Logo 2Slides
Preview

Coal India Q2 FY27 Earnings Presentation

52 slide

Bagian dari Contoh presentasi investor · Contoh presentasi investor India

Coal India Q2 FY27 earnings presentation (Physical and Financial Performance H1 2026-27): Coal India Ltd's 52-slide results deck filed with BSE/NSE, covering Q2 and H1 of fiscal 2026-27 (April–September 2026) — coal production, offtake, overburden removal, inventory, consolidated P&L in ₹ crore, subsidiary profits, receivables, ratios and line-by-line variance analysis.

2 suka
0 unduhan

Menggunakan sampul presentasi ini sebagai referensi gaya untuk slide yang dibuat dari konten Anda sendiri. Atau pilih halaman mana pun di bawah untuk memakai tata letaknya sebagai referensi.

Navigasi Cepat

Tag

Coal India
COALINDIA
Coal India Q2 FY27
Coal India H1 2026-27 results
Investor presentation

Bagikan slide

Deskripsi

Topik Utama

Coal India Q2 FY27 earnings presentation (Physical and Financial Performance H1 2026-27): Coal India Ltd's 52-slide results deck filed with BSE/NSE, covering Q2 and H1 of fiscal 2026-27 (April–September 2026) — coal production, offtake, overburden removal, inventory, consolidated P&L in ₹ crore, subsidiary profits, receivables, ratios and line-by-line variance analysis.

Manfaat Utama

  • •Q2 FY27 consolidated PAT of ₹6,547 crore (+57%) on revenue from operations of ₹44,179 crore (+21%)
  • •H1 FY27 PAT ₹15,397 crore (+19%) on revenue ₹90,434 crore (+14%); offtake 384.20 MT (+8%) while production dipped 2% to 321.00 MT
  • •Subsidiary-level tables for ECL, BCCL, CCL, NCL, WCL, SECL, MCL, NEC and CMPDIL
  • •Price-volume revenue bridges split by FSA, e-auction and washed coal with ₹ crore impacts
  • •Every expense line explained with a 'Reason of Variance' slide
  • •Editable PPTX plus PDF download

Target Audiens

  • •Equity analysts and investors covering Indian PSUs and coal/energy
  • •Commodity and power-sector researchers
  • •Finance teams building results decks for state-owned or mining companies
  • •Students studying Indian public-sector financial reporting

Kasus Penggunaan

  • •Reviewing Coal India's Q2/H1 FY27 results
  • •Benchmarking a mining or energy company results deck
  • •Template for KPI cards, subsidiary tables and variance-analysis slides
  • •Teaching price/volume revenue bridge analysis

Proposisi Nilai Unik

  • •Primary-source deck from India's largest coal producer, filed with the stock exchanges
  • •Unusually granular variance explanations for each cost line
  • •Consistent green mining-themed design across 52 slides

Halaman Slide (52)

Tampilan detail setiap halaman slide, termasuk tata letak, konten utama dan elemen visual.

Halaman 1
Title slide

Coal India Ltd – Physical and Financial Performance H1 2026-27

Konten

Cover slide titled 'COAL INDIA LTD – Physical and Financial Performance H1 2026-27' (Indian fiscal year FY27, April–September 2026).

Struktur Tata Letak

Photo collage on the left (aerial coal handling plant, dragline in a circular frame, a surface miner, a solar park) with the serif green company name and subtitle on the right

Elemen Visual Utama

  • •Hexagonal and circular photo crops
  • •Coal India logo
  • •Large green serif title
Halaman 2
Highlights / key events

Major Events in H1 2026-27: Overseas subsidiary and iron ore block

Konten

CIL incorporated Singapore-based wholly owned subsidiary CIL Global Pte. Ltd. on 24.08.2026 to pursue overseas critical-minerals asset acquisitions; CIL was named preferred bidder for the Gadadharpur Iron Ore Block in Kendujhar, Odisha, with estimated resources of 288 MT.

Struktur Tata Letak

Light green-to-yellow gradient background with Coal India logo top-left, green title, and a footer strip of mining icons (excavator, dumper, washery, coal heap, train, power plant, handshake); two underlined green headings with justified paragraphs on the left, Merlion and iron-ore photos in rounded frames on the right

Elemen Visual Utama

  • •Singapore Merlion photo
  • •Iron ore lumps photo
  • •Underlined section headings
Halaman 3
Highlights / key events

Major Events in H1 2026-27: MCL silo, MCL IPO and coal gasification

Konten

MCL commissioned the 10 MTPA Lakhanpur Silo on 30.08.2026 and filed the DRHP for MCL's IPO on 01.09.2026; the foundation stone of India's first commercial coal gasification project was laid on 20 June 2026 by the President and Prime Minister — a ₹25,000 crore investment by BCGCL (CIL–BHEL JV) with 6.6 lakh tonnes per year of ammonium nitrate capacity.

Struktur Tata Letak

Light green-to-yellow gradient background with Coal India logo top-left, green title, and a footer strip of mining icons (excavator, dumper, washery, coal heap, train, power plant, handshake); MCL and BCGCL logo tiles on the left, each paired with a text block on the right

Elemen Visual Utama

  • •MCL logo tile
  • •BCGCL logo tile
  • •Underlined green subheading
Halaman 4
Highlights / key events

Major Events in H1 2026-27: Coal washing and revenue-sharing MDO

Konten

BCCL's new 2.0 MTPA Bhojudih Coal Washery began commercial operations on 26 May 2026, lifting BCCL washing capacity to 17.35 MTPA (including 1.70 MTPA via TSL); production started at the ASGKCC Mine (Katras Area) under a revenue-sharing MDO model with BCCL receiving 9% of revenue, contributing 13,400 tonnes in H1.

Struktur Tata Letak

Light green-to-yellow gradient background with Coal India logo top-left, green title, and a footer strip of mining icons (excavator, dumper, washery, coal heap, train, power plant, handshake); two image-plus-text rows, coal pile photo and rupee coin illustration on the left

Elemen Visual Utama

  • •Coal pile photo
  • •Gold rupee coin graphic
  • •Underlined headings
Halaman 5
Highlights / key events

Major Events in H1 2026-27: Solar power capacity

Konten

CIL commissioned 200 MW of its 300 MW Khavda (Gujarat) solar project on 08.07.2026 and received GEDA's commissioning certificate for the 100 MW Bhadramali plant (effective 31.03.2026); for the first time Coal India booked revenue from sale of energy — ₹15.29 crore in H1 2026-27.

Struktur Tata Letak

Light green-to-yellow gradient background with Coal India logo top-left, green title, and a footer strip of mining icons (excavator, dumper, washery, coal heap, train, power plant, handshake); text column on the left, illustrated solar-panel, pylon and rupee-growth image on the right

Elemen Visual Utama

  • •Solar panels with rising green arrow illustration
  • •Underlined italic revenue callout
Halaman 6
KPI dashboard

Physical Performance H1 2026-27

Konten

Three KPI cards: coal production 321.00 MT vs 329.14 MT (down 2%); coal offtake 384.20 MT vs 357.05 MT (up 8%); overburden removal 857.61 M.CuM vs 855.69 (up 0.2%).

Struktur Tata Letak

Light green-to-yellow gradient background with Coal India logo top-left, green title, and a footer strip of mining icons (excavator, dumper, washery, coal heap, train, power plant, handshake); three grey KPI cards each with a circular photo, a coloured change pill, a large blue figure and two comparison bars

Elemen Visual Utama

  • •Red down / green up percentage pills
  • •Large blue numerals
  • •Horizontal comparison bars
Halaman 7
Data table + stacked chart

Coal Production (Mill. Te) – H1 by subsidiary

Konten

H1 2026-27 production of 321.00 MT against a 348.49 MT target (H1 25-26: 329.14, -2%). CCL +20% (35.47), ECL +10%, WCL +9%, SECL +6% (76.88); NCL -16% (57.99), MCL -9% (87.54), BCCL -13%. Departmental 97.40 MT (30%) vs contractual 223.60 MT (70%).

Struktur Tata Letak

Light green-to-yellow gradient background with Coal India logo top-left, green title, and a footer strip of mining icons (excavator, dumper, washery, coal heap, train, power plant, handshake); subsidiary table (target, actual, prior year, variance with arrows) on the left, 100% stacked departmental/contractual bar chart and summary lines on the right

Elemen Visual Utama

  • •Alternating grey/yellow table rows
  • •Green/red variance with arrows
  • •100% stacked bar chart by subsidiary
Halaman 8
Data table + bar chart

Coal Offtake (Mill. Te) – H1 by subsidiary

Konten

H1 offtake 384.20 MT vs 407.52 MT target and 357.05 MT last year (+8%). MCL 111.29 (+8%), SECL 89.89 (+7%), CCL 42.54 (+27%), WCL 34.88 (+22%), ECL 27.23 (+21%); NCL -9%, BCCL -3%. Mode-wise offtake: rail + MGR 257 MT, road 123 MT, others 4 MT.

Struktur Tata Letak

Light green-to-yellow gradient background with Coal India logo top-left, green title, and a footer strip of mining icons (excavator, dumper, washery, coal heap, train, power plant, handshake); subsidiary table on the left, 3D column chart of mode-wise offtake on the right

Elemen Visual Utama

  • •Variance column with arrows
  • •3D column chart (Rail+MGR, Road, Others)
Halaman 9
Data table + stacked chart

OB Removal (Mill. CuM) – H1 by subsidiary

Konten

Overburden removal 857.61 M.CuM vs 903.47 target and 855.69 last year (+0.2%). WCL +36%, CCL +34%, ECL +19%; BCCL -21%, MCL -21%, NCL -11%. Departmental 98.24 M.CuM (11%) vs contractual 759.37 M.CuM (89%).

Struktur Tata Letak

Light green-to-yellow gradient background with Coal India logo top-left, green title, and a footer strip of mining icons (excavator, dumper, washery, coal heap, train, power plant, handshake); table left, stacked departmental/contractual chart right

Elemen Visual Utama

  • •Variance arrows
  • •100% stacked bars
  • •Green summary totals
Halaman 10
Data table + pie chart

Inventory – raw coal stock

Konten

Raw coal closing stock fell to 66.58 MT on 30-09-2026 from 130.28 MT on 01-04-2026 (down 63.70 MT, 49%), from 107.16 MT a year earlier (down 40.58 MT, 38%) and from 101.35 MT on 30-06-2026 (down 34.77 MT, 52% per deck). Pie shows closing stock share: MCL 30%, SECL 18%, CCL 18%, ECL 10%, BCCL 10%, WCL 8%, NCL 6%.

Struktur Tata Letak

Light green-to-yellow gradient background with Coal India logo top-left, green title, and a footer strip of mining icons (excavator, dumper, washery, coal heap, train, power plant, handshake); wide subsidiary-by-date stock table with green decrease call-out rows, 3D pie chart at right

Elemen Visual Utama

  • •Blue-highlighted closing stock row
  • •3D pie chart by subsidiary
  • •Green call-out rows
Halaman 11
KPI dashboard

Physical Performance Q2 2026-27

Konten

Q2 KPI cards: coal production 151.37 MT vs 145.82 MT (+4%); coal offtake 186.34 MT vs 166.10 MT (+12%); OB removal 352.92 M.CuM vs 349.11 (+1%).

Struktur Tata Letak

Light green-to-yellow gradient background with Coal India logo top-left, green title, and a footer strip of mining icons (excavator, dumper, washery, coal heap, train, power plant, handshake); same three-card KPI design as the H1 slide

Elemen Visual Utama

  • •Green percentage pills
  • •Large blue figures
  • •Comparison bars
Halaman 12
Data table + stacked chart

Coal Production (Mill. Te) – Q2 by subsidiary

Konten

Q2 production 151.37 MT vs 157.83 target and 145.82 last year (+4%). WCL +40%, CCL +33%, ECL +23%, BCCL +8%, SECL +4%, MCL flat at 45.01; NCL -17% (27.94). Departmental 45.40 MT (30%), contractual 105.97 MT (70%).

Struktur Tata Letak

Light green-to-yellow gradient background with Coal India logo top-left, green title, and a footer strip of mining icons (excavator, dumper, washery, coal heap, train, power plant, handshake); table plus 100% stacked chart, mirroring the H1 layout

Elemen Visual Utama

  • •Variance arrows
  • •Stacked departmental/contractual bars
Halaman 13
Data table

Coal Offtake (Mill. Te) – Q2 by subsidiary

Konten

Table labelled Q2 26-27 vs Q2 25-26 by subsidiary; the figures printed (overall 384.20 actual vs 407.52 target and 357.05 prior, +8%) are identical to the H1 offtake table on page 8, whereas the Q2 KPI card on page 11 shows Q2 offtake of 186.34 MT — the table appears to repeat H1 numbers.

Struktur Tata Letak

Light green-to-yellow gradient background with Coal India logo top-left, green title, and a footer strip of mining icons (excavator, dumper, washery, coal heap, train, power plant, handshake); single wide subsidiary table with variance arrows

Elemen Visual Utama

  • •Alternating row shading
  • •Green/red variance arrows
Halaman 14
Data table + stacked chart

OB Removal (Mill. CuM) – Q2 by subsidiary

Konten

Q2 OB removal 352.92 M.CuM vs 374.43 target and 349.11 last year (+1%). WCL +87% (64.99), CCL +42%, ECL +14%, NEC +188%; MCL -25%, NCL -16%, SECL -13%, BCCL -5%. Departmental 43.11 (12%), contractual 309.81 (88%).

Struktur Tata Letak

Light green-to-yellow gradient background with Coal India logo top-left, green title, and a footer strip of mining icons (excavator, dumper, washery, coal heap, train, power plant, handshake); table left, stacked chart right

Elemen Visual Utama

  • •Variance arrows
  • •Stacked bar chart
Halaman 15
Section divider

Section divider: Financial Performance Q2 2026-27

Konten

Section break introducing the Q2 2026-27 financial results.

Struktur Tata Letak

Full-bleed muted peach desk photo (calculator, glasses, documents) with white centred title and underline

Elemen Visual Utama

  • •Desk-and-calculator stock photo
  • •White uppercase title
Halaman 16
Financial highlights dashboard

Major Financial Highlights – Q2 26-27 (₹ Crore)

Konten

Q2 FY27 vs Q2 FY26: sale of product ₹43,724 cr vs ₹36,074 cr (+21%); revenue from operations ₹44,179 cr vs ₹36,553 cr (+21%); PBT ₹8,728 cr vs ₹5,992 cr (+46%); PAT ₹6,547 cr vs ₹4,167 cr (+57%); EBITDA ₹11,447 cr vs ₹8,943 cr (+28%); EBITDA margin on revenue 26% vs 24%.

Struktur Tata Letak

Light green-to-yellow gradient background with Coal India logo top-left, green title, and a footer strip of mining icons (excavator, dumper, washery, coal heap, train, power plant, handshake); 2x3 grid of mini bar charts, each comparing the current and prior quarter with a growth label

Elemen Visual Utama

  • •Six paired green bar charts
  • •Blue value labels
  • •Green growth arrows
Halaman 17
Financial statement table

Consolidated Financial Results Q2 26-27

Konten

Q2 consolidated P&L (₹ crore): revenue from operations 44,179 (+21%), other income 2,654 (+24%), total income 46,833 (+21%), expenditure 38,398 (+17%), PBT without JV 8,434 (+46%), JV profit 294, PBT 8,728 (+46%), tax 2,181, PAT 6,547 (+57%).

Struktur Tata Letak

Light green-to-yellow gradient background with Coal India logo top-left, green title, and a footer strip of mining icons (excavator, dumper, washery, coal heap, train, power plant, handshake); full-width green-tinted P&L table with arrow markers on drill-down rows and shaded subtotal rows

Elemen Visual Utama

  • •Blue current-period figures
  • •Shaded subtotal rows
  • •Arrow bullets
Halaman 18
Financial statement table

Break up of Expenditure Q2 26-27

Konten

Q2 expenditure ₹38,398 cr (+17%): employee benefits 11,777 (+8%), other expenses 11,878 (+18%), contractual 7,326 (+18%), cost of materials 2,752 (+20%), changes in inventories 3,052 (+129%), D&A 2,379 (-11%), finance costs 339, stripping activity adjustment -1,105.

Struktur Tata Letak

Light green-to-yellow gradient background with Coal India logo top-left, green title, and a footer strip of mining icons (excavator, dumper, washery, coal heap, train, power plant, handshake); expense breakdown table with red increase columns

Elemen Visual Utama

  • •Red Inc/Dec figures
  • •Bold total row
Halaman 19
Section divider

Section divider: Financial Performance H1 2026-27

Konten

Section break introducing the H1 2026-27 financial results.

Struktur Tata Letak

Same full-bleed desk photo divider as page 15 with 'H1 2026 - 27'

Elemen Visual Utama

  • •Stock photo background
  • •White title
Halaman 20
Financial highlights dashboard

Major Financial Highlights – H1 26-27 (₹ Crore)

Konten

H1 FY27 vs H1 FY26: sale of product ₹88,859 cr vs ₹78,155 cr (+14%); revenue from operations ₹90,434 cr vs ₹79,472 cr (+14%); PBT ₹20,448 cr vs ₹17,768 cr (+15%); PAT ₹15,397 cr vs ₹12,955 cr (+19%); EBITDA ₹25,796 cr vs ₹23,291 cr (+11%); EBITDA margin flat at 29%.

Struktur Tata Letak

Light green-to-yellow gradient background with Coal India logo top-left, green title, and a footer strip of mining icons (excavator, dumper, washery, coal heap, train, power plant, handshake); 2x3 grid of paired bar charts

Elemen Visual Utama

  • •Six mini bar charts
  • •Growth percentage labels
Halaman 21
Financial statement table

Consolidated Financial Results H1 26-27

Konten

H1 consolidated P&L (₹ crore): revenue from operations 90,434 (+14%), other income 4,694 (+25%), total income 95,128, expenditure 75,215 (+14%), PBT without JV 19,913, JV profit 534 (+51%), PBT 20,448 (+15%), tax 5,050 (+5%), PAT 15,397 (+19%).

Struktur Tata Letak

Light green-to-yellow gradient background with Coal India logo top-left, green title, and a footer strip of mining icons (excavator, dumper, washery, coal heap, train, power plant, handshake); full-width P&L table

Elemen Visual Utama

  • •Shaded subtotal rows
  • •Blue current figures
Halaman 22
Financial statement table

Break up of Expenditure H1 26-27

Konten

H1 expenditure ₹75,215 cr (+14%): other expenses 23,536 (+16%), employee benefits 22,800 (+4%), contractual 15,985 (+14%), cost of materials 6,012 (+24%), D&A 4,682 (-6%), changes in inventories 4,470 (+202%), finance costs 666 (+21%), stripping adjustment -2,935.

Struktur Tata Letak

Light green-to-yellow gradient background with Coal India logo top-left, green title, and a footer strip of mining icons (excavator, dumper, washery, coal heap, train, power plant, handshake); expense breakdown table

Elemen Visual Utama

  • •Red variance columns
  • •Total row
Halaman 23
Data table

Subsidiary wise Profit Before Tax H1 26-27

Konten

H1 PBT by subsidiary (₹ crore): MCL 6,575 (+7%), NCL 5,938 (-19%), SECL 2,911 (+54%), CCL 1,814 (+55%), WCL 1,352 (+76%), ECL 655 (loss to profit from -581), CMPDIL 420, BCCL 83 (-59%), CIL standalone 291; consolidated 20,448 (+15%).

Struktur Tata Letak

Light green-to-yellow gradient background with Coal India logo top-left, green title, and a footer strip of mining icons (excavator, dumper, washery, coal heap, train, power plant, handshake); subsidiary table with 'Loss to Profit' labels and green/red variance

Elemen Visual Utama

  • •Loss-to-profit label
  • •Green up arrows
Halaman 24
Data table

Subsidiary wise Profit After Tax H1 26-27

Konten

H1 PAT by subsidiary (₹ crore): MCL 4,881, NCL 4,506 (-16%), SECL 2,174 (+91%), CCL 1,353 (+60%), WCL 1,011 (+77%), ECL 493 (loss to profit), CMPDIL 311, CIL standalone 205, BCCL 56 (-55%); consolidated 15,397 (+19%).

Struktur Tata Letak

Light green-to-yellow gradient background with Coal India logo top-left, green title, and a footer strip of mining icons (excavator, dumper, washery, coal heap, train, power plant, handshake); subsidiary PAT table

Elemen Visual Utama

  • •Loss-to-profit label
  • •Variance arrows
Halaman 25
Section divider

Section divider: Trade Receivables Analysis & Ratio Analysis

Konten

Section break introducing trade receivables and financial ratio analysis.

Struktur Tata Letak

Light green-to-yellow gradient background with Coal India logo top-left, green title, and a footer strip of mining icons (excavator, dumper, washery, coal heap, train, power plant, handshake); two ellipses (grey 'Trade Receivables Analysis', green 'Ratio Analysis') joined by an ampersand

Elemen Visual Utama

  • •Grey and green ellipses
  • •Large ampersand
Halaman 26
Data table

Gross Trade Receivables – Subsidiary wise

Konten

Consolidated gross trade receivables fell to ₹13,462 cr on 30.09.2026 from ₹15,834 cr (30.06) and ₹15,985 cr (31.03.2026), down ₹2,523 cr; largest balances WCL 3,770 and MCL 3,353; biggest reductions BCCL (-1,048), SECL (-831), ECL (-672). Figures before adjustment of unbilled incentive and coal quality variance.

Struktur Tata Letak

Light green-to-yellow gradient background with Coal India logo top-left, green title, and a footer strip of mining icons (excavator, dumper, washery, coal heap, train, power plant, handshake); four-date subsidiary table with green down arrows

Elemen Visual Utama

  • •Blue latest-date column
  • •Bracketed decreases with arrows
  • •Footnote
Halaman 27
Data table

Gross Trade Receivables – Customer wise

Konten

Receivables by customer (₹ crore, 30.09.2026 vs 31.03.2026): MAHAGENCO 3,588 (+89), APGENCO 1,930, NTPC 1,107 (-720), SAIL 773, TVNL 701, APPDCL 644, UPRVUNL 623 (+340), DPL 480, RINL 391, RRVUNL 367, DVC 266 (-1,537), others 2,622; total 13,462 (-2,523).

Struktur Tata Letak

Light green-to-yellow gradient background with Coal India logo top-left, green title, and a footer strip of mining icons (excavator, dumper, washery, coal heap, train, power plant, handshake); customer table with variance arrows and footnote

Elemen Visual Utama

  • •Customer list
  • •Green down / red up variance
Halaman 28
Ratio analysis table

Key Financial Ratios

Konten

Ratios 30.09.26 vs 31.03.26: debt-equity 0.13 vs 0.12; current ratio 1.81 vs 1.86; quick ratio 1.65 vs 1.62; debtor turnover 0.76 vs 0.81 months; inventory turnover 1.04 vs 1.22 months; EBITDA margin 29% vs 32%; operating margin 18% vs 19%; gross margin 23% vs 25%; net margin 17% vs 18% (higher explosives, PoL and contractual costs); EPS ₹24.94 (H1, not annualised) vs ₹50.46; book value per share ₹206.84 vs ₹193.26.

Struktur Tata Letak

Light green-to-yellow gradient background with Coal India logo top-left, green title, and a footer strip of mining icons (excavator, dumper, washery, coal heap, train, power plant, handshake); three-column ratio table with a remarks column explaining each move

Elemen Visual Utama

  • •Up/down arrows on ratios
  • •Red remarks header
Halaman 29
Section divider

Section divider: Revenue and Expenditure Analysis H1 26-27 & Q2 26-27

Konten

Section break introducing the revenue and expenditure variance analysis for H1 and Q2.

Struktur Tata Letak

White slide with illustrated finance collage on the left (bank building, globe, rising arrow, rupee bag, notes) and bold black right-aligned title

Elemen Visual Utama

  • •Finance illustration collage
  • •Bold black title
Halaman 30
Revenue bridge table

Sale of Product H1 26-27 – price and volume analysis

Konten

Sale of product ₹88,859 cr vs ₹78,155 cr (+14%). FSA volume 327.79 MT (+19.32, impact ₹4,036 cr) at ₹2,144.49/t (+₹55.64, ₹1,824 cr); e-auction 49.31 MT (+12.93, ₹3,802 cr) at ₹3,083.95/t (₹707 cr); washed coal & other 7.45 MT (-3.23, -₹914 cr) at ₹4,487.34/t (₹1,234 cr). Overall realisation ₹2,310.34/t (+5%), sales 384.55 MT (+8%); plus ₹15.29 cr sale of energy.

Struktur Tata Letak

Light green-to-yellow gradient background with Coal India logo top-left, green title, and a footer strip of mining icons (excavator, dumper, washery, coal heap, train, power plant, handshake); header KPI row then three grouped segment tables (FSA, E-Auction, Washed Coal) with impact and remarks, summary rows and a note bar

Elemen Visual Utama

  • •Blue header cells
  • •Impact (₹ Cr) column
  • •Callout note on energy sales
Halaman 31
Revenue bridge table

Sale of Product H1 26-27 (Excl. Other Charges)

Konten

Excluding other charges, sale of product ₹62,308 cr vs ₹55,839 cr (+12%). FSA ₹1,471.52/t (+₹9.72), e-auction ₹2,303.34/t, washed coal ₹3,645.25/t; volume impacts FSA ₹2,825 cr, e-auction ₹2,911 cr, washed coal -₹773 cr. Overall realisation ₹1,620.29/t (+3%).

Struktur Tata Letak

Light green-to-yellow gradient background with Coal India logo top-left, green title, and a footer strip of mining icons (excavator, dumper, washery, coal heap, train, power plant, handshake); same segment table structure as page 30

Elemen Visual Utama

  • •Segment groupings
  • •Impact column
Halaman 32
Variance analysis

Sale of services & other revenues H1

Konten

₹1,575 cr vs ₹1,318 cr (+20%), driven by a ₹63 cr increase in inflated mileage income and a ₹204 cr increase in stripping activity provision reversal.

Struktur Tata Letak

Light green-to-yellow gradient background with Coal India logo top-left, green title, and a footer strip of mining icons (excavator, dumper, washery, coal heap, train, power plant, handshake); one-row table then 'Reason of Variance' bullet box

Elemen Visual Utama

  • •Single-row KPI table
  • •Bullet reasons
Halaman 33
Variance analysis

Other income

Konten

Other income for H1 2026-27 was ₹4,694 crore versus ₹3,756 crore a year earlier (+₹938 cr, +25%). Reasons of variance: interest on deposits up ₹1,160 cr, interest on income-tax refunds down ₹303 cr, misc income up ₹80 cr.

Struktur Tata Letak

Light green-to-yellow gradient background with Coal India logo top-left, green title, and a footer strip of mining icons (excavator, dumper, washery, coal heap, train, power plant, handshake); a four-column header table (current, prior, Inc/Dec, Inc/Dec %) above a teal 'Reason of Variance' label and a bordered bullet box

Elemen Visual Utama

  • •Blue-and-green header table
  • •Teal 'Reason of Variance' tag
  • •Bullet list with red/green ₹ crore amounts
Halaman 34
Variance analysis

Cost of materials consumed

Konten

Cost of materials consumed for H1 2026-27 was ₹6,012 crore versus ₹4,851 crore a year earlier (+₹1,161 cr, +24%). Reasons of variance: explosives up ₹430 cr, oil & lubricants up ₹678 cr, HEMM/spares/timber up ₹53 cr.

Struktur Tata Letak

Light green-to-yellow gradient background with Coal India logo top-left, green title, and a footer strip of mining icons (excavator, dumper, washery, coal heap, train, power plant, handshake); a four-column header table (current, prior, Inc/Dec, Inc/Dec %) above a teal 'Reason of Variance' label and a bordered bullet box

Elemen Visual Utama

  • •Blue-and-green header table
  • •Teal 'Reason of Variance' tag
  • •Bullet list with red/green ₹ crore amounts
Halaman 35
Variance analysis

Employee benefit expenses

Konten

Employee benefit expenses for H1 2026-27 was ₹22,800 crore versus ₹21,923 crore a year earlier (+₹877 cr, +4%). Reasons of variance: basic + DA up ₹207 cr, NCWA provision for non-executive salaries (July–Sep 2026) ₹499 cr, bonus up ₹74 cr, CMPS superannuation up ₹86 cr.

Struktur Tata Letak

Light green-to-yellow gradient background with Coal India logo top-left, green title, and a footer strip of mining icons (excavator, dumper, washery, coal heap, train, power plant, handshake); a four-column header table (current, prior, Inc/Dec, Inc/Dec %) above a teal 'Reason of Variance' label and a bordered bullet box

Elemen Visual Utama

  • •Blue-and-green header table
  • •Teal 'Reason of Variance' tag
  • •Bullet list with red/green ₹ crore amounts
Halaman 36
Variance analysis

Finance cost

Konten

Finance cost for H1 2026-27 was ₹666 crore versus ₹552 crore a year earlier (+₹114 cr, +21%). Reasons of variance: borrowing cost up ₹70 cr (mainly BCCL, ECL) and unwinding of discount on mine closure plan revision up ₹44 cr.

Struktur Tata Letak

Light green-to-yellow gradient background with Coal India logo top-left, green title, and a footer strip of mining icons (excavator, dumper, washery, coal heap, train, power plant, handshake); a four-column header table (current, prior, Inc/Dec, Inc/Dec %) above a teal 'Reason of Variance' label and a bordered bullet box

Elemen Visual Utama

  • •Blue-and-green header table
  • •Teal 'Reason of Variance' tag
  • •Bullet list with red/green ₹ crore amounts
Halaman 37
Variance analysis

Depreciation & amortisation

Konten

Depreciation & amortisation for H1 2026-27 was ₹4,682 crore versus ₹4,972 crore a year earlier (-₹290 cr, -6%). Reasons of variance: depreciation on other mining infrastructure up ₹58 cr and stripping-asset amortisation up ₹252 cr, offset by the absence of last year's ₹553 cr SECL impairment of exploration assets in safety-zone coal blocks.

Struktur Tata Letak

Light green-to-yellow gradient background with Coal India logo top-left, green title, and a footer strip of mining icons (excavator, dumper, washery, coal heap, train, power plant, handshake); a four-column header table (current, prior, Inc/Dec, Inc/Dec %) above a teal 'Reason of Variance' label and a bordered bullet box

Elemen Visual Utama

  • •Blue-and-green header table
  • •Teal 'Reason of Variance' tag
  • •Bullet list with red/green ₹ crore amounts
Halaman 38
Variance analysis

Contractual expenses

Konten

Contractual expenses for H1 2026-27 was ₹15,985 crore versus ₹14,020 crore a year earlier (+₹1,965 cr, +14%). Reasons of variance: outsourcing for coal and OB up ₹1,868 cr, transport & wagon loading up ₹145 cr, other contractual down ₹48 cr.

Struktur Tata Letak

Light green-to-yellow gradient background with Coal India logo top-left, green title, and a footer strip of mining icons (excavator, dumper, washery, coal heap, train, power plant, handshake); a four-column header table (current, prior, Inc/Dec, Inc/Dec %) above a teal 'Reason of Variance' label and a bordered bullet box

Elemen Visual Utama

  • •Blue-and-green header table
  • •Teal 'Reason of Variance' tag
  • •Bullet list with red/green ₹ crore amounts
Halaman 39
Variance analysis

Other expenses

Konten

Other expenses for H1 2026-27 was ₹23,536 crore versus ₹20,283 crore a year earlier (+₹3,252 cr, +16%). Reasons of variance: rates & taxes up ₹2,777 cr on high offtake, power up ₹264 cr, provisions for debtors up ₹73 cr, P&M repairs up ₹37 cr.

Struktur Tata Letak

Light green-to-yellow gradient background with Coal India logo top-left, green title, and a footer strip of mining icons (excavator, dumper, washery, coal heap, train, power plant, handshake); a four-column header table (current, prior, Inc/Dec, Inc/Dec %) above a teal 'Reason of Variance' label and a bordered bullet box

Elemen Visual Utama

  • •Blue-and-green header table
  • •Teal 'Reason of Variance' tag
  • •Bullet list with red/green ₹ crore amounts
Halaman 40
Data table

Subsidiary wise Profit Before Tax Q2 26-27

Konten

Q2 PBT (₹ crore): MCL 3,349 (+15%), NCL 2,541 (-31%), CCL 795 (+197%), SECL 772, WCL 378, BCCL 186 and ECL 139 (all loss to profit), CMPDIL 260, CIL standalone 80; consolidated 8,728 (+46%).

Struktur Tata Letak

Light green-to-yellow gradient background with Coal India logo top-left, green title, and a footer strip of mining icons (excavator, dumper, washery, coal heap, train, power plant, handshake); subsidiary table with loss-to-profit labels

Elemen Visual Utama

  • •Loss-to-profit labels
  • •Variance arrows
Halaman 41
Data table

Subsidiary wise Profit After Tax Q2 26-27

Konten

Q2 PAT (₹ crore): MCL 2,482 (+17%), NCL 1,890 (-29%), SECL 655, CCL 523 (+187%), WCL 282, CMPDIL 195, BCCL 124, ECL 116, CIL standalone 52; consolidated 6,547 (+57%).

Struktur Tata Letak

Light green-to-yellow gradient background with Coal India logo top-left, green title, and a footer strip of mining icons (excavator, dumper, washery, coal heap, train, power plant, handshake); subsidiary PAT table

Elemen Visual Utama

  • •Loss-to-profit labels
  • •Green growth arrows
Halaman 42
Revenue bridge table

Sale of Product Q2 26-27 – price and volume analysis

Konten

Q2 sale of product ₹43,724 cr vs ₹36,074 cr (+21%). FSA 159.71 MT (+17.02, ₹3,580 cr) at ₹2,191.94/t (₹1,411 cr); e-auction 22.79 MT (+7.67, ₹2,280 cr) at ₹3,082.21/t; washed coal 3.81 MT (-3.33, -₹727 cr) at ₹4,410.47/t. Overall realisation ₹2,346.21/t (+7%), sales 186.32 MT (+13%); plus ₹9.61 cr sale of energy.

Struktur Tata Letak

Light green-to-yellow gradient background with Coal India logo top-left, green title, and a footer strip of mining icons (excavator, dumper, washery, coal heap, train, power plant, handshake); segment price/volume tables with impact and remarks

Elemen Visual Utama

  • •Segment groupings
  • •Energy sales note bar
Halaman 43
Revenue bridge table

Sale of Product Q2 26-27 (Excl. Other Charges)

Konten

Excluding other charges ₹30,691 cr vs ₹25,532 cr (+20%); FSA ₹1,509.53/t, e-auction ₹2,283.38/t (slightly lower, -₹6 cr impact), washed coal ₹3,614.38/t; overall realisation ₹1,647.24/t (+6%).

Struktur Tata Letak

Light green-to-yellow gradient background with Coal India logo top-left, green title, and a footer strip of mining icons (excavator, dumper, washery, coal heap, train, power plant, handshake); segment tables as on page 42

Elemen Visual Utama

  • •Impact column
  • •Red reduction remark
Halaman 44
Variance analysis

Sale of services & other revenues Q2

Konten

₹455 cr vs ₹479 cr (-5%), due to a ₹31 cr decrease in stripping activity provision reversal.

Struktur Tata Letak

Light green-to-yellow gradient background with Coal India logo top-left, green title, and a footer strip of mining icons (excavator, dumper, washery, coal heap, train, power plant, handshake); one-row table and reason box

Elemen Visual Utama

  • •Red down arrow
  • •Single bullet reason
Halaman 45
Variance analysis

Other income

Konten

Other income for Q2 2026-27 was ₹2,654 crore versus ₹2,140 crore a year earlier (+₹514 cr, +24%). Reasons of variance: interest on deposits up ₹715 cr, interest from the Income Tax Department down ₹202 cr.

Struktur Tata Letak

Light green-to-yellow gradient background with Coal India logo top-left, green title, and a footer strip of mining icons (excavator, dumper, washery, coal heap, train, power plant, handshake); a four-column header table (current, prior, Inc/Dec, Inc/Dec %) above a teal 'Reason of Variance' label and a bordered bullet box

Elemen Visual Utama

  • •Blue-and-green header table
  • •Teal 'Reason of Variance' tag
  • •Bullet list with red/green ₹ crore amounts
Halaman 46
Variance analysis

Cost of materials consumed

Konten

Cost of materials consumed for Q2 2026-27 was ₹2,752 crore versus ₹2,289 crore a year earlier (+₹463 cr, +20%). Reasons of variance: explosives up ₹185 cr, oil & lubricants up ₹243 cr, HEMM/spares/timber up ₹35 cr.

Struktur Tata Letak

Light green-to-yellow gradient background with Coal India logo top-left, green title, and a footer strip of mining icons (excavator, dumper, washery, coal heap, train, power plant, handshake); a four-column header table (current, prior, Inc/Dec, Inc/Dec %) above a teal 'Reason of Variance' label and a bordered bullet box

Elemen Visual Utama

  • •Blue-and-green header table
  • •Teal 'Reason of Variance' tag
  • •Bullet list with red/green ₹ crore amounts
Halaman 47
Variance analysis

Employee benefit expenses

Konten

Employee benefit expenses for Q2 2026-27 was ₹11,777 crore versus ₹10,944 crore a year earlier (+₹832 cr, +8%). Reasons of variance: basic + DA up ₹166 cr, NCWA provision ₹499 cr, bonus up ₹66 cr, CMPS contribution up ₹40 cr.

Struktur Tata Letak

Light green-to-yellow gradient background with Coal India logo top-left, green title, and a footer strip of mining icons (excavator, dumper, washery, coal heap, train, power plant, handshake); a four-column header table (current, prior, Inc/Dec, Inc/Dec %) above a teal 'Reason of Variance' label and a bordered bullet box

Elemen Visual Utama

  • •Blue-and-green header table
  • •Teal 'Reason of Variance' tag
  • •Bullet list with red/green ₹ crore amounts
Halaman 48
Variance analysis

Finance cost

Konten

Finance cost for Q2 2026-27 was ₹339 crore versus ₹287 crore a year earlier (+₹52 cr, +18%). Reasons of variance: borrowing cost up ₹30 cr (mainly BCCL, ECL), unwinding of discount up ₹22 cr.

Struktur Tata Letak

Light green-to-yellow gradient background with Coal India logo top-left, green title, and a footer strip of mining icons (excavator, dumper, washery, coal heap, train, power plant, handshake); a four-column header table (current, prior, Inc/Dec, Inc/Dec %) above a teal 'Reason of Variance' label and a bordered bullet box

Elemen Visual Utama

  • •Blue-and-green header table
  • •Teal 'Reason of Variance' tag
  • •Bullet list with red/green ₹ crore amounts
Halaman 49
Variance analysis

Depreciation & amortisation

Konten

Depreciation & amortisation for Q2 2026-27 was ₹2,379 crore versus ₹2,664 crore a year earlier (-₹285 cr, -11%). Reasons of variance: other mining infrastructure depreciation up ₹25 cr and stripping amortisation up ₹130 cr, against a ₹388 cr SECL exploration-asset impairment in the prior-year quarter.

Struktur Tata Letak

Light green-to-yellow gradient background with Coal India logo top-left, green title, and a footer strip of mining icons (excavator, dumper, washery, coal heap, train, power plant, handshake); a four-column header table (current, prior, Inc/Dec, Inc/Dec %) above a teal 'Reason of Variance' label and a bordered bullet box

Elemen Visual Utama

  • •Blue-and-green header table
  • •Teal 'Reason of Variance' tag
  • •Bullet list with red/green ₹ crore amounts
Halaman 50
Variance analysis

Contractual expenses

Konten

Contractual expenses for Q2 2026-27 was ₹7,326 crore versus ₹6,205 crore a year earlier (+₹1,121 cr, +18%). Reasons of variance: outsourcing for coal and OB up ₹1,099 cr, transport & wagon loading up ₹71 cr, other contractual down ₹49 cr.

Struktur Tata Letak

Light green-to-yellow gradient background with Coal India logo top-left, green title, and a footer strip of mining icons (excavator, dumper, washery, coal heap, train, power plant, handshake); a four-column header table (current, prior, Inc/Dec, Inc/Dec %) above a teal 'Reason of Variance' label and a bordered bullet box

Elemen Visual Utama

  • •Blue-and-green header table
  • •Teal 'Reason of Variance' tag
  • •Bullet list with red/green ₹ crore amounts
Halaman 51
Variance analysis

Other expenses

Konten

Other expenses for Q2 2026-27 was ₹11,878 crore versus ₹10,061 crore a year earlier (+₹1,817 cr, +18%). Reasons of variance: rates & taxes up ₹1,535 cr on high offtake, power up ₹145 cr, provisions for doubtful debts up ₹133 cr.

Struktur Tata Letak

Light green-to-yellow gradient background with Coal India logo top-left, green title, and a footer strip of mining icons (excavator, dumper, washery, coal heap, train, power plant, handshake); a four-column header table (current, prior, Inc/Dec, Inc/Dec %) above a teal 'Reason of Variance' label and a bordered bullet box

Elemen Visual Utama

  • •Blue-and-green header table
  • •Teal 'Reason of Variance' tag
  • •Bullet list with red/green ₹ crore amounts
Halaman 52
Closing slide

Thank You

Konten

Closing slide with 'Thank You' over an aerial photo of a forested reservoir (reclaimed mine landscape).

Struktur Tata Letak

Light green-to-yellow gradient background with Coal India logo top-left, green title, and a footer strip of mining icons (excavator, dumper, washery, coal heap, train, power plant, handshake); wide landscape photo band across the middle with large translucent white text

Elemen Visual Utama

  • •Aerial lake-and-forest photo
  • •Large white 'Thank You'

Pertanyaan yang Sering Diajukan

Pertanyaan umum tentang slide ini dan konten presentasi yang mendasarinya.

What were Coal India's Q2 FY27 results?

For July–September 2026, revenue from operations was ₹44,179 crore (+21% year on year), profit before tax ₹8,728 crore (+46%) and profit after tax ₹6,547 crore (+57%), with EBITDA of ₹11,447 crore and a 26% EBITDA margin on revenue.

How did Coal India perform in H1 2026-27?

H1 FY27 revenue from operations was ₹90,434 crore (+14%) and PAT ₹15,397 crore (+19%). Coal production slipped 2% to 321.00 MT, while offtake rose 8% to 384.20 MT, drawing raw coal stock down 49% to 66.58 MT.

Where was this presentation published?

Coal India filed it with the BSE and NSE as part of its H1 2026-27 results disclosure. The exchange cover letter has been removed; the 52 slides are otherwise as filed.

What period does Q2 FY27 cover for an Indian company?

Indian fiscal year 2026-27 (FY27) runs from April 2026 to March 2027, so Q2 FY27 is July–September 2026 and H1 is April–September 2026.

Which subsidiaries are broken out in the deck?

ECL, BCCL, CCL, NCL, WCL, SECL, MCL and NEC for physical performance, plus CMPDIL and CIL standalone for profit. MCL was the largest profit contributor (H1 PBT ₹6,575 crore), and ECL moved from loss to profit.

Can I download the slides as an editable PowerPoint?

Yes. The page offers the original PDF and an editable PPTX converted from it. Tables and text can be edited, though some charts may come through as images.

Is there anything to watch for in the data?

The Q2 coal offtake table (slide 13) repeats the H1 figures (384.20 MT), while the Q2 summary card on slide 11 shows Q2 offtake of 186.34 MT. Use the summary card and the Q2 sales quantity (186.32 MT) for the quarter.

Can I use this deck as a template for my own results presentation?

Yes. Its structure — highlight slides, KPI cards, subsidiary tables, P&L, expense breakdown and one 'Reason of Variance' slide per cost line — works for any multi-entity group results deck.

Sumber & bacaan lanjutan

2slides

Create Your Own Slides

Turn your ideas into professional presentations in seconds with 2slides AI.

Buat Slide Kelas Dunia dalam Hitungan Detik

Referensikan desain profesional, pilih gaya Anda, dan hasilkan slide dengan rendering teks sempurna. Didukung oleh Nano Banana—mulai buat presentasi Anda sekarang.

2Slides logo

Agen AI Anda untuk slide. Hemat waktu, bersinar lebih cepat dengan pembuatan presentasi yang cerdas.

Ringkas dengan AI

ChatGPTClaudeGrokPerplexity
Semua layanan online

© 2026 2slides. Hak cipta dilindungi.