabilitation (>200ha) and water (<3.1GL) achieved; FY27 targets set; community engagement with the Tjalkadjara People after their Native Title Determination.

Struktur Tata Letak

Three target columns across the top, community text bottom left, four photos on the right.

Elemen Visual Utama

  • β€’Solar farm aerial photo
  • β€’Community and rehabilitation photos
  • β€’Green 'ACHIEVED' labels
Halaman 15
operational data dashboard

Production – Gaining Ground

Konten

Half-yearly charts H1FY23-H2FY27 of open-pit material mined, strip ratio, ounces mined and underground development metres, showing ramp-up in FY27.

Struktur Tata Letak

Six small column charts in a grid with forecast bars in yellow; bullet list on the right.

Elemen Visual Utama

  • β€’Small-multiple column charts
  • β€’Forecast highlights
Halaman 16
partner overview

Open Pit Mining Skills – MACA our long-term open pit partner

Konten

MACA has provided mining, drilling, blasting and maintenance at Duketon since 2010; fleet includes 400t Hitachi EX3600 excavators and 28 Komatsu dump trucks.

Struktur Tata Letak

Bullet points on top, two fleet tables below, Thiess and MACA logos bottom right.

Elemen Visual Utama

  • β€’Fleet tables
  • β€’Contractor logos
Halaman 17
partner overview

Underground Mining Skills – An Alliance with Barminco

Konten

Barminco has worked with Regis since 2019, restructured to an Alliance agreement in 2024; underground fleet of Sandvik jumbos, loaders and trucks.

Struktur Tata Letak

Bullets on top, two fleet tables, Perenti and Barminco logos on the right.

Elemen Visual Utama

  • β€’Fleet tables
  • β€’Contractor logos
Halaman 18
section divider

What gives us confidence in the future of Duketon?

Konten

Section divider introducing the reserve and growth story at Duketon.

Struktur Tata Letak

Large gold question text over a faint brand watermark.

Elemen Visual Utama

  • β€’Large headline
  • β€’Watermark logo
Halaman 19
data visualization

We replace what we mine… at a low cost per ounce

Konten

Duketon ore reserves held at 1,389koz in 2025 despite 1,265koz cumulative depletion since 2022; A$76/oz replacement cost, ~480% UG ore reserve growth at Duketon and 169% at Tropicana.

Struktur Tata Letak

Stacked column chart of reserves and cumulative depletion, three KPI boxes underneath.

Elemen Visual Utama

  • β€’Stacked columns
  • β€’KPI boxes
Halaman 20
before/after comparison

Rosemont UG – Where it started… and where we are

Konten

Compares the 2018 initial Rosemont underground resource with the current development and resource long section.

Struktur Tata Letak

Two long-section images side by side with captions.

Elemen Visual Utama

  • β€’Long-section mine images
Halaman 21
data visualization

Continuing to build sustainable underground capacity

Konten

Underground ore reserves at Duketon up ~850% since 2019, with 475koz depleted, reaching 714koz of reserves in 2025.

Struktur Tata Letak

Stacked column chart 2019-2025 with gold banner headline and trend arrow.

Elemen Visual Utama

  • β€’Stacked column chart
  • β€’Banner callout
Halaman 22
technical/exploration

Continuing to build sustainable underground capacity – Garden Well

Konten

Garden Well South (121koz reserve + 170koz depletion) and Main (352koz reserve); mineralisation confirmed 500m down plunge, with highlighted drill hits such as 10.4m @ 2.9g/t.

Struktur Tata Letak

Full-width long section with reserve callouts and red circles around drill intercepts.

Elemen Visual Utama

  • β€’Long-section
  • β€’Drill intercept callouts
  • β€’Legend
Halaman 23
technical/exploration

Continuing to build sustainable underground capacity – Rosemont

Konten

Rosemont Stage 3 holds a 167koz reserve; intercepts confirm the host unit extends ~600m south of current designs.

Struktur Tata Letak

Long section with labelled zones and reserve-plus-depletion boxes.

Elemen Visual Utama

  • β€’Long-section
  • β€’Reserve callouts
  • β€’Red arrow
Halaman 24
technical/exploration

Drilling at Ben Hur Continues to Deliver

Konten

Ben Hur drilling complete; underground resource (3Mt @ 2.4g/t for 240koz) being updated and mining scenarios under study.

Struktur Tata Letak

Three bullets above a long section with drill hits.

Elemen Visual Utama

  • β€’Long-section
  • β€’Drill intercepts
Halaman 25
discovery highlight

Beamish South – 270koz Resource declared

Konten

New discovery 4km from Garden Well with a 270koz initial resource (200koz indicated); reserve drilling done, assays pending.

Struktur Tata Letak

Aerial map with distance arrow on the left, bullets and italic pull-quote on the right.

Elemen Visual Utama

  • β€’Satellite map
  • β€’~4km arrow
  • β€’Pull-quote
Halaman 26
growth project

Utilising our infrastructure advantage

Konten

Moolart mill restarted; BuckWell adds ~223koz over ~5.7 years with A$268M pre-tax NPV and 127% IRR; Duketon mill throughput up 10% from 7.4Mt (FY25) to 8.1Mt (FY26).

Struktur Tata Letak

Annotated satellite image left; bullets, before/after throughput tiles and boxed statement right.

Elemen Visual Utama

  • β€’Annotated aerial image
  • β€’KPI tiles with arrow
Halaman 27
section divider

Tropicana – Our valued Joint Venture

Konten

Section divider for the 30%-owned Tropicana joint venture.

Struktur Tata Letak

Gold title text over watermark.

Elemen Visual Utama

  • β€’Large title
  • β€’Watermark
Halaman 28
technical/exploration

Tropicana Underground – More value than just Reserves

Konten

Havana underground on track for first production in H1 CY2027; infill drilling at Havana South and work around Swizzler.

Struktur Tata Letak

Bullets left, 3D long section of the Tropicana pits right.

Elemen Visual Utama

  • β€’3D long section
  • β€’Legend
Halaman 29
technical/exploration

Tropicana Underground – drilling results

Konten

Two long sections of Tropicana and Havana/Havana South showing intercepts outside resource, including 4m @ 23.1g/t and 51m @ 2.5g/t.

Struktur Tata Letak

Two long-section images side by side.

Elemen Visual Utama

  • β€’Long sections
  • β€’Intercept labels
Halaman 30
section divider

Organic Growth – Step changing production and cost

Konten

Section divider introducing McPhillamys.

Struktur Tata Letak

Title and subtitle over watermark.

Elemen Visual Utama

  • β€’Large title
Halaman 31
project economics

McPhillamys – 1.9Moz Reserve

Konten

PFS: after-tax NPV A$1.1B and 21.8% IRR at A$4,000/oz, ~10 years at 190koz a year average, LOM AISC A$1,718/oz; Federal Court ruled the Section 10 declaration invalid while Regis progresses the IWL alternative.

Struktur Tata Letak

Bullets top left, site plan top right, production and AISC combo chart below, boxed footnote.

Elemen Visual Utama

  • β€’Combo bar and dot chart
  • β€’Site plan
  • β€’Boxed note
Halaman 32
summary/conclusion

Regis Resources – The Golden Opportunity

Konten

Summary of the investment case: infrastructure, debt-free balance sheet with A$1.3B cash and bullion, low-cost discovery, sector-leading FCF and dividends, and a permitting pathway for McPhillamys.

Struktur Tata Letak

Boxed headline, checkmark list, boxed closing line, small ring diagram top right.

Elemen Visual Utama

  • β€’Checkmark list
  • β€’Framed statements
Halaman 33
business model diagram

The Regis Operating Model (recap)

Konten

Repeats the operating-model cycle diagram from page 10 as a closing reminder.

Struktur Tata Letak

Ring diagram with side panels and arrows.

Elemen Visual Utama

  • β€’Ring diagram
Halaman 34
contact/closing slide

Contact

Konten

Investor relations contact: Mathew Collings, Head of Investor Relations.

Struktur Tata Letak

Logo left, brand graphic center, contact text right.

Elemen Visual Utama

  • β€’Brand graphic
  • β€’Contact details
Halaman 35
section divider

Appendix

Konten

Appendix divider.

Struktur Tata Letak

Title over watermark.

Elemen Visual Utama

  • β€’Large title
Halaman 36
data table

Regis Group Ore Reserves Table

Konten

Attributable ore reserves at 31 December 2025: Duketon 38Mt @ 1.1g/t for 1,389koz, Tropicana (30%) 576koz, plus McPhillamys 56Mt @ 1.1g/t for 1,890koz as at 31 May 2026.

Struktur Tata Letak

Two data tables with gold subtotal rows.

Elemen Visual Utama

  • β€’Reserve tables
  • β€’Shaded subtotal rows
Halaman 37
data table

Regis Group Mineral Resources Table

Konten

Attributable mineral resources at 31 December 2025 totalling 209Mt @ 1.2g/t for 8,280koz, broken down by Duketon North/South, Tropicana, McPhillamys and Discovery Ridge.

Struktur Tata Letak

Single wide resource table with measured, indicated, inferred and total columns.

Elemen Visual Utama

  • β€’Resource table
Halaman 38
appendix data table

Source Data – FY26 Dividend Yield Comparison

Konten

Peer dividend data (NST, EVN, CMM, RMS, WGX, GMD, VAU) with franking, closing prices and ASX announcement sources.

Struktur Tata Letak

Single source table.

Elemen Visual Utama

  • β€’Source table
Halaman 39
appendix data table

Source Data – FY26 Free Cash Flow Data Sources

Konten

Calculation of FY26 free cash flow per share for Regis (A$806M FCF, A$1.06/share) and peers from operating and investing cash flow and fully diluted shares.

Struktur Tata Letak

Single calculation table with lettered columns.

Elemen Visual Utama

  • β€’Calculation table

Pertanyaan yang Sering Diajukan

Pertanyaan umum tentang slide ini dan konten presentasi yang mendasarinya.

What is the Regis Resources Duketon site visit presentation?

It is a 39-slide deck Regis Resources (ASX: RRL) lodged with the ASX on 2 November 2026 for an analyst visit to its Duketon gold operations in Western Australia. It covers FY27 guidance, Q1 FY27 results, operations, reserve growth, Tropicana and the McPhillamys project.

What is Regis Resources' FY27 production guidance?

Group guidance is 360-400koz of gold at an AISC of A$2,990-3,390/oz: 240-270koz from Duketon and 120-130koz from its 30% share of Tropicana. Amounts are in Australian dollars; FY27 covers July 2026 to June 2027.

How did Regis perform in Q1 FY27?

Group production was 83.0koz at an AISC of A$3,617/oz, gold sales were 74.5koz at A$6,088/oz, and cash and bullion rose A$93M to A$1.28B with no debt.

What is the status of the McPhillamys project?

The PFS shows a 1.9Moz reserve, after-tax NPV of A$1.1B and 21.8% IRR at A$4,000/oz. The Federal Court ruled the Section 10 declaration invalid; Regis is progressing an alternative waste landform option and targets FID in H1 CY28.

Can I download this deck as an editable PowerPoint?

The original PDF is available on this page, and where a PowerPoint version is offered it has been converted and checked slide by slide against the PDF so you can reuse the layouts.

What slide designs can I reuse from this mining deck?

Useful layouts include the guidance table with a highlighted column, the cash build column chart with increment arrows, the operating-model ring diagram, peer bar charts with logos, long-section drilling slides and appendix reserve tables.

Where was this presentation published?

It was lodged with the Australian Securities Exchange (ASX) by Regis Resources on 2 November 2026, alongside the company's bi-annual exploration update.

2slides

Create Your Own Slides

Turn your ideas into professional presentations in seconds with 2slides AI.

Buat Slide Kelas Dunia dalam Hitungan Detik

Referensikan desain profesional, pilih gaya Anda, dan hasilkan slide dengan rendering teks sempurna. Didukung oleh Nano Bananaβ€”mulai buat presentasi Anda sekarang.

2Slides logo

Agen AI Anda untuk slide. Hemat waktu, bersinar lebih cepat dengan pembuatan presentasi yang cerdas.

Ringkas dengan AI

ChatGPTClaudeGrokPerplexity
Semua layanan online

Β© 2026 2slides. Hak cipta dilindungi.